The Project Director , DRDA,Dindigul
The Project Director , DRDA,Dindigul
Strengthening Upgradation of Roads under Pradhan Mantri Gram Sadak Yojana III 2023-24 Batch I including Maintenance TN05-188 Vedasandur- Dindigul District
2024_RDTN_134307_1
TN5188
Open Tender
Civil Works - Roads
Item Rate
270 days
DINDIUGL DISTRICT
Strengthening Upgradation of Roads under Pradhan Mantri Gram Sadak Yojana III 2023-24 Batch I including Maintenance TN05-188 Vedasandur- Dindigul District
2 documents required · 2 mandatory
₹0
₹4.4 L
DRDA,DINDIGUL
1 Oct 2024
17 May 2024
18 Jul 2024
17 May 2024
18 Jul 2024
17 May 2024
29 May 2024
Amount
Upgradation of MRL - 18 NH-7 to Ottanagampatti Via Thammampatty Km. 0/0 - 3/470 Estimate Amount : Rs. 201.72 Lakhs
Clearing and Grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201. (i) (A) - By Manual Means (In Area of Non - Thorny Jungle)
Scarifying the Existing Bituminous road surface to a depth of 100 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4.
Construction of Embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5
Construction of Embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 (Gravel Shoulder)
Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406 (WMM).
Providing and laying Bituminous Macadam with hot mix plant using crushed aggregates of grading as per Table 500.4 premixed with bituminous binder, transported to site upto a lead of 1000 m laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled to achieve the desired compaction as per Technical Specification Clause 504.
Providing and applying Prime Coat with Bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502. (i) Low Porosity
Providing and applying Prime Coat with Bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.90-1.2 kg/sqm using mechanical means as per Technical Specification Clause 502. (i) Medium Porosity [RBI].
Providing and applying Tack Coat with Bitumen Emulsion (RS-1) using emulsion distributor at the rate of 0.20 to 0.25 kg per sqm on the prepared Granular surface treated with Primer & cleaned with Hydraulic broom as per Technical Specification Clause 503 (ii).
Providing, laying and rolling of Close-Graded Premix surfacing material of 25 mm thickness composed of 11.2 mm to 0.9 mm (Type-A) or 13.2 mm to 0.9 mm (Type-B) aggregates using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 kN static roller and finishing to required level and grades as per Technical Specification Clause 509 [MIX SEAL SURFACING].
NEW TECHNOLOGY [RBI] Providing, Laying and Spreading Base Course on a prepared surface, including mixing of 50% 22.4 mm Down Aggregate, 50% Stone Dust and 2.5% RBI -81 by mix in place with rotavator and grading with motor grader and compacting with 8-10 tonne Vibratory Compactor at OMC to the desired density as per specifications MoRTH 403.
Provision for Cross Drainage Works
Construction of Two Row Pipe Culvert at Ch 120, 540, 1050
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202.
Removal of Pipes @ Ch. 120
Removal of Pipes @ Ch. 540
Removal of Pipes @ Ch. 1050
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202.
Removal of Body wall @ Ch. 120
Removal of Body wall @ Ch. 540
Removal of Body wall @ Ch. 1050
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.
2 Row Pipe Culvert @ Ch. 120
2 Row Pipe Culvert @ Ch. 540
2 Row Pipe Culvert @ Ch. 1050
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.
2 Row Pipe Culvert @ Ch. 120
2 Row Pipe Culvert @ Ch. 540
2 Row Pipe Culvert @ Ch. 1050
Cement concrete 1 : 2.5 : 5 mix using 40mm HBG metal for foundation including watering , centering and shuttering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
2 Row Pipe Culvert @ Ch. 120
2 Row Pipe Culvert @ Ch. 540
2 Row Pipe Culvert @ Ch. 1050
Cement concrete 1 : 2 : 4 mix using 40mm HBG metal for foundation including watering, centering and shuttering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed . For Footings as 4% Rate for Centering Works
2 Row Pipe Culvert @ Ch. 120
2 Row Pipe Culvert @ Ch. 540
2 Row Pipe Culvert @ Ch. 1050
Cement concrete 1 : 2 : 4 mix using 40mm HBG metal for foundation including watering, centering and shuttering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed For STEM as 10% Rate for Centering Works
2 Row Pipe Culvert @ Ch. 120
2 Row Pipe Culvert @ Ch. 540
2 Row Pipe Culvert @ Ch. 1050
Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer.
2 Row Pipe Culvert @ Ch. 120
2 Row Pipe Culvert @ Ch. 540
2 Row Pipe Culvert @ Ch. 1050
Providing and Laying reinforced Cement Concrete pipe NP3 for Culverts on first bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation protection works backfilling concrete and masonry works in head walls and parapets
2 Row Pipe Culvert @ Ch. 120
2 Row Pipe Culvert @ Ch. 540
2 Row Pipe Culvert @ Ch. 1050
Construction of Gravel/Soil-aggregate Base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with three wheel 80-100 kN static roller to achieve the desired density, complete as per Technical Specifications Clause 401 Grading III (GSB).
2 Row Pipe Culvert @ Ch. 120
2 Row Pipe Culvert @ Ch. 540
2 Row Pipe Culvert @ Ch. 1050
Construction of Wearing Coat with the length of 30 at Ch 3050
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202.
Removal of Exist.CC @ Ch. 3050
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days,using curing compound (where specified ) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501
Wearing Coat @ Ch. 3050
Provision of Guard Stones
Wearing Coat @ Ch. 3050
Provision of Rumble Strips covered with premix bituminous carpet, 15-20 mm high at centre, 250 mm wide placed at 1 m centre-to-centre at approved locations to control speed, marked with white strips of road marking paint.
Provision for Road Marking with Hot applied Thermoplastic compound with Reflectorising Glass beads on Bituminous Surface
Provision for Road Marker/ Road stud with lens Reflector
Provision for Name Board
Provision for PMGSY Logo Board
Provision for Sign Board (1 curve =2Nos)
Provision for Chevron Sign Octogan Board (90cm)
Provision for 60 cm Circle(Mandatory Sign Baoard)
Provision for Reflector - Traffic signs (Near culverts & trees) - Star sign Sticker
Provision for Citizen Information Board
Provision for Maintenance Board
Provision for KM Stone
Provision for HM Stone
For the second six months from the date of completion of work
For the second year from the date of completion of work
For the third year from the date of completion of work
For the fourth year from the date of completion of work
For the fifth year from the date of completion of work
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
SRI KUMARAN BUILDERS
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .