| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.0 CrAccepted-AOC | ₹4.0 Cr | L1 | Accepted-AOC Work Order Allotted |
| 2 | Rejected-Technical | - | - | Rejected-Technical documents not found in order |
| 3 | Rejected-Technical C O AMWN BASUMATARY SONTOSHI NAGAR P O P S UDALGURI DIST UDALGURI BTC ASSAM PIN 7844509 | UDALGURI | UDALGURI | ASSAM | 7844509 | - | - | Rejected-Technical documents not found in order |
Tender Value
₹4.0 Cr
EMD Value
₹8.0 L
Closing Date
27 Feb 2023, 12:00 pmClosed
CHD, IRRIGATION
CHD, IRRIGATION, BTC, KOKRAJHAR
Panisheli Nawra FIS under PMKSY-HKKP (BTC) for the year 2021-22
2023_BoTC_28989_1
CHDI/ ET/2022-23/5
Open Tender
Civil Works
Works
365 days
UNDER PANERI KALAIGAON DIVISION
Please refer Tender documents.
3 documents required · 3 mandatory
₹8,000
₹8.0 L
Yes
23 Aug 2023
23 Jan 2023
27 Feb 2023
23 Jan 2023
27 Feb 2023
23 Jan 2023
Amount
Construction of Headwork and its Appurtenant Structures
Preparing / making level the ground surface for layout of Headwork / structures for fixing the required axis line by cutting the high land and filling and levelling the low land where necessary etc, complete as directed.
Earthwork in excavation in foundation of structures by means of Hydraulic Excavator in all soils including mud, silt, sandy clay from the river bed, etc, including clearing the side, dressing, etc. and removing the earth by loading to dumpers for further carriage to a safe distance, complete as directed. (0.30 CuM bucket).
Earthwork in excavation and removal of swelled up earth mixed with silt and slurry due to sand, bailing out water in foundation trenches upto required level including shuttering, shoring, dewatering by means of pump set etc. removing the spoils to a safer distance etc, complete as directed.
Cement Concrete work in proportion 1: 4: 8 with aggregate of size 13 mm to 38 mm free from dust and dirt and other foreign materials including roding (vibrating), bailing out wate where necessary and carrying with supplying all materials complete as directed. (Without shuttering) (Temporary arrangement for obtaining clear water should be made at site.)
Cement Concrete work in proportion 1: 2: 4 with aggregate of size 13 mm to 38 mm free from dust and dirt and other foreign materials including roding (vibrating), bailing out wate where necessary and carrying with supplying all materials complete as directed. (Temporary arrangement for obtaining clear water should be made at site.)
RCC work in slab, abutment cap and above abutment, pier cap, pedestal, dirt wall etc. in proportion 1:2:4 with hard river shingles of size 6 mm to 20 mm with proper reinforcement as per design including necessary curing etc. with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately).
Item No. 7 :- Cement Concrete work in proportion 1: 1 ½: 3 with aggregate of size 6 mmto 20 mm free from dust and dirt and other foreign materials including roding (vibrating), bailing out wate where necessary and carrying with supplying all materials complete as directed.(Without shuttering) (Temporary arrangement for obtaining clear water should be made at site.)
Supplying fitting fixing and laying reinforcement (TATA)in position in RCC work including cutting, bending,cranking with two piles 0.91 M (20 BWG) annealed wire hooking tying, complete as directed.
Providing 75 mm dia. Weep Holes including supplying and fixing 75 mm dia PVC pipe in weep holes, complete as directed.
Centering and shuttering including propping etc. where necessary and removal of forms after completion of C.C. and R.C.C. works complete as directed. (Measurement will be taken on the face area of timber)
Providing scaffolding work with rows of bhaluka bamboo and jati bamboo horizontal one row jati bamboo cross and placing second class planks of 0.025 M thick in between the rows tying with coir strings lacing two nos. vertical jati bamboo at both end including dismantling the scaffolding etc, complete as directed.
12 mm thick cement plastering including clearing surfaces and curing etc. complete as directed.
Collection of one man size hard river boulder of size 25 cm to 30 cm including loading, unloading, stacking at measurable stacks at site not more than 1 m height including paying forest royalty, sale tax etc. complete as directed.
Carriage of sand, gravel boulder etc by truck including loading unloading and stacking in measurable stacks etc. complete as directed ( Rate for 1st KM) (Quarry = Gitibari =Distance = 20 Km.
Carriage of boulder, gravels, metals, screening sand etc. by truck including loading, unloading and stacking in measurable stacks at site as directed complete. (for subsequent Km.) (Quarry = Gitibari =Distance = 19 Km.
Labour charge for pitching with one man size boulder including dressing and ramming the seat to proper size and slope with voids filling and local carriage of boulders from a distance of 50 m with lift up to 3.00 m Complete as directed.
Plum concrete work in 40% plum hard boulder 15cm to 23cm size and filling the interstices with 60% of C.C. in prop. 1:3:6 of 13 mm to 38 mm aggregate including shuttering, curing etc. complete as directed. (Temporary arrangement for obtaining clear water should be made at site.) (Av. Quarry distance = 25 KM)
Earthwork in back filling of structures, obtained from outside borrow pits filling in 15 cm layers, ramming, dressing, watering, including paying compensation of land if any (with lead up to 30 M and lift 1.5 M).
Supplying, fitting, fixing of steel gate of cross & Head Regulator as per design & drawing & specification including supplying of steel beams, channel section, Rubber seal etc including all materials embedded partly where necessary & manually operated chorister equip mints including carriage of all materials to work site complete.
Supply of Z-type Sheet Pile of effective width 0.69 M, thickness 8 mm and average weight 68.30 Kg/M including loading and unloading.
Driving 'Z' type steel sheet pile of 0.69 M effective width, 8 mm thick and average weight 68.30 kg/M to specified level and lines including cutting to proper size, making holes including painting sheet piles with two coats of anticorrosive bitumen paint and dewatering including necessary tools and plants and all other accessories, complete as directed. (Portion of sheet pile are to be embedded in concrete shall not be painted).
Supplying and laying of filter bajries in the gaps between the cement concrete protection block complete as directed. (6 mm to 20 mm size aggregates.Considering average distance from quarry to the work site = 25.00 Km)
Supplying and mixing rapidite in concrete works below ground water level where necessary etc. complete as directed.
(1) 5 HP Disel Pump
(2) 10 HP Disel Pump
Construction of Guide Bund, Afflux Bund, Diversion Channel & Closing Bund
Earthwork in excavation in diversion / feeder channel to the design section and grade by depositing the spoils in the form of an embankment on either side to the design section and grade in layers not exceeding 15 cm thick including clearing light jungle and trees upto 15 cm dia and uprooting roots and stumps etc. from the seat of the embankment and canal and free from all vegetation including breaking clods not more than 10 mm cube, ramming, dressing, bailing out stagnant rain water necessary complete as directed with a lead upto 30 M and lift upto 1.50 M.
Earth work in all soils in canal embankment and bed filling as per design section and grade by cart carriage for a minimum distance of 1 Km. including paying compensation of earth obtained from private land if any, loading, unloading and stacking in measurable stacks not more than 1m height, spreading the same in 15 cm thick including clearing light jungles, removing trees up to 15cm dia uprooting roots and stumps etc. from the seat of embankment, profiling with all lift complete as directed. (Payment will be made after 12.5% shrinkage allowances from the gross quantity.)
Earthwork in excavation and removal of swelled up earth mixed with silt and slurry due to sand, bailing out water in foundation trenches upto required level including shuttering, shoring, dewatering by means of pump set etc. removing the spoils to a safer distance etc, complete as directed.
Centering and shuttering including propping etc where necessary and removal of forms after completion of C.C. and R.C.C. works, complete as directed. (Measurement to be taken on the face area timbered).
CC work in proportion 1:2:4 in foundation / abutment / piers / wing walls etc. with hard river shingles of size 13 mm to 38 mm including curing with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately).
Supplying fitting fixing and laying reinforcement (TATA) in position in RCC work including cutting, bending,cranking with two piles 0.91 M (20 BWG) annealed wire hooking tying, complete as directed.
Plain CC work in 40% plum hard river boulder of 15 cm to 23 cm size and filled interstices with 60% cement concrete in proportion 1:3:6 with 13 mm to 38 mm size river shingles including curing, shuttering etc, complete as directed. (Shuttering cost will be paid separately).
Construction of whole bamboo single pallasiding with matured Bhaluka bamboo pst 7.50 cm to 10 cm dia 5 cm clear apart 1.50 m to 1.00 m above ground and 1.00 m to 1.2o m below ground with jati bamboo structs placed 1.20 m to 1.50 m apart tied with galvd. wire of 16 G to 18 G and complete with three rows half jati bamboo kamies.Complete as directed.
Supplying and laying of empty cement bags filled with sand/earth (As locally available) including stiching the mouth,laying,fixing in position with supply of bags,sutlies etc. Complete as directed.
Collection and supply of sand mixed gravel contains 40% of sand and 60% of river gravel of size 13 mm to 38 mm free from all foreign materials including carriage from quarry to the work site loading, unloading and stacking in measurable stacks as directed by the department (Including paying of forest royalty and sales tax etc.)
Carriage of sand, gravel boulder etc by truck including loading unloading and stacking in measurable stacks etc. complete as directed ( Rate for 1st KM) (Quarry = Gitibari =Distance = 20 Km.
Carriage of boulder, gravels, metals, screening sand etc. by truck including loading, unloading and stacking in measurable stacks at site as directed complete. (for subsequent Km.) (Quarry = Gitibari =Distance = 19 Km.
Labour charge for spreading of hard river gravel/broken stone/sandgravel mixture of size of gravel 13 mm to 38 mm to the required thickness including ramming and dressing the seat before laying the materials as directed complete including all carriage etc.
Cattle Crossing Slab
Earth work in excavation in foundation of canal structure in all types of soils as per design and drawing including dressing the foundation, shoring etc. removing the surplus spoils by head load to a safe distance from the working place and depositing required spoils in uniform layers dressing, watering, breaking clods not more than 10mm cube with compensation etc. complete as directed. (Including bailing out stagnant rain water where necessary). All types of soils except soil mixed with gravel and boulders. (For normal lead of 30 m and lift of 1.5 m)
Cement Concrete work in proportion 1: 4: 8 with aggregate of size 13 mm to 38 mm free from dust and dirt and other foreign materials including roding (vibrating), bailing out wate where necessary and carrying with supplying all materials complete as directed. (Without shuttering) (Temporary arrangement for obtaining clear water should be made at site.) (A) River Singles (i) Without shuttering & without dewatering
Reinforced Cement Concrete work in proportion 1: 2: 4 with aggregate of size 13 mm to 38 mm free from dust and dirt and other foreign materials including roding (vibrating), bailing out wate where necessary and carrying with supplying all materials complete as directed. (Temporary arrangement for obtaining clear water should be made at site.) (a) River Singles (i) Without shuttering & without Dewatering
Supplying, fitting, fixing and laying in position M.S. rod/ Torsteel/TMT bars of all sizes as per design and drawing as required including cutting, bending, cranking with necessary lappage and tying with black wire complete as directed
Centering and shuttering including propping etc. where necessary and removal of forms after completion of C.C. and R.C.C. works complete as directed. (Measurement will be taken on the face area of timber) (a) Shuttering Slab (Fitting and dismentling)
6 mm thick cement plastering including clearing surfaces and curing etc. complete as directed. ii) In Prop. 1:4
Earth work in back filling of structure with earth obtaining from outside borrow pits, filling with 15 cm layer ramming, dressing and compaction and watering including paying compensation of land, if any with lead up to 30m and lift 1.50m complete as directed
Canal Outlet
Earth work in excavation in foundation of canal structure in all types of soils as per design and drawing including dressing the foundation, shoring etc. removing the surplus spoils by head load to a safe distance from the working place and depositing required spoils in uniform layers dressing, watering, breaking clods not more than 10mm cube with compensation etc. complete as directed. (Including bailing out stagnant rain water where necessary). All types of soils except soil mixed with gravel and boulders. (For normal lead of 30 m and lift of 1.5 m)
Centering and shuttering including propping etc. where necessary and removal of forms after completion of C.C. and R.C.C. works complete as directed. (Measurement will be taken on the face area of timber) (a) Shuttering Slab (Fitting and dismentling)
Cement Concrete work in proportion 1: 4: 8 with aggregate of size 13 mm to 38 mm free from dust and dirt and other foreign materials including roding (vibrating), bailing out wate where necessary and carrying with supplying all materials complete as directed. (Without shuttering) (Temporary arrangement for obtaining clear water should be made at site.) (A) River Singles (i) Without shuttering & without Dewatering
Cement Concrete work in proportion 1: 3: 6 with aggregate of size 13 mm to 38 mm free from dust and dirt and other foreign materials including roding (vibrating), bailing out wate where necessary and carrying with supplying all materials complete as directed. (Temporary arrangement for obtaining clear water should be made at site.) (A) River Singles (ii) Without shuttering & without Dewatering
Supplying of R.C.C spun pipes of different dia including loading, unloading and stacking etc. up to the departmental godown complete as directed.
Earth work in back filling of structure with earth obtaining from outside borrow pits, filling with 15 cm layer ramming, dressing and compaction and watering including paying compensation of land, if any with lead up to 30m and lift 1.50m complete as directed
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .