| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.3 CrAccepted-AOC HOSPITAL ROAD P O SONAIMUKH TULARGRAM P I WARD NO 02 SONAI CACHAR ASSAM 788119 | CACHAR | ASSAM | 788119 | ₹2.3 Cr | L1 | Accepted-AOC Awarded |
| 2 | L2₹2.3 Cr+₹1.2 L (0.50%)Rejected-AOC HOJAI DISTRICT | ₹2.3 Cr+₹1.2 L (0.50%) | L2 | Rejected-AOC NA |
| 3 | L3₹2.6 Cr+₹26.3 L (11.4%)Rejected-AOC HOSPITAL ROAD P O SONAIMUKH TULARGRAM P I WARD NO 02 SONAI CACHAR ASSAM 788119 | CACHAR | ASSAM | 788119 | ₹2.6 Cr+₹26.3 L (11.4%) | L3 | Rejected-AOC NA |
| 4 | L4₹2.6 Cr+₹28.8 L (12.5%)Rejected-AOC HOSPITAL ROAD P O SONAIMUKH TULARGRAM P I WARD NO 02 SONAI CACHAR ASSAM 788119 | CACHAR | ASSAM | 788119 | ₹2.6 Cr+₹28.8 L (12.5%) | L4 | Rejected-AOC NA |
| 5 | L5₹2.6 Cr+₹30.3 L (13.1%)Rejected-AOC C O LT JALIL AHMED CHOUDHURY KAUARPUR PT II PO KAUARPUR PS SILCHAR CACHAR PIN 788005 | SILCHAR | CACHAR | ASSAM | 788005 | ₹2.6 Cr+₹30.3 L (13.1%) | L5 | Rejected-AOC NA |
| Sl No | Description | Qty | Unit | M/S PRABESH BARMAN L6 | SAMIM AKHTER CHOUDHURY L5 | M/s M.A. Enterprise L4 | DISHA ELECTRONICS L7 | Bayaj uddin Mazumder L2 | RFCC L1 | NURUL ISLAM LASKAR L3 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00Civil works | ||||||||||
| 1.00 | CARRIAGE OF MATERIALS.
Disposal of moorum/building rubbish/ malba/ similar unserviceable, dismantled or waste material by mechanical transportincluding loading, transporting, unloading to approved municipal dumping ground for lead upto 10 km for all lifts, completeas per directions of Engineer-in-charge | 500 | M3 | 300 ₹1,50,000 | 200 ₹1,00,000 Lowest | 620 ₹3,10,000 | 1,500 ₹7,50,000 | 446.69 ₹2,23,345 | 450 ₹2,25,000 | 500 ₹2,50,000 |
| 1.00 | Dismantling dressed stone work ashlar face stone work, marble work or precast concrete work manually/ by mechanical means including
stacking of serviceable and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge :
In cement mortar | 20 | M3 | 2,500 ₹50,000 | 900 ₹18,000 Lowest | 1,800 ₹36,000 | 2,000 ₹40,000 | 2,601.63 ₹52,032.6 | 1,500 ₹30,000 | 1,500 ₹30,000 |
| 1.00 | Removing mortar from and cleaning stones and concrete articles (net quantity of stacks of cleaned materials will be measured):
In cement mortar | 20 | M3 | 1,500 ₹30,000 | 500 ₹10,000 Lowest | 1,000 ₹20,000 | 1,000 ₹20,000 | 623.07 ₹12,461.4 | 650 ₹13,000 | 850 ₹17,000 |
| 1.00 | Taking out doors, windows and clerestory window shutters (steel or wood) including stacking within 50 metres lead :
Of area 3 sq. metres and below | 30 | EA | 400 ₹12,000 | 150 ₹4,500 | 200 ₹6,000 | 200 ₹6,000 | 129.73 ₹3,891.9 Lowest | 140 ₹4,200 | 900 ₹27,000 |
| 1.00 | Dismantling wood work in frames, trusses, purlins and rafters up to 10 metres span and 5 metres height including stacking the material within 50 metres lead
Of sectional area 40 square centimetres and above | 20 | M3 | 5,000 ₹1,00,000 | 650 ₹13,000 Lowest | 3,450 ₹69,000 | 6,000 ₹1,20,000 | 4,031.25 ₹80,625 | 4,000 ₹80,000 | 850 ₹17,000 |
| 1.01 | Dismantling wood work in frames, trusses, purlins and rafters up to 10 metres span and 5 metres height including stacking the material within 50 metres lead :
Of sectional area below 40 square centimetres | 100 | Metre | 150 ₹15,000 | 130 ₹13,000 | 350 ₹35,000 | 30 ₹3,000 | 16.14 ₹1,614 | 15 ₹1,500 Lowest | 850 ₹85,000 |
| 1.01 | Extra for dismantling trusses, rafters, purlins etc. of wood work for every additional span of one metre or part thereof beyond 10 metres
Of sectional area 40 square centimetres and above | 30 | CSP | 2,500 ₹75,000 | 1,500 ₹45,000 | 200 ₹6,000 Lowest | 800 ₹24,000 | 532.98 ₹15,989.4 | 590 ₹17,700 | 1,250 ₹37,500 |
| 1.01 | Extra for dismantling trusses, rafters, purlins etc. of wood work for every additional span of one metre or part thereof beyond 10 metres :
Of sectional area below 40 square centimetres
UOM AU:Metre per metre span | 200 | AU | 300 ₹60,000 | 120 ₹24,000 | 200 ₹40,000 | 10 ₹2,000 | 1.49 ₹298 Lowest | 1.65 ₹330 | 1,000 ₹2,00,000 |
| 1.01 | Extra for dismantling trusses, rafters, purlins etc. of wood work for every additional height of one metre or part thereof beyond 5 metres :
Of sectional area 40 square centimetres and above | 50 | CMM | 3,000 ₹1,50,000 | 2,500 ₹1,25,000 | 200 ₹10,000 Lowest | 1,000 ₹50,000 | 774.77 ₹38,738.5 | 860 ₹43,000 | 1,450 ₹72,500 |
Tender Value
Refer Docs
EMD Value
₹6.4 L
Closing Date
26 Dec 2025, 11:00 amClosed
Moasunep Sonowal 9435150898
Numaligarh Refinery Limited
Repair and Renovation of old Admin Building of Erstwhile Cachar Paper Mill at Panchgram (Near Silchar), Assam
2025_NRL_889385_1
PUR1011145/MOA
Open Tender
Civil Works - Buildings
Works
180 days
Panchgram (Near Silchar)
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹6.4 L
Yes
14 Mar 2026
11 Dec 2025
27 Dec 2025
11 Dec 2025
26 Dec 2025
11 Dec 2025
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Civil works | |||||
| 1.001 | CARRIAGE OF MATERIALS.
Disposal of moorum/building rubbish/ malba/ similar unserviceable, dismantled or waste material by mechanical transportincluding loading, transporting, unloading to approved municipal dumping ground for lead upto 10 km for all lifts, completeas per directions of Engineer-in-charge | 500 | M3 | - | - |
| 1.002 | Dismantling dressed stone work ashlar face stone work, marble work or precast concrete work manually/ by mechanical means including
stacking of serviceable and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge :
In cement mortar | 20 | M3 | - | - |
| 1.003 | Removing mortar from and cleaning stones and concrete articles (net quantity of stacks of cleaned materials will be measured):
In cement mortar | 20 | M3 | - | - |
| 1.004 | Taking out doors, windows and clerestory window shutters (steel or wood) including stacking within 50 metres lead :
Of area 3 sq. metres and below | 30 | EA | - | - |
| 1.005 | Dismantling wood work in frames, trusses, purlins and rafters up to 10 metres span and 5 metres height including stacking the material within 50 metres lead
Of sectional area 40 square centimetres and above | 20 | M3 | - | - |
| 1.006 | Dismantling wood work in frames, trusses, purlins and rafters up to 10 metres span and 5 metres height including stacking the material within 50 metres lead :
Of sectional area below 40 square centimetres | 100 | Metre | - | - |
| 1.007 | Extra for dismantling trusses, rafters, purlins etc. of wood work for every additional span of one metre or part thereof beyond 10 metres
Of sectional area 40 square centimetres and above | 30 | CSP | - | - |
| 1.008 | Extra for dismantling trusses, rafters, purlins etc. of wood work for every additional span of one metre or part thereof beyond 10 metres :
Of sectional area below 40 square centimetres
UOM AU:Metre per metre span | 200 | AU | - | - |
| 1.009 | Extra for dismantling trusses, rafters, purlins etc. of wood work for every additional height of one metre or part thereof beyond 5 metres :
Of sectional area 40 square centimetres and above | 50 | CMM | - | - |
stage.html
html • 0.06 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.91 MB
BOQ_934802.xls
BOQ • 0.50 MB
Tender.rar
Tender Documents • 7.79 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .