| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.3 LAccepted-AOC KOLLAM KOLLAM KERALA 673585 | KOZHIKODE | KERALA | 673585 | L1 | Accepted-AOC Awarded | |
| 2 | Rejected-Technical | - | Rejected-Technical L2 | |
| 3 | Rejected-Technical ANNASSERY PO THALAKKALATUR KOZHIKODE 673317 KERALA | KOZHIKODE | KERALA | 673317 | - | Rejected-Technical L3 |
Tender Value
₹8.5 L
EMD Value
₹21,184
Closing Date
7 Oct 2024, 5:00 pmClosed
Assistant Engineer
panthalayani Block Panchayath
PPanthalayani Block Panchayath Pro NO 64 25 CONSTRUCTION OF BUILDING FOR ADUVADU CULTURAL CENTER ATHOLI GP
2024_LSGD_693192_1
AE/PBP/64/24-25
Open Tender
Civil Works - Buildings
Item Rate
120 days
atholi
PPanthalayani Block Panchayath Pro NO 64 25 CONSTRUCTION OF BUILDING FOR ADUVADU CULTURAL CENTER ATHOLI GP
7 documents required · 7 mandatory
₹1,870
Yes
₹21,184
Yes
7 Jan 2025
30 Sept 2024
9 Oct 2024
30 Sept 2024
7 Oct 2024
30 Sept 2024
Amount
Building Work
5.2.2:Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)
5.3:Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 15<sup>0</sup> landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) : 3 graded stone aggregate 20 mm nominal size).
5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers
5.9.7:Centering and shuttering including strutting, etc. and removal of form for:Stairs, (excluding landings ) except spiral - staircases)
5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
50.6.7.2:Laterate masonry with neatly dressed laterate stone of size 40x20x15cm or nearest size in cement mortar 1:6 for super structure above plinth level up to floor two level including all cost of materials, labour charges etc.
50.2.25.1:Filling with contractor's own earth ( excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction of site Engineer-in-charge
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
50.6.3.2:Solid block masonry using pre cast solid blocks (Factory made) of size 40x20x10 cm or nearest available size confirming to IS 2185 part I of 1979 for super structure up to floor two level for 10 cm thick wall in : CM 1:6 ( 1 cement : 6 coarse sand) including cost of scaffolding complete
9.48.1:Providing and fixing M.S. Grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete.Fixed to steel windows by welding
LATHEESH P V
SHAMEJ T
Bidder Name
RITHU M.V
SHAMEJ T
LATHEESH P V
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .