SR. XEN
ED RECKONG PEO
Tender for shifting of existing 22KV HT and LT line from proposed dite of critical care center behind RH Reckong Peo and 3-phase LT extension from existing 22/0.4KV, 250KVA S/Stn. EVM for electrification to consumer after shifting of line in Electric
2026_HPSEB_130422_1
RPO/ED/DB-11/2025-26/121
Open Tender
Supply and Erection
30 days
RECKONG PEO
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
₹22,425
2 Apr 2026
5 Mar 2026
16 Mar 2026
5 Mar 2026
14 Mar 2026
5 Mar 2026
Dismentalement Charges of 22kV HT line.
Dismentalement charges of ST poles Three/Pole Str. (with complete accessories.)
Dismentalement charges of ST poles D/Pole Str. (with complete accessories.)
Dismentalement charges of ST poles S/Pole Str. (with complete accessories.)
De-sagging of ACSR conductor 6/1/3.35mm. (Removal of conductor & De stringing only)
ERRECTION OF 22KV H.T LINE
(i) Digging of pit, (ii) Drilling of holes in X-bracing set, X-arms (iii) Erection of pole, Laying and concreting of RCC muff (iv) fixing of insulator, X-arm, X-bracing set, (vi) fixing of Barbed wire, Danger plate (vii) filling of pit & Ramming (viii) painting of pole Four/Pole str. (Complete in all respect).
(i) Digging of pit, (ii) Drilling of holes in X-bracing set, X-arms (iii) Erection of pole, Laying and concreting of RCC muff (iv) fixing of insulator, X-arm, X-bracing set, (vi) fixing of Barbed wire, Danger plate (vii) filling of pit & Ramming (viii) painting of pole Three/Pole str. (Complete in all respect).
(i) Digging of pit, (ii) Drilling of holes in X-bracing set, X-arms (iii) Erection of pole, Laying and concreting of RCC muff (iv) fixing of insulator, X-arm, X-bracing set, (vi) fixing of Barbed wire, Danger plate (vii) filling of pit & Ramming (viii) painting of pole D/Pole str. (Complete in all respect).
(i) Digging of pit, (ii) Erection of pole, Laying and concreting of RCC muff (iii) filling of pit & Ramming (iv) Drilling of holes in X-arms (v) fixing of insulator, X-arm, knee-bracing set, top clamp (vi) fixing of Barbed wire, Danger plate (vii) painting of pole S/Pole str. (Complete in all respect).
ERRECTION OF STAY SET
(i) Digging of pit (ii)fixing of stay rod (iii) Filling of pit (iv)Nozzeling & Tighting.
ERRECTION OF EARTHING
(i) Digging of pit (ii) fixing of G.I wire to the earth system, filling of pit.
Sagging of ACSR Conductor 6/1/3.35mm (Single wire).
Laying of conductor (i) stringing & sagging (ii) binding with insulator.
Sagging of G.I Wire for earth wire
Erection of 22KV GO Switch
C/O of RCC foundation/base for 4pole str. (in RCC 1:1:5:3 size 2.5x2.5x2.7mm)
MANNUAL CARRIAGE OF H.T LINE MATERIAL CONSIDERING AVERAGE DISTANCE 0.400 K.M.
Dismentalement Charges of LT line.
Dismentalement charges of ST poles 8/9Mtr. (with complete accessories.)
De-sagging of ACSR conductor 6/1/3.35mm. (Removal of conductor & De stringing only)
ERRECTION OF L.T LINE.
(i) Digging of pit, Laying of RCC muff,Drilling of holes in poles. Erection of pole,Erection of shackle insulator, filing of pit and ramming, Painting of pole. (Complete in all respect).
ERRECTION OF STAY SET
Digging of pit, fixing of stay rod, filling of pit, Nozzeling & Tighting.) Complete in all respect.
SAGGING OF ACSR CONDUCTOR 6/1/3.35mm (Single wire).
Laying of conductor, stringing & sagging, Binding with insulator (only).
MANNUAL CARRIAGE OF L.T LINE MATERIAL CONSIDERING AVERAGE DISTANCE 0.700K.M.
MATERIAL TO BE SUPPLIED BY CONTRACTOR (Subject to the non-availability of material at Divisional Store).
HT line
Prov. RCC Muffs (2000mm) with concrete filling.
Prov. Cross Arm: [Channel Iron (100x50x6 mm),Length (3500) mm.
Prov. Cross Arm: [Channel Iron (100x50x6 mm),Length (2800) mm.
Prov. Cross Arm: [Channel Iron (100x50x6 mm),Length (1800) mm.
Prov. 22kV Pin Insulators with GI Pin (Porcelain,36kV, 10KN)
Prov. Disc Insulator Set (including Dead end clamp,Ballcleaves eye sockets, straight stapple & Bend Stapple etc.) Inluding Dead End Clamps etc.)
X-Bracing set MS Angle Iron : (50*50*6) length (2125mm)*2No.
Belt Set-MS Angle Iron:65X65X6, Length: (1800mm)*2Nos.
Prov. stay Wire (7/3.15mm)
Prov. Nuts & bolts. (off soze)
Prov. Aluminium paint.
Prov. Top clamp
Prov. MS Angle Iron (50x50x6mm), Length 2x750
Prov. support clamp
Prov. Egg Insulator.
Prov. Stay Set HT (i/c stay clamp)
Prov. Earthing set HT
Prov. GI wire (8SWG) for earth wire
Prov.GO AB Switch Unit (11KV, 400A, 25KA)Tripple pole O/D Type
Prov.X-Arms (Chanenel iron (75x40x6mm), length 2800mmx4Nos) for Supporting DO fuse unit and GO Switch.
Prov.MS Angle Iron (50x50x6mm) Length : (450mm) x 1Nos.
Prov.GO Switch Handle Supporting :[ Channel Iron (75x40x5mm), Length : 460mm.
Prov.DO Fuse Unit
LT line
Prov. RCC Muffs (2000mm) with concrete filling.
Prov. Aluminium paint.
Prov. Shackle Insulator (16KN)
Prov. GI wire (8SWG) for earth wire
Prov. D-Iron
Prov. Nuts & bolts.
Prov. LT stay set. (i/c stay clamp)
Prov. support clamp
Providing Egg Insulator.
Prov. stay Wire (7/3.15mm)
Prov. AI 50x50x6mm (for bracket 3mtr. Per Bracket)
Prov. Half Clamp (MS flat 50x6mm) 2no. Per bracket.
Prov. Full Clamp (MS flat 50x6mm) 2no. Per bracket.
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.90 MB
BOQ_192828.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid