Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹45.4 LAdmitted-Finance | -1.68% | ₹45.4 L | L1 | Admitted-Finance |
| 2 | L2₹47.6 L+₹2.2 L (4.76%)Admitted-Finance | +3.00% | ₹47.6 L+₹2.2 L (4.76%) | L2 | Admitted-Finance |
| 3 | Not Admitted-Fee/PreQual/Technical 15 281 CHHILI INT ROAD GHATIYA AZAM KHAN AGRA UTTAR PRADESH 282003 | AGRA | UTTAR PRADESH | 282003 | - | - | - | Not Admitted-Fee/PreQual/Technical No EMD or Fee received |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | - | Not Admitted-Fee/PreQual/Technical No EMD or Fee received |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | - | Not Admitted-Fee/PreQual/Technical No EMD or Fee received |
Tender Value
₹46.2 L
EMD Value
₹92,380
Closing Date
9 Aug 2026, 6:00 pmClosed
Executive Officer
Municipal Board Balesar Satta
Construction Of Tubewell, Guard Room, Railing And Interlocking Work At Public Park Balesar Satta.
2026_DLB_580368_1
ENIT511/04
Open Tender
Civil Works
Percentage
Municipal Board Balesar Satta
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
E.O.Balesar Satta/MDRISL
₹92,380
Yes
12 Aug 2026
31 Jul 2026
10 Aug 2026
31 Jul 2026
9 Aug 2026
31 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation in foundation, trenches etc. including dressing of sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of Engineer for following depths, below natural ground / Road top level.In all types soils/ saturated soil such as moorum, sand, sandy silt, clay, black cotton soil, kankar, etc.Depth upto 1.5 m | - | cum | 229.5 | - |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level :1:4:8 (1 Cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size). | 1 | cum | 4,575 | ₹4,570.43 |
| 3 | Random rubble masonry with hard stone in foundation and plinth : Cement mortar 1:6 (1 cement : 6 coarse sand) | 1 | cum | 4,860 | ₹4,855.14 |
| 4 | Filling with locally available river sand at all levels including watering ramming consolidating and dressing complete including cost of sand. | - | cum | 1,013 | - |
| 5 | Stone work in plain ashlar in super structure upto floor five level in cement mortar 1:6 (1 cement : 6 coarse sand) including pointing with cement mortar 1:2 (1 white cement : 2 stone dust) with an admixture of pigment matching the stone shade :One face dressed.Red sand stone | - | cum | 40,300 | - |
| 6 | Random rubble masonry with hard stone in foundation and plinth : Cement mortar 1:6 (1 cement : 6 coarse sand) Extra for random rubble masonry with hard stone in superstructure above plinth level and upto two stories | 1 | cum | 5,830 | ₹5,824.17 |
| 7 | Cement plastering including T&P, scaffolding, material and complete labpour, including cost of water, curing, racking of joints etc. with 20 mm cement plaster of mix : 1:6 (1 cement : 6 fine/ coarse sand) | - | sqm | 294.5 | - |
| 8 | Providing and fixing Granite stone slab mirror polished and machineedge cut in walls, pillars, steps, Shelves, Sills Counters, Floors etc.laid on 12mm (Av.) thick base of cement mortar 1:3 (1 cement : 3 coarse sand) jointing with white cement mortar 1:2 (1white cement : 2 marble dust) with pigment to match the shade of the marble slab including grinding, rubbing and polishing complete.Jhunjhunu / Jalore (Red / Chocolate Colour)Upto to 1500 Cm2 Tiles | - | sqm | 3,025 | - |
| 9 | Providing and fixing horizontal chajja of stone 40 mm thick and upto 80 cm projection in cement mortar 1:4 (1 cement : 4 coarse sand) including pointing in white cement mortar 1:2 (1 white cement : 2 stone dust) with an admixture of pigment matching the stone shade:Red sand stone | - | sqm | 1,452 | - |
| 10 | Steel work welded in built up sections/ framed work including cutting,
hoisting, fixing in position and applying a priming coat of approved
steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and
similar works. | - | Kg | 144.5 | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.26 MB
BOQ_1031231.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .