Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.5 LAccepted-AOC 26 106 1 BUTTAIPETA KRISHNA ANDHRA PRADESH KRISHNA ANDHRA PRADESH 521001 | KRISHNA | ANDHRA PRADESH | 521001 | 1 | Accepted-AOC Being L1, Considered for Award of Contract | |
| 2 | 2₹2.6 L+₹11,927.20 (4.77%)Rejected-Finance | 2 | Rejected-Finance Being L2 Rejected | |
| 3 | 3₹2.7 L+₹17,994.20 (7.20%)Rejected-Finance | 3 | Rejected-Finance Being L3 Rejected |
Tender Value
₹2.4 L
EMD Value
₹4,850
Closing Date
3 Dec 2020, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
The SA, ASI, Amaravati Circle, Vijayawada
Aurobindo Plaza,6-134/1, Kanuru Main Road, Kanuru, Vijayawada -520007 (A.P)
As per the NIT Document
2020_ASI_597533_1
15/NIT/2020-21/Amaravati /Nagarjunakonda Subcircle
Open Tender
Civil Works
Item Rate
120 days
Chejerla, Guntur Dist.
As per the NIT Document
6 documents required · 6 mandatory
₹0
₹4,850
4 Jan 2021
17 Nov 2020
4 Dec 2020
17 Nov 2020
3 Dec 2020
17 Nov 2020
90 days
Amount
Description of items
Item No.7: Careful removal of fallen inner and outer Prakara wall and stacking useful material for reuse and disposal of debris away from the Monument. Including cost, conveyance of all materials and labour charges, loading and un loading charges, transportation charges etc. complete and including GST and other applicable taxes if any. Complete item of work as per specifications and as directed by the site in-charge.
Item No.8: Laying brick jelly lime concrete with lime mortar 1:2 using brick jelly of 20mm thick and below for foundation concrete of 0.20m thick. Including cost, conveyance of all materials and labour charges, loading and un loading charges, transportation charges etc. complete and including GST and other applicable taxes if any. Complete item of work as per specifications and as directed by the site in-charge
Item No.9: Reconstruction of core wall of Inner and outer prakara with available R.R. stones in Lime Mortar (1:2) as per the existing and available Clues, layer by layer of basement and core walls as per the original pattern. Including cost, conveyance of all materials and labour charges, loading and un loading charges, transportation charges etc. complete and including GST and other applicable taxes if any. Complete item of work as per specifications and as directed by the site in-charge.
Item No.10: Core filling with Brick bats and jelly using lime mortar 1:2 layer by layer with proper ramming in between Inner core and outer core wall. Including cost, conveyance of all materials and labour charges, loading and un loading charges, transportation charges etc. complete and including GST and other applicable taxes if any. Complete item of work as per specifications and as directed by the site in-charge.
Item No. 11: Coping to the Inner Prakara wall with Brick jelly concrete in Lime Mortar 1:2. Including cost, conveyance of all materials and labour charges, loading and un loading charges, transportation charges etc. complete and including GST and other applicable taxes if any. Complete item of work as per specifications and as directed by the site in-charge
Item No.12: Plastering 20mm thick over coping with Lime Mortar (1:2) with proper gradient. Including cost, conveyance of all materials and labour charges, loading and un loading charges, transportation charges etc. complete and including GST and other applicable taxes if any. Complete item of work as per specifications and as directed by the site in-charge.
Item No.13: Restoration of Fallen Taki stone Outer Prakara wall in Dry stone masonry with 70% available 30 % New Taki stone. Including cost, conveyance of all materials and labour charges, loading and un loading charges, transportation charges etc. complete and including GST and other applicable taxes if any. Complete item of work as per specifications and as directed by the site in-charge.
Item No.14: Providing coping in Lime Concrete (1:2:4) using 20mm and Below brick aggregate with proper gradient. Including cost, conveyance of all materials and labour charges, loading and un loading charges, transportation charges etc. complete and including GST and other applicable taxes if any. Complete item of work as per specifications and as directed by the site in-charge.
V SURENDRA NAIDU
CHINTHADA VENKATA RAO
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .