Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.4 CrAdmitted-Finance | ₹2.4 Cr | L1 | Admitted-Finance |
| 2 | L2₹2.5 Cr+₹6.3 L (2.60%)Admitted-Finance 18 19 MEZZANINE FLOOR ABOBE MAHESH AYURVEDIC UB CHOWK ST ROAD OPP WASAN MOTORS CHEMBUR CHEMBUR E | ₹2.5 Cr+₹6.3 L (2.60%) | L2 | Admitted-Finance |
| 3 | L3₹2.6 Cr+₹22.1 L (9.17%)Admitted-Finance | ₹2.6 Cr+₹22.1 L (9.17%) | L3 | Admitted-Finance |
| 4 | L4₹2.8 Cr+₹34.4 L (14.3%)Admitted-Finance 806 8TH FLOOR MULUND WEST NEPTUNE UPTOWN N S ROAD VILLAGE TOWN MULUND CITY MUMBAI MUMBAI MAHARASHTRA 400080 INDIA | MUMBAI SUBURBAN | MAHARASHTRA | 400080 | ₹2.8 Cr+₹34.4 L (14.3%) | L4 | Admitted-Finance |
| 5 | L5₹2.8 Cr+₹36.2 L (15.0%)Admitted-Finance | ₹2.8 Cr+₹36.2 L (15.0%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | FAST TRACK INDUSTRIES L2 | TRACK INNOVATION INDIA PVT LTD L5 | DAYAL WOOD WORKS L3 | Encee Rail Engineers and Fabricators Pvt. Ltd. L4 | NATIONAL CONSTRUCTION AND TRADING COMPANY L6 | raghavendra rail lines pvt ltd L1 | KVC INFRASTRUCTURES L7 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00Electrical Items : | ||||||||||
| 1.01 | Pre stressed concrete Sleepers 1 in 8 ½ turn out confirming to RDSO Drg. No. T-4865 complete one set with PSC Sleepers confirming to DRG. No. T-45/13 suitable for manually operating point including approach sleepers (set contains 67 sleepers as per list enclosed ) | 53 | SETS | 2,09,34,947 ₹2,47,03,237.46 | 1,45,75,000 ₹2,76,98,500 | 2,22,75,900 ₹2,62,85,562 | 2,33,20,000 ₹2,75,17,600 | 2,49,04,700 ₹2,93,87,546 | 2,04,05,000 ₹2,40,77,900 Lowest | 3,40,59,125 ₹3,53,86,240 |
Tender Value
₹2.6 Cr
Closing Date
26 Jan 2022, 3:00 pmClosed
MATERIALS MANAGER
MATERIALS MANAGER, AOB BUILDING 4TH FLOOR, VISAKHAKPATNAM PORT TRUST
SUPPLY OF PSC SLEEPERS 1 IN 8 1/2 TURN OUT
2021_VPT_99373_1
IMEE/MMD/GRII/LSR 445/202021
Open Tender
Miscellaneous Goods
Supply
120 days
VPT GENERAL STORES
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
Exempted
30 May 2022
23 Dec 2021
27 Jan 2022
23 Dec 2021
26 Jan 2022
23 Dec 2021
Electrical Items :
Pre stressed concrete Sleepers 1 in 8 ½ turn out confirming to RDSO Drg. No. T-4865 complete one set with PSC Sleepers confirming to DRG. No. T-45/13 suitable for manually operating point including approach sleepers (set contains 67 sleepers as per list enclosed )
FAST TRACK INDUSTRIES
DAYAL WOOD WORKS
Encee Rail Engineers and Fabricators Pvt. Ltd.
TRACK INNOVATION INDIA PVT LTD
NATIONAL CONSTRUCTION AND TRADING COMPANY
KVC INFRASTRUCTURES
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.31 MB
BOQ_108208.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .