Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | H1₹7.10Admitted-Finance | H1 | Admitted-Finance | |
| 2 | H2₹5.40−₹1.70 (23.9%)Admitted-Finance 5TH FLOOR KAILASH BUILDING 26 K G MARG CANAUGHT PLACE CENTRAL DELHI DELHI 110001 | NEW DELHI | DELHI | 110001 | H2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Shah Technical Consultants Pvt. Ltd H1 | WAPCOS LTD H2 |
|---|---|---|---|---|---|
| 1.10 | Consultancy Fee for preparation of DPRs / vetting of existing DPRs- Jammu Region | 100 | %age | 0.01 ₹1.3 | 0.01 ₹0.81 Lowest |
| 1.20 | Consultancy Fee for Construction Supervision and Work/Quality Monitoring)
This Consultancy fee shall be paid on Monthly basis ie The percentage quoted divided by project duration ie 36 Months on the Project Cost.- Jammu Region | 100 | %age | 0.03 ₹2.5 | 0.02 ₹2.1 Lowest |
| 2.10 | Consultancy Fee for preparation of DPRs / vetting of existing DPRs- Kashmir Region | 100 | %age | 0.01 ₹1 | 0.01 ₹0.81 Lowest |
| 2.20 | Consultancy Fee for Construction Supervision and Work/Quality Monitoring)
This Consultancy fee shall be paid on Monthly basis ie The percentage quoted divided by project duration ie 36 Months on the Project Cost.- Kashmir Region | 100 | %age | 0.02 ₹2.3 | 0.02 ₹1.68 Lowest |
Tender Value
Refer Docs
EMD Value
₹50 L
Closing Date
25 May 2023, 6:00 pmClosed
CHIRF ENGINEER JAL SHAKTI PHE KMR
NEW ENGINEERING COMPLEX RAJ BAGH SRINAGAR
PROJECT DEVELOPMENT AND MANAGEMENT CONSULTANT (PDMC) FOR ATAL MISSION FOR REJUVENATION AND URBAN TRANSFORMATION (AMRUT-2.0) FOR UT OF JANDK
2023_PHE_211263_1
RFP NO.01/WSMP OF 05/2023 DATED 03/05/2023
Limited
Consultancy
Percentage
1095 days
UT OF JAMMU AND KAHMIR
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
CAO JSD PHE KMR
₹50 L
Yes
OFFICE OF THE CHIRF ENGINEER JAL SHAKTI PHE KMR
19 Sept 2023
4 May 2023
26 May 2023
4 May 2023
25 May 2023
4 May 2023
6 May 2023
Amount
Consultancy Fee for preparation of DPRs / vetting of existing DPRs- Jammu Region
Consultancy Fee for Construction Supervision and Work/Quality Monitoring) This Consultancy fee shall be paid on Monthly basis ie The percentage quoted divided by project duration ie 36 Months on the Project Cost.- Jammu Region
Consultancy Fee for preparation of DPRs / vetting of existing DPRs- Kashmir Region
Consultancy Fee for Construction Supervision and Work/Quality Monitoring) This Consultancy fee shall be paid on Monthly basis ie The percentage quoted divided by project duration ie 36 Months on the Project Cost.- Kashmir Region
WAPCOS LTD
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .