| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.2 LAccepted-AOC | L1 | Accepted-AOC Agreement executed on 20/08/2025 | |
| 2 | L2₹15.3 L+₹7,473.82 (0.49%)Rejected-AOC KR SADANAM MEVANAKONAM KALLUVATHUKKAL P O KOLLAM | L2 | Rejected-AOC Higher rate and hence not admitted |
| Sl No | Description | Qty | Unit | K R RAJEEV L2 | K R PRADEEP L1 |
|---|---|---|---|---|---|
| 1.00Roadway concreting, retarring, reconcreting, side drain and side protection wall | |||||
| 1.00 | 75.5.5.B.2pb:Modified Penetration Macadam 75 mm thick using Bitumen S-65 - Packed Bitumen Rates <br> Construction of penetration macadam over prepared base by providing a layer of compacted crushed coarse aggregate using chips spreader with alternate applications of bituminous binder and key aggregates and rolling with a three wheel 80-100 kN static roller to achieve the desired degree of compaction as per Technical Specification Clause 506. | 228.08 | sqm | 418.29 ₹95,403.58 | 416.24 ₹94,936.02 Lowest |
| 1.00 | 75.5.2.1pb:Tack Coat - With Packed Bitumen Rates <br> Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.20 to 0.25 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503. | 1,470 | sqm | 15.79 ₹23,211.3 | 15.71 ₹23,093.7 Lowest |
| 1.00 | 75.5.11.1.A.2pb:Mix Seal Surfacing - Manual Means - Type A - Bitumen S-65 - Packed Bitumen Rates <br> Providing, laying and rolling of close-graded premix surfacing material of 20 mm thickness composed of 11.2 mm to 0.9 mm (Type-A) or 13.2 mm to 0.9 mm (Type-B) aggregates using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 kN static roller and finishing to required level and grades as per Technical Specification Clause 509 <br> By Manual Means <br> Type A <br> (II) Bitumen (S-65) | 1,470 | sqm | 302.62 ₹4,44,851.4 | 301.14 ₹4,42,675.8 Lowest |
| 1.00 | 11.1.1.1:Excavation for Structures <br> Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. <br> I. Ordinary soil <br> (i) Upto 3 m depth | 39.2 | cum | 941.74 ₹36,916.21 | 937.12 ₹36,735.1 Lowest |
| 1.00 | OD72069/2025-2026:Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 <br> I. P.C.C grade M 10 <br> (i) Nominal mix 1:3:6 | 7.81 | cum | 8,654.4 ₹67,582.21 | 8,611.99 ₹67,251.03 Lowest |
| 1.01 | 11.4.2.1:Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 <br>II. P.C.C grade M 15 <br> (i) Nominal mix (1:2.5:5) | 22.04 | cum | 8,795.98 ₹1,93,863.4 | 8,752.88 ₹1,92,913.48 Lowest |
| 1.01 | 75.8.1.1.A:Providing Plain cement concrete for wearing coat CC 1:2:4 (1 cement: 2 fine aggregate:4 course aggregate) laid to required slope as required including compaction, finishingand tamping etc .complete. Max. size of course aggregate not exceeding 25mm , mixedin concrete mixer etc complete as per specification
(i) Nominal mix (1:2:4) | 1.32 | cum | 9,185.81 ₹12,125.27 | 9,140.8 ₹12,065.86 Lowest |
| 1.01 | 11.4.4:Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203<br> IV. R.C.C grade M 20 | 0.72 | cum | 9,886.05 ₹7,117.96 | 9,837.6 ₹7,083.07 Lowest |
| 1.01 | 11.8:Supplying, fitting and placingTMT bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202 | 0.51 | tonne | 1,00,427.27 ₹51,519.19 | 99,935.12 ₹51,266.72 Lowest |
Tender Value
₹15.3 L
EMD Value
₹38,134
Closing Date
11 Jul 2025, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
USHAR KRISHNAN G
Office of the Assistant Engineer, LID and EW Section, Kalluvathukkal Grama Panchayat
85/25 Concreting of Kulamada SachidanandaMadam Chempallikkonam Road and Punnottukavu LIC veetuvathukkal Road Maintanance of Kizhakkanela LPS Junction Kuttikkadu Ela Road Ward 8
2025_LSGD_773981_4
T3/LSGD/KVKL/25-26
Open Tender
Civil Works - Roads
Item Rate
180 days
KALLUVATHUKKAL GP
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
Yes
₹38,134
Yes
21 Aug 2025
3 Jul 2025
15 Jul 2025
3 Jul 2025
11 Jul 2025
3 Jul 2025
Amount
Roadway concreting, retarring, reconcreting, side drain and side protection wall
75.5.5.B.2pb:Modified Penetration Macadam 75 mm thick using Bitumen S-65 - Packed Bitumen Rates <br> Construction of penetration macadam over prepared base by providing a layer of compacted crushed coarse aggregate using chips spreader with alternate applications of bituminous binder and key aggregates and rolling with a three wheel 80-100 kN static roller to achieve the desired degree of compaction as per Technical Specification Clause 506.
75.5.2.1pb:Tack Coat - With Packed Bitumen Rates <br> Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.20 to 0.25 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503.
75.5.11.1.A.2pb:Mix Seal Surfacing - Manual Means - Type A - Bitumen S-65 - Packed Bitumen Rates <br> Providing, laying and rolling of close-graded premix surfacing material of 20 mm thickness composed of 11.2 mm to 0.9 mm (Type-A) or 13.2 mm to 0.9 mm (Type-B) aggregates using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 kN static roller and finishing to required level and grades as per Technical Specification Clause 509 <br> By Manual Means <br> Type A <br> (II) Bitumen (S-65)
11.1.1.1:Excavation for Structures <br> Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. <br> I. Ordinary soil <br> (i) Upto 3 m depth
OD72069/2025-2026:Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 <br> I. P.C.C grade M 10 <br> (i) Nominal mix 1:3:6
11.4.2.1:Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 <br>II. P.C.C grade M 15 <br> (i) Nominal mix (1:2.5:5)
75.8.1.1.A:Providing Plain cement concrete for wearing coat CC 1:2:4 (1 cement: 2 fine aggregate:4 course aggregate) laid to required slope as required including compaction, finishingand tamping etc .complete. Max. size of course aggregate not exceeding 25mm , mixedin concrete mixer etc complete as per specification (i) Nominal mix (1:2:4)
11.4.4:Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203<br> IV. R.C.C grade M 20
11.8:Supplying, fitting and placingTMT bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202
OD71900/2025-2026:Surface dressing of the ground in all kinds of soil including removing vegetation and inequalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m.
OD71964/2025-2026:Filling with Quarry Muck Filling up low lying and water logged areas with local material/ quarry muck, spreading in layers, leveling the top at site and consolidation by ramming, etc complete for improving the CBR value of subgrade.
75.8.1:Providing Plain cement concrete for road work CC 1:2:4 (1 cement: 2 fine aggregate: 4course aggregate) laid to required slope and camber in panels (@ 3 m c/c) as requiredincluding compaction, finishing and tamping etc .complete. Max. size of courseaggregate not exceeding 25mm , mixed in concrete mixer etc complete as perspecification (i) Nominal mix (1:2:4)
75.8.1.1:Providing plain/reinforced concrete(1 cement:2 fine aggregate: 4 course aggregate) forsubstructure as per drawings and technical specifications Clause 802, 803, 1202 & 1203as required including compaction, finishing and tamping etc .complete. Max. size ofcourse aggregate not exceeding 25mm , mixed in concrete mixer etc complete as perspecification (i) Nominal mix (1:2:4)
K R RAJEEV (BID ID -2247419)
Bidder Name
K R RAJEEV
K R PRADEEP
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1264128.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .