| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.5 LAccepted-Finance DEHRADUN | DEHRADUN | UTTARAKHAND | 248001 | ₹7.5 L | L1 | Accepted-Finance 1ST LOWEST |
| 2 | L2₹7.6 LRejected-Finance 20 C RAGHUVANSH ENCLAVE KALIDAS ROAD DEHRADUN | ₹7.6 L | L2 | Rejected-Finance 2ND LOWEST |
| 3 | L3₹7.9 LRejected-Finance C 23 CC | ₹7.9 L | L3 | Rejected-Finance 3RD LOWEST |
| 4 | L4₹8.3 LRejected-Finance 3491 14 HARIPURA DHAPAI ROAD AMRITSAR | AMRITSAR | PUNJAB | 143001 | ₹8.3 L | L4 | Rejected-Finance 4TH LOWEST |
| 5 | L5₹8.7 LRejected-Finance DEHRADUN | DEHRADUN | UTTARAKHAND | 248001 | ₹8.7 L | L5 | Rejected-Finance 5TH LOWEST |
| Sl No | Description | Qty | Unit | TARUN ENGINEERING WORKS L5 | shreyansh construction L2 | RAMAN CONSTRUCTION CO. L3 | AMARJEET SINGH AND CO. L4 | Appar Construction & Engineers L1 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Demolition of lime concrete in floors and paving exe 15 cm thick above ground floor (sunken floor) including picking, sweeping cleaning with wire brush and washing down with water to remove dust, dirt to get surface free of laitance , scales, oil or any othet loose material and removing the demolished material outside the MOD land.Complete all as specified and directed | 7.2 | cum | 321 ₹2,311.20 | 100 ₹720 | 329 ₹2,368.80 | 410 ₹2,952 | 700 ₹5,040 |
| 2.00 | M/L for PCC 1:1.5:3 type A-0 (Using 12.5mm stone aggregate)as in concrete angle-fillets with a radiaus of 75mm shall be provided at junctions between roofs, floor and vertical faces of walls (parapet, pillar for water tank staging and sunken floor) around obstacles such as pipes, chimney stacks, etc. and other similar situation to ease up about corners mixed with Liquied water proffing compound (as per manufactur direction ) | 0.36 | cum | 6,000 ₹2,160 | 4,000 ₹1,440 | 5,200 ₹1,872 | 3,200 ₹1,152 | 8,100 ₹2,916 |
| 3.00 | Providing and application two coat of acrylic polymer modified cementitious flexible waterproof coating on horizontal and vertical surface for sunken floor as per manufacturer direction after base preparation of cleaning, brushing and removal of flaky materials. The coatings shall be applied at intervals and as per the manufacturer’s specifications and approved by Engineer in Charge .
Note : Ponding test after water proofing coating willl be done for ponding for 48 Hrs . | 28.8 | Sqm | 300 ₹8,640 | 150 ₹4,320 | 151 ₹4,348.80 | 750 ₹21,600 | 220 ₹6,336 |
| 4.00 | M/L for 15 mm thick protection plaster CM 1:4 floor and wall with polymer modified repair mortar (SBR Latex liquid polymer as per manufactur direction ).Complete all as specified and directed Note :- The rates of SBR quoted shall deemed to be included for these items | 28.8 | Sqm | 260 ₹7,488 | 150 ₹4,320 | 221 ₹6,364.80 | 320 ₹9,216 | 140 ₹4,032 |
| 5.00 | M/L for providing 40 mm dia GI pipe (medium grade) spout projecting at least 300 mm beyond outer face of wall or as per direction of Engr-in-charge | 6 | RM | 300 ₹1,800 | 600 ₹3,600 | 299 ₹1,794 | 410 ₹2,460 | 250 ₹1,500 |
| 6.00 | M&L for cement concrete 1:7:12 type F2(using 40 mm graded stone aggregate) as in filling of sunken portion complete all as specified and directed.Complete all as specified and directed | 6 | cum | 4,000 ₹24,000 | 4,000 ₹24,000 | 2,100 ₹12,600 | 3,200 ₹19,200 | 3,800 ₹22,800 |
| 7.00 | M&L for 30 mm thick PCC Type B-0, 1:2:4, (using 12.5 mm graded stone aggregate) as in floor mixed with SBR Latex liquid polymer as per manufactur direction.Complete all as specified and directed
Note :- The rates of SBR quoted shall deemed to be included for these items | 30.4 | Sqm | 500 ₹15,200 | 300 ₹9,120 | 221 ₹6,718.40 | 250 ₹7,600 | 220 ₹6,688 |
| 8.00 | Dismantling floor hearth or wall tiling including cement mortar bedding (but not backing), removing and rubbish off the premises from MoD all as specified and directed. | 370 | Sqm | 20 ₹7,400 | 20 ₹7,400 | 9 ₹3,330 | 25 ₹9,250 | 55 ₹20,350 |
| 9.00 | M&L for Non- skid coloured ceramic tiles 7 to 8mm thick area of each tile exceeding 0.11 sqm but not exceeding .18sqm in floor etc incl 15mm thick screed bed in CM 1:6, Set and jointed in neat cement slurry and pointed in white or coloured cement to match the shade of the tiles.Tiles shall be confirming to IS-15622.2006, Group B II with average water absorption between 3% to 6%. Length, width and straightness of sides + 0.10% (Max deviation). Thickness + 5.0% (Max deviation). Centre & Edge curvature and warpage + 0.50% (Max deviation). Breaking strength 1000 N (Minimum) and minimum 95% tiles shall be free from visible defects.Note:- Shade of the tiles including Colour, design and pattern shall be approved by AGE | 45 | Sq. M | 921 ₹41,445 | 900 ₹40,500 | 870 ₹39,150 | 900 ₹40,500 | 950 ₹42,750 |
| 10.00 | M&L for coloured glazed ceramic tiles of any design and pattern, 300x450x 7 to 8 mm thick, as in dado etc incl 10 mm thick rendering in CM 1:4, Set and jointed in neat cement slurry and pointed in white of coloured cement to match the shade of the tiles . Tiles shall be confirming to IS-15622:2017, Group B III with average water absorption between 10% to 15%. Length, width and straightness of sides + 0.20% (Max deviation). Thickness + 4.0% (Max deviation). Straightness of sides and Rectangularity +0.15% (Max Deviation). surface flatness + 0.22% (Max deviation). Breaking strength 500 N (Minimum) and minimum 95% tiles shall be free from visible defects.
Note: Shade of the tiles including Colour, design and pattern shall be got approved by AGE(I)
.Complete all as specified and directed | 83 | Sq. M | 921 ₹76,443 | 800 ₹66,400 | 861 ₹71,463 | 900 ₹74,700 | 1,000 ₹83,000 |
Updated dates
Tender Value
₹9 L
EMD Value
₹18,000
Closing Date
23 May 2026, 6:00 pmClosed
AGE (i) RAIWALA
AGE (i) RAIWALA
REPAIR/ MAINTENANCE OF PLUMBING WORK INCLUDING WATER, SANITARY FITTINGS, SOIL WASTE AND VENT PIPES AND CONNECTED BR WORKS AT ZONE D AT MIL STN RAIWALA UNDER AGE (I) RAIWALA
2026_MES_762336_1
8134/26-27/E8
Open Tender
Civil Works
120 days
AGE (I) RAIWALA
Please refer Tender documents.
8 documents required · 8 mandatory
₹500
Yes
AGE (I) RAIWALA
₹18,000
Yes
9 Jun 2026
27 Apr 2026
25 May 2026
27 Apr 2026
23 May 2026
10 May 2026
27 Apr 2026 - 9 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolition of lime concrete in floors and paving exe 15 cm thick above ground floor (sunken floor) including picking, sweeping cleaning with wire brush and washing down with water to remove dust, dirt to get surface free of laitance , scales, oil or any othet loose material and removing the demolished material outside the MOD land.Complete all as specified and directed | 7.2 | cum | - | - |
| 2 | M/L for PCC 1:1.5:3 type A-0 (Using 12.5mm stone aggregate)as in concrete angle-fillets with a radiaus of 75mm shall be provided at junctions between roofs, floor and vertical faces of walls (parapet, pillar for water tank staging and sunken floor) around obstacles such as pipes, chimney stacks, etc. and other similar situation to ease up about corners mixed with Liquied water proffing compound (as per manufactur direction ) | 0.36 | cum | - | - |
| 3 | Providing and application two coat of acrylic polymer modified cementitious flexible waterproof coating on horizontal and vertical surface for sunken floor as per manufacturer direction after base preparation of cleaning, brushing and removal of flaky materials. The coatings shall be applied at intervals and as per the manufacturer’s specifications and approved by Engineer in Charge .
Note : Ponding test after water proofing coating willl be done for ponding for 48 Hrs . | 28.8 | Sqm | - | - |
| 4 | M/L for 15 mm thick protection plaster CM 1:4 floor and wall with polymer modified repair mortar (SBR Latex liquid polymer as per manufactur direction ).Complete all as specified and directed Note :- The rates of SBR quoted shall deemed to be included for these items | 28.8 | Sqm | - | - |
| 5 | M/L for providing 40 mm dia GI pipe (medium grade) spout projecting at least 300 mm beyond outer face of wall or as per direction of Engr-in-charge | 6 | RM | - | - |
| 6 | M&L for cement concrete 1:7:12 type F2(using 40 mm graded stone aggregate) as in filling of sunken portion complete all as specified and directed.Complete all as specified and directed | 6 | cum | - | - |
| 7 | M&L for 30 mm thick PCC Type B-0, 1:2:4, (using 12.5 mm graded stone aggregate) as in floor mixed with SBR Latex liquid polymer as per manufactur direction.Complete all as specified and directed
Note :- The rates of SBR quoted shall deemed to be included for these items | 30.4 | Sqm | - | - |
| 8 | Dismantling floor hearth or wall tiling including cement mortar bedding (but not backing), removing and rubbish off the premises from MoD all as specified and directed. | 370 | Sqm | - | - |
| 9 | M&L for Non- skid coloured ceramic tiles 7 to 8mm thick area of each tile exceeding 0.11 sqm but not exceeding .18sqm in floor etc incl 15mm thick screed bed in CM 1:6, Set and jointed in neat cement slurry and pointed in white or coloured cement to match the shade of the tiles.Tiles shall be confirming to IS-15622.2006, Group B II with average water absorption between 3% to 6%. Length, width and straightness of sides + 0.10% (Max deviation). Thickness + 5.0% (Max deviation). Centre & Edge curvature and warpage + 0.50% (Max deviation). Breaking strength 1000 N (Minimum) and minimum 95% tiles shall be free from visible defects.Note:- Shade of the tiles including Colour, design and pattern shall be approved by AGE | 45 | Sq. M | - | - |
| 10 | M&L for coloured glazed ceramic tiles of any design and pattern, 300x450x 7 to 8 mm thick, as in dado etc incl 10 mm thick rendering in CM 1:4, Set and jointed in neat cement slurry and pointed in white of coloured cement to match the shade of the tiles . Tiles shall be confirming to IS-15622:2017, Group B III with average water absorption between 10% to 15%. Length, width and straightness of sides + 0.20% (Max deviation). Thickness + 4.0% (Max deviation). Straightness of sides and Rectangularity +0.15% (Max Deviation). surface flatness + 0.22% (Max deviation). Breaking strength 500 N (Minimum) and minimum 95% tiles shall be free from visible defects.
Note: Shade of the tiles including Colour, design and pattern shall be got approved by AGE(I)
.Complete all as specified and directed | 83 | Sq. M | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.73 MB
BOQ_853910.xls
BOQ • 1.13 MB
MAKEAPPROVAL.pdf
Additional Documents • 15.01 MB
8134TENDER.pdf
Tender Documents • 1.83 MB
Download all tender documents and submit your bid