Loading…
Loading…
| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹6.6 Laccepted-aoc | accepted-aoc |
Tender Value
₹7.8 L
EMD Value
₹19,500
Closing Date
25 Sept 2026, 3:00 pmClosed
Chief Engineer, TTD, Tirupati
D.E(Elec)-II, Room No.128, TTD Admn. Bldg., Tirupati
Providing Split AC units to the Sri KRT office at old SV High School, Dairy Science Lab at SV Arts College, SV Junior College Office, DyEE (West) office, R&B Control room in Mahathi Auditorium, SV Poor Home & SV Temple, Kanyakumari office pertaining to ESD - III sub-division, Tirupati
987047
409/DE(Elec)-II/TTD/TPT/2026-27
OPEN - NCB
Electrical Works
CHITTOOR, ANDHRA PRADESH
6 documents required · 6 mandatory
₹276
₹19,500
9 Oct 2026
10 Sept 2026
10 Sept 2026
Supply of 1.5 TR, 4 Star lnverter Model Cool Type split AC unit with high wall mounted single split indoor unit and outdoor condensing unit Hermetically sealed compressor suitable for operation on 230V, 50H2, single phase AC supply capable of performing with cooling and condensing units with 3 Mtrs.of copper piping, insulation kit and 4 Mtrs. of 1.5 12.5 Sq.mm 3 / 4 core copper flexible chord with cordless remote control etc., dual barrier coating in order to protect coil from oxidization. Make: Mitsubishi, / Toshiba /'O'General
Techinical Specifications:Type of AC Unit type Split type inverter,Tonnage Capacity(TR):1.50,cooling capacity(KW):5.2 rated(Min Max):1.5-6.0, Power Consumpation:1.43,power Supply:230V AC,50Hz, star rating:>4 star,ISEER:>4.58,Air Flow(CFM):303-650,Indoor Noise Level(dB(A)):28-49, Refrigerant piping size (Copper) Gas/Liquid(mm/inch):6.35(1/4) 12.7(1/2),type of condensor:Rotary/Swing/hyper tropical/Twin Rotary, Refrigerant: R 32, Warranty: Defect Liability Period (DLP):5 years (60 months) from the date installation as a whole, where in all the defects shall be rectified by the contractor at his cost with all materials, labour etc., complete.
Supply of 4.0 KVA Stabilizer. Makes: V-Guard
Supply, Fabrication of 1set MS bracket suitable for fixing outdoor unit of split AC unit.
Installation of Split Air conditioners
Providing 2 runs of 1/2" x 1/4" Copper tubes for suction and liquid between indoor and outdoor unit for split / Casseete Air-Conditioner including foaming etc.complete.
Supply and Fixing of ISI Mark 50mm outer dia medium grade (2.85mm thickness) with IS:9537 part -3 P.V.C. pipe with all accessories fixing on chromium plated metallic base saddles for surface wiring on Brick / stone walls, RCC roofings,Trusses, channels including all labour charges etc., complete. (If PVC Pipes are fixed on Trusses/Channels with MS Clamps, the rate for MS Clamps will be paid Separately) Makes : Sudhakar / Finolex / Polycab / Kumar / AKG / Indiantubes / GM / Anchor / Nandi / Poly line / Goldmedal
Note: 1) The above rates are basic rates (Excluding GST). The tender rates are including defect liability period for 5 years from the date of completion of installation. 2) The applicable GST will be reimbursed/paid as per actuals on production of proof. 3) Defect liability period shall be taken as sixty (60) months from the date of completion of work as a whole, where in all the defects shall be rectified by the contractor at his cost with all materilas, labour etc. complete.
4) All the works executed shall be maintained during DLP of (60 months) i) Minor defects like replacement of valves, rectification of panel, refrigerant refilling, replacement of belts, relays etc. shall be rectified within 4 hours, failure to rectify the minor defects within the specified time, a penalty of Rs.500/- for every one hour or part there of will be imposed. ii) Major defect like motor rewinding, motor replacements, replacements of compressor, pump, blower fans, chillers etc., shall be rectified not later than week days, failure to rectify the major defects with in specified time, a penalty of Rs.500/- for every one day or part there of beyond 7 days will be imposed. iii) Entire works shall be guaranteed for 5 years from the date of satisfactory completion of work during defect laibility (DLP), it is responsibility of the contractor to repair / replace any item / spare / consumables etc., at their cost including labour charges, incidental charges, cranes charges etc., incurred there on.
5) Periodical assessment or completed work status during defect laibility period shall be furnished by field staff on any interval, but not exceeding 4 months to the concerned Divisional Engineer (Elec.-II). 6) The defect liability is applicable for air conditioners, stabilizers and other accessories including gas charging for a period of 5 years. 7) During the defect liability period, servicing to be done to the all air conditioners including cleaning of filters. 8) Water servicing to the Air conditioners by spray with bag system to be done once in 3 months.
(Rupees Seven Lakh Seventy Nine Thousand Two Hundred Twenty Seven and Paise Five Only)
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
NIT NO 409.docx
TENDER_DOCUMENT • 0.16 MB
Schedule 409.xlsx
TENDER_DOCUMENT • 0.02 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .