| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.6 CrAdmitted-Finance 1ST FLOOR PLOT NO 6681 10132 CHANTAPADA P S COLLIERY FCI ROAD CHALGARN TALCHER DIST ANGUL ODISHA 759103 | TALCHER | ANGUL | ODISHA | 759103 | ₹1.6 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.8 Cr+₹21.5 L (13.3%)Admitted-Finance | ₹1.8 Cr+₹21.5 L (13.3%) | L2 | Admitted-Finance |
| 3 | L3₹1.9 Cr+₹26.8 L (16.6%)Admitted-Finance | ₹1.9 Cr+₹26.8 L (16.6%) | L3 | Admitted-Finance |
| 4 | L4₹2.2 Cr+₹54.4 L (33.7%)Admitted-Finance 3 1B MAHENDRA ROAD BHOWANIPUR KOLKATA WEST BENGAL 700025 | KOLKATA | WEST BENGAL | 700025 | ₹2.2 Cr+₹54.4 L (33.7%) | L4 | Admitted-Finance |
| 5 | L5₹2.3 Cr+₹65.2 L (40.3%)Admitted-Finance PLOT NO 54 56 UDYOG DEEP INDUSTRIAL AREA PO WAIDHAN DIST SINGRAULI MADHYA PRADESH 486886 | SINGRAULI | SINGRAULI | MADHYA PRADESH | 486886 | ₹2.3 Cr+₹65.2 L (40.3%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | UNITEC RUBBER AND CONVEYOR SYSTEMS PRIVATE LIMITED L2 | CHANDA AND COMPANY ENGG PRIVATE LTD L4 | Gill Engineering Pvt. Ltd. L6 | Sivasakthi Power Services Pvt Ltd L7 | viswa engineering L3 | Waidhan Engineering And Industries Pvt Ltd L5 | THEJO ENGINEERING LIMITED L1 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | JOINING OF TEXTILE CONVEYOR BELTS OF ALL WIDTHS BY COLD VULCANISING METHOD INCLUDING COST OF VULCANISING MATERIALS OTHER CONSUMBLES AND T&P (INCLUDES LIFTING OF GTU UPTO 6.5 MT) | 60 | Per Sq. Mtr of Joint area | 9,960 ₹5,97,600 | 10,258 ₹6,15,480 | 10,556 ₹6,33,360 | 10,780 ₹6,46,800 | 10,040 ₹6,02,400 | 10,400 ₹6,24,000 | 9,340 ₹5,60,400 Lowest |
| 2.00 | JOINING OF TEXTILE CONVEYOR BELTS OF ALL WIDTHS BY HOT VULCANISING METHOD INCLUDING
COST OF VULCANISING MATERIALS OTHER CONSUMBLES AND T&P (INCLUDES LIFTING OF GTU UPTO 6.5MT) | 80 | Per Sq. Mtr of Joint area | 25,000 ₹20,00,000 | 26,750 ₹21,40,000 | 26,390 ₹21,11,200 | 26,950 ₹21,56,000 | 25,750 ₹20,60,000 | 26,000 ₹20,80,000 | 20,000 ₹16,00,000 Lowest |
| 3.00 | JOINING OF STEEL CORD CONVEYOR BELT OF 1800mm WIDTH BY HOT VULCANISING METHOD
INCLUDING COST OF STEEL CORDS SPLICING MATERIALS,OTHER T&P AND CONSUMBLES. | 20 | Per Joint | 1,22,950 ₹24,59,000 | 1,26,638 ₹25,32,760 | 1,30,935 ₹26,18,700 | 1,33,700 ₹26,74,000 | 1,23,893 ₹24,77,860 | 1,29,000 ₹25,80,000 | 1,15,250 ₹23,05,000 Lowest |
| 4.00 | MAJOR BELT REPAIR BY PATCH VULCANISING WITH COLD PROCESS INCLUDING VULCANISING MATERIALS, T&P AND CONSUMBLES. | 800 | Per Sq.Mtr | 5,600 ₹44,80,000 | 9,000 ₹72,00,000 | 10,150 ₹81,20,000 | 10,365 ₹82,92,000 | 5,800 ₹46,40,000 | 10,000 ₹80,00,000 | 4,500 ₹36,00,000 Lowest |
| 5.00 | MINOR BELT REPAIR BY PATCH VULCANISING WITH COLD PROCESS INCLUDING VULCANISING
MATERIALS, T&P AND CONSUMBLES. | 300 | Per Patch | 2,175 ₹6,52,500 | 2,245 ₹6,73,500 | 2,314 ₹6,94,200 | 2,362 ₹7,08,600 | 2,190 ₹6,57,000 | 2,280 ₹6,84,000 | 2,037 ₹6,11,100 Lowest |
| 6.00 | GTU COUNTER WEIGHT (>6.5 MT) LIFTING WITH CHAIN PULLEY BLOCKS FOR BELT VULCANISING/ ANY OTHER PURPOSE AS PER INSTRUCTIONS OF EIC | 60 | Equivalent Opn | 12,259 ₹7,35,540 | 12,625 ₹7,57,500 | 12,992 ₹7,79,520 | 13,265 ₹7,95,900 | 12,308 ₹7,38,480 | 12,800 ₹7,68,000 | 11,450 ₹6,87,000 Lowest |
| 7.00 | CONVEYOR BELT REPLACEMENT IN CONVEYORS WITH NTECL’S MACHINE FOR PULLING | 4,000 | Equivalent Mtr | 630 ₹25,20,000 | 670 ₹26,80,000 | 696 ₹27,84,000 | 710 ₹28,40,000 | 675 ₹27,00,000 | 685 ₹27,40,000 | 550 ₹22,00,000 Lowest |
| 8.00 | BELT PULLING INCASE OF BELT SNAPPING/ ANY OTHER REASONS AS PER EIC UPTO 50 METER LENGTH | 20 | Equivalent Mtr | 19,490 ₹3,89,800 | 20,075 ₹4,01,500 | 20,706 ₹4,14,120 | 21,143 ₹4,22,860 | 19,645 ₹3,92,900 | 20,400 ₹4,08,000 | 18,275 ₹3,65,500 Lowest |
| 9.00 | FULL BELT INSPECTION & MAPPING OF JOINTS AND LAGGING CONDITION AS PER THE FORMAT | 240 | Per Conveyor | 2,450 ₹5,88,000 Lowest | 2,530 ₹6,07,200 | 3,045 ₹7,30,800 | 3,108 ₹7,45,920 | 2,687 ₹6,44,880 | 3,000 ₹7,20,000 | 2,500 ₹6,00,000 |
| 10.00 | LAGGING OF CONVEYOR PULLEYS WITH 12 MM LAGGING SHEET BY COLD VULCANISING METHOD
INCLUDING COST OF LAGGING SHEET, VULCANISING MATERIALS WITH AGENCY T&P AND CONSUMBLES. | 120 | Equivalent Sq.Mtr | 17,460 ₹20,95,200 | 17,990 ₹21,58,800 | 18,600 ₹22,32,000 | 18,991 ₹22,78,920 | 17,589 ₹21,10,680 | 18,350 ₹22,02,000 | 16,362 ₹19,63,440 Lowest |
Tender Value
Refer Docs
EMD Value
₹2 L
Closing Date
17 Aug 2022, 2:30 pmClosed
SR MANAGER
NTECL, VALLUR THERMAL POWER PROJECT, VELLIVOYAL CHAVADI POST, PONNERI TALUK,THIRUVALLUR DISTT,CHENNAI,TAMILNADU
BMC for Conveyor Belt Vulcanizing and Pulley Lagging works
2022_NTECL_124699_1
CS-5163
Limited
AMC/ Maintenance Contracts
Item Rate
730 days
NTECL CHP AREA
3 documents required · 3 mandatory
₹0
₹2 L
Yes
1 Sept 2022
3 Aug 2022
18 Aug 2022
3 Aug 2022
17 Aug 2022
12 Aug 2022
4 Aug 2022 - 11 Aug 2022
Amount
JOINING OF TEXTILE CONVEYOR BELTS OF ALL WIDTHS BY COLD VULCANISING METHOD INCLUDING COST OF VULCANISING MATERIALS OTHER CONSUMBLES AND T&P (INCLUDES LIFTING OF GTU UPTO 6.5 MT)
JOINING OF TEXTILE CONVEYOR BELTS OF ALL WIDTHS BY HOT VULCANISING METHOD INCLUDING COST OF VULCANISING MATERIALS OTHER CONSUMBLES AND T&P (INCLUDES LIFTING OF GTU UPTO 6.5MT)
JOINING OF STEEL CORD CONVEYOR BELT OF 1800mm WIDTH BY HOT VULCANISING METHOD INCLUDING COST OF STEEL CORDS SPLICING MATERIALS,OTHER T&P AND CONSUMBLES.
MAJOR BELT REPAIR BY PATCH VULCANISING WITH COLD PROCESS INCLUDING VULCANISING MATERIALS, T&P AND CONSUMBLES.
MINOR BELT REPAIR BY PATCH VULCANISING WITH COLD PROCESS INCLUDING VULCANISING MATERIALS, T&P AND CONSUMBLES.
GTU COUNTER WEIGHT (>6.5 MT) LIFTING WITH CHAIN PULLEY BLOCKS FOR BELT VULCANISING/ ANY OTHER PURPOSE AS PER INSTRUCTIONS OF EIC
CONVEYOR BELT REPLACEMENT IN CONVEYORS WITH NTECL’S MACHINE FOR PULLING
BELT PULLING INCASE OF BELT SNAPPING/ ANY OTHER REASONS AS PER EIC UPTO 50 METER LENGTH
FULL BELT INSPECTION & MAPPING OF JOINTS AND LAGGING CONDITION AS PER THE FORMAT
LAGGING OF CONVEYOR PULLEYS WITH 12 MM LAGGING SHEET BY COLD VULCANISING METHOD INCLUDING COST OF LAGGING SHEET, VULCANISING MATERIALS WITH AGENCY T&P AND CONSUMBLES.
LAGGING OF CONVEYOR PULLEYS BY COLD VULCANISING METHOD INCLUDING VULCANISING MATERIALS WITH AGENCY T&P AND CONSUMBLES BUT EXCLUDING COST OF LAGGING
DEPLOYMENT OF GANG WITH T&P FOR EXIGENCIES DURING BELT FOLD REMOVAL/ANY EMERGENCIES ETC
SUPPLY OF VULCANISING MACHINE FOR HOT JOINT WORKS
IDLE CHARGES FOR SUPPLY OF VULCANIZING MACHINE
UNITEC RUBBER AND CONVEYOR SYSTEMS PRIVATE LIMITED
viswa engineering
CHANDA AND COMPANY ENGG PRIVATE LTD
Waidhan Engineering And Industries Pvt Ltd
Gill Engineering Pvt. Ltd.
Sivasakthi Power Services Pvt Ltd
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .