Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance T 10 3RD FLOOR CITY CENTRE PRESS COMPLEX PLOT NO 1 M P NAGAR ZONE I BHOPAL M P 462011 | BHOPAL | BHOPAL | MADHYA PRADESH | 462011 | Admitted-Finance |
| 4 | Admitted-Finance | Admitted-Finance |
| 5 | Rejected-Technical | Rejected-Technical Non-Responsive |
Tender Value
Refer Docs
EMD Value
₹10 L
Closing Date
3 Jul 2023, 4:00 pmClosed
EE FSD AP RCD RANCHI
Office of the Executive Engineer, Field Survey Division ,Advance Planning , Road Construction Department, Ranchi
Consultancy services for preparation of Detailed project report for Elevated Road/Cable Stayed bridge/Suspension bridge/Extradosed bridge from Justice LPN Shahdeo Chowk (on Ranchi-Patratu road) to Ring road via RINPAS
2023_CECOM_72524_1
RCD/FSD/AP/RAN/36/23-24
Open Tender
Consultancy
90 days
RANCHI
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
EE FSD AP RCD RANCHI
₹10 L
CE CDO RCD JHARKHAND RANCHI
17 Jan 2024
15 Jun 2023
4 Jul 2023
15 Jun 2023
3 Jul 2023
15 Jun 2023
23 Jun 2023
Financial Proposal
Financial Proposal for providing the Consultancy services for preparation of Detailed project report for Elevated Road/Cable Stayed bridge/Suspension bridge/Extradosed bridge from Justice LPN Shahdeo Chowk (on Ranchi-Patratu road) to Ring road via RINPAS including replacement of culverts and bridges, proposal for new culverts and bridges, complete Land Acquisition Proposal including ownership details all complete as per latest guidelines, Resettlement and Rehabilitation Proposal and Forest Diversion Proposal with clearance of all stages etc as required, at Ranchi in the state of Jharkhand. Tentative Length of the road stretch -8.50Km. in accordance with "RFQ-CUM-RFP" document. Lump-Sum total cost of the Assignment (inclusive of GST)
Brick work in C.M 1:5 mix using 2nd class ground moulded chamber burnt bricks with including cost and conveyance of all materials and including all labour charges etc complete
Plastering in C.M 1:5-12 mm thick with including cost and conveyance of all materials and including all labour charges etc complete
CUBE ENGITECH CONSULTANT PVT LTD
Construma Consultancy Pvt. Ltd.
SPARSH ENGINEERING COMPANY PRIVATE LIMITED
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid