Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.3 LAccepted-AOC MALAMAKKAVU PO KUBALLUR VIA PALAKKADOT | PALAKKAD | KERALA | 672122 | L1 | Accepted-AOC L1 | |
| 2 | Rejected-Technical KAPPUR GRAMA PANCHAYATH | - | Rejected-Technical L2 | |
| 3 | Rejected-Technical | - | Rejected-Technical L3 |
Tender Value
₹5 L
EMD Value
₹12,500
Closing Date
8 Jul 2020, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
ASSISTANT EXECUTIVE ENGINEER
OFFICE OF THE ASSISTANT EXECUTIVE ENGINEER LSGD SUBDIVISION THRITHALA BLOCK PANCHAYAT KOOTTANAD.P.O,PALAKKAD.DIST,679533.PIN
RENOVATION OF KURINHIIKKAVU KSHETHRAM ROAD
2020_LSGD_369046_1
2/AEE/LSGD/TLA/20-21(5)
Open Tender
Civil Works - Roads
Item Rate
90 days
o/o the AEE, LSGD Sub DnThrithala Block
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,000
Yes
online
₹12,500
Yes
23 Aug 2020
1 Jul 2020
13 Jul 2020
1 Jul 2020
8 Jul 2020
1 Jul 2020
90 days
Amount
Road work
16.77 : Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material within all lifts and lead upto 1 km ( by mechanical means).
10.25.1 : Item Shifted to head 14 as item 14.74Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In stringers, treads,landings etc. of stair cases, including use of chequered plate wherever required, all complete
13.61.1 : Painting with synthetic enamel paint of approved brand and manufacture to give an even shade:Two or more coats on new work
4.1.4 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 )1 cement : 2 coarse sand : 4 graded stone aggregate 40 mm nominal size)
4.3.1 : Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
51.2.3 : Filling with Quarry Muck <br> Filling up low lying and water logged areas with local material/ quarry muck, spreading in layers, leveling the top at site and consolidation by ramming, etc complete for improving the CBR value of subgrade
16.42 : Cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 40 mm nominal size ) in pavements, laid to required slope and camber in panels as required including consolidation finishing and tamping complete
MUHAMMED ABDURAHIMAN P V
Sainudheen contractor
Bidder Name
TK. Rajan
MUHAMMED ABDURAHIMAN P V
Sainudheen contractor
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_522053.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .