Loading…
Loading…
Tender Value
₹3.1 L
EMD Value
₹6,200
Closing Date
23 Apr 2026, 4:00 pmClosed
Executive Engineer RnB Division Budgam
Engineering complex Budgam
Construction of Girls Toilet at MS Kremshore.
2026_PWDJK_307995_7
NIT_No_04_DB_2026-27
Open Tender
Civil Works
Percentage
40 days
Kremshore Budgam
Please refer Tender documents.
3 documents required · 3 mandatory
₹200
Executive Engineer RnB Division Budgam
₹6,200
16 Apr 2026
16 Apr 2026
24 Apr 2026
16 Apr 2026
23 Apr 2026
16 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil : | |||||
| 2P/L of dry stone soling duly hand packed including all carriages loading unloading complete job before laying of mud mate in trenches incl. all carriages of material involved & head load. | |||||
| 3Providing and laying in position cement concrete in 1:4:8 grade as Mudmat including curing but excluding the cost of centring and shuttering.All works upto plinth level. | |||||
| 4Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level with 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | |||||
| 5Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | |||||
| 6Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | |||||
| 7Centering and shuttering including strutting, propping etc. and removal of form for: | |||||
| 7.01 | Foundations, footings, bases of columns etc. for mass concrete. | - | sqm | 286.35 | - |
| 7.02 | Suspended floors, roofs, landings, balconies and access platforms. | - | sqm | - | - |
| 8 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level Mild steel and medium tensile steel bars | - | kgs | 115.35 | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.30 MB
BOQ_998633.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .