Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹5.8 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹6.1 L+₹33,405.73 (5.78%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹6.5 L+₹75,280.53 (13.0%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | L4₹7.0 L+₹1.2 L (20.4%)Admitted-Fee/PreQual/Technical/Finance | L4 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹7.8 L
EMD Value
₹15,680
Closing Date
12 Aug 2026, 4:00 pmClosed
XEN R AND B RAFIABAD
OFFICE OF XEN R AND B RAFIABAD
Construction of Patwari Khana at Ladoora Watergam Baramulla
2026_PWDJK_318607_1
e nit 35 of 2026-27 dated 30/07/2026
Open Tender
Civil Works
Percentage
120 days
RAFIABAD
NIT
2 documents required · 2 mandatory
₹300
EXEN R AND B RAFIABAD
₹15,680
21 Aug 2026
30 Jul 2026
13 Aug 2026
30 Jul 2026
12 Aug 2026
30 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 2 | 1. Earth work in excavation by Manual/mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil /Boulders | 14.27 | CUM | 256.85 | ₹3,665.25 |
| 3 | 2. Supply and laying of Stone soling hand packed broken stones in layers including Consolidation with hand ramming. | 11.76 | CUM | 1,000 | ₹11,760 |
| 4 | 3. Providing and laying in position cement concrete. All works upto plinth level 1:4:8 (1 cement: 4 coarse sand: 8 graded stone aggregate 40mm nominal size) crushed. | 2.21 | CUM | 5,202.9 | ₹11,498.41 |
| 5 | Providing and laying in position specified grade of reinforced cement concrete including
curing but excluding the cost of centering, shuttering, finishing and reinforcement. All
works upto plinth level | 2.97 | CUM | 7,788.4 | ₹23,131.55 |
| 6 | Reinforced cement concrete work in walls (any thickness) including attached pilasters,
buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and
struts upto floor five level including curing but excluding cost of centering shuttering,
finishing and reinforcement. | 3.4 | CUM | 9,395.7 | ₹31,945.38 |
| 7 | 5. Reinforcement for RCC work including straightening, cutting, bending, placing in position and binding all complete. Thermo mechanically treated bars | 764.42 | KG | 123.2 | ₹94,176.54 |
| 8 | 6. Centering and shuttering including strutting, propping etc. and removal of form for | 115.96 | sqm | 286.35 | ₹33,205.15 |
| 9 | LINTEL,Beams suspended floors etc | 24.96 | SQM | 577.25 | ₹14,408.16 |
| 10 | 7. Providing and laying in position cement concrete in 1:2:4 (1 cement: 2coarse sand: 4 graded stone aggregate 20 mm nominal size)crushed upto plinth level . | 13.48 | CUM | 6,591.25 | ₹88,850.05 |
| 11 | 8 . Brick work class designation 75 in foundation and plinth in cement mortar 1:4 ( 1 cement: 4 coarse sand) including carriage of all materials complete job.(Rates in vouge in R&B Department) | 7.99 | CUM | 9,500 | ₹75,905 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.39 MB
BOQ_1051010.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .