Tender Value
Refer Docs
EMD Value
₹2.3 L
Closing Date
5 Nov 2026, 5:00 pm
Chief Engineer
Office of Chief Engineer (OandM), PTCUL, Haldwani
Const of internal approach path, drains for providing all-weather vehicular, pedestrian connectivity to the control room building and associated electrical infrastructure at 132KV S/s, Almora, including provisions for safe movement of OandM personnel
2026_PTCU9_101016_1
CE/OandM/PTCUL/HLD/65/2026-27
Open Tender
Civil Works - Others
Item Rate
132KV S/s, Almora
Please refer Tender documents.
5 documents required · 5 mandatory
₹11,800
EE, OandM Division, PTCUL, Haldwani
₹2.3 L
Office of Chief Engineer (OandM), PTCUL, Haldwani
7 Oct 2026
7 Oct 2026
6 Nov 2026
7 Oct 2026
5 Nov 2026
7 Oct 2026
21 Oct 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. | 123 | Cumt. | - | - |
| 2 | Clearing grass and removal of the rubbish up to a distance of 50m outside the periphery of the area cleared. | 2,879.4 | Sqm. | - | - |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 Cement : 2coarse sand (Zone-III) : 4graded stone aggregate 20 mm nominal size) | 49.5 | Cumt. | - | - |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (Zone-III) : 8 graded stone aggregate 40 mm nominal size) | 380 | Cumt. | - | - |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form for : Foundations, footings, bases of columns, etc. for mass concrete. | 440 | Sqm. | - | - |
| 6 | Steel reinforcement for R.C.C. work including straightening, cutting,bending, placing in position and binding all complete upto plinth level.Cold twisted bars | 6,663.73 | Kg. | - | - |
| 7 | Random rubble masonry with hard stone in superstructure above plinth level and upto floor five level, including leveling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) at window sills, ceiling level and the like. Cement mortar 1:6 (1 cement : 6 coarse sand) | 59.94 | Cumt. | - | - |
| 8 | Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets,gates and similar works | 2,661.75 | Kg. | - | - |
| 9 | Preparation and consolidation of sub grade with power road roller of 8 to 12 tonne capacity after excavating earth to an average of 22.5 cm depth, dressing to camber and consolidating with road roller including making good the undulations etc. and re-rolling the sub grade and disposal of surplus earth with lead upto 50 metres. | 336 | Sqm. | - | - |
| 10 | Supplying and stacking at site. 63 mm to 45 mm size stone aggregate | 67.2 | Cumt. | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.50 MB
TenderDocument65.pdf
Tender Documents • 1.23 MB
PQRSheet65.xls
Other Document • 0.14 MB
TechnicalSpecification65.pdf
Additional Documents • 0.49 MB
BOQ_119051.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .