Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹27.8 LAccepted-AOC | ₹27.8 L | L1 | Accepted-AOC AOC |
| 2 | L2₹32.2 L+₹4.4 L (15.8%)Rejected-Finance | ₹32.2 L+₹4.4 L (15.8%) | L2 | Rejected-Finance Not lowest bidder |
| 3 | L3₹33.3 L+₹5.6 L (20.0%)Rejected-Finance | ₹33.3 L+₹5.6 L (20.0%) | L3 | Rejected-Finance Not lowest bidder |
| 4 | L4₹35.9 L+₹8.1 L (29.1%)Rejected-Finance | ₹35.9 L+₹8.1 L (29.1%) | L4 | Rejected-Finance Not lowest bidder |
| 5 | L5₹37.3 L+₹9.5 L (34.2%)Rejected-Finance 33 MAHAVEER NAGAR NANDRI ROAD PO SARAN NAGAR JODHPUR 342015 | JODHPUR | JODHPUR | RAJASTHAN | 342015 | ₹37.3 L+₹9.5 L (34.2%) | L5 | Rejected-Finance Not lowest bidder |
| Sl No | Description | Qty | Unit | M.A. MUNSHI AND CO. L3 | DIWAKAR CONSTRUCTION CO. L5 | AJEET ENTERPRISES L1 | M/s Vishaka Enterprises L2 | Bhawani Enterprises L4 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | M&L for Preparation of old decorated surfaces of walls (plastered or unplastered) including cornices, pillasters etc by brooming down or wire brushing removing dust, dirt etc scrapping smoke, soot, moulds, moss and efflorecent salts, removing oil and greasy spots and applying one coat of white wash on wall with brush leaving permises clean etc complete all as specified. | 4,000 | Sqm | 15 ₹60,000 | 12 ₹48,000 | 9 ₹36,000 Lowest | 11 ₹44,000 | 15 ₹60,000 |
| 2.00 | M&L for Preparation of old decorated surfaces of ceiling (plastered or unplastered) including cornices, pillasters etc by brooming down or wire brushing removing dust, dirt etc scrapping smoke, soot, moulds, moss and efflorecent salts, removing oil and greasy spots and applying one coat of white wash on ceiling with brush leaving permises clean etc complete all as specified. | 3,600 | Sqm | 15.25 ₹54,900 | 14 ₹50,400 | 11 ₹39,600 Lowest | 13 ₹46,800 | 15 ₹54,000 |
| 3.00 | M&L for Preparation of old decorated surfaces of walls (plastered or unplastered) including cornices, pillasters etc by brooming down or wire brushing removing dust, dirt etc scrapping smoke, soot, moulds, moss and efflorecent salts, removing oil and greasy spots and applying one coat of distemper oil emulsion (white or tint as directed) on walls with brush leaving permises clean etc complete all as specified.
Note : (i) Quantity of material shall be calculated based on constants given in Joglekar book and requisite quantity will be deposited by contractor immediately after approval of sample for safe custody in terms of Note on CA.
(ii) The colour shall be machine mixed of approved shade prior to start the work at site, no mixing of colour shall be allowed at site. | 18,000 | Sqm | 35 ₹6,30,000 | 36 ₹6,48,000 | 25 ₹4,50,000 Lowest | 30 ₹5,40,000 | 42.5 ₹7,65,000 |
| 4.00 | M&L for Preparation of old decorated surfaces of Ceiling (plastered or unplastered) including cornices, pillasters etc by brooming down or wire brushing removing dust, dirt etc scrapping smoke, soot, moulds, moss and efflorecent salts, removing oil and greasy spots and applying one coat of distemper oil emulsion (white or tint as directed) on walls with brush leaving permises clean etc complete all as specified.
Note : (i) Quantity of material shall be calculated based on constants given in Joglekar book and requisite quantity will be deposited by contractor immediately after approval of sample for safe custody in terms of Note on CA.
(ii) The colour shall be machine mixed of approved shade prior to start the work at site, no mixing of colour shall be allowed at site. | 5,000 | Sqm | 35.25 ₹1,76,250 | 36 ₹1,80,000 | 26 ₹1,30,000 Lowest | 33 ₹1,65,000 | 42.5 ₹2,12,500 |
| 5.00 | M&L for Preparation of old painted surfaces of (wall/ceiling) any description wood, steel, iron , concrete, brick, stone etc. (Plastered or unplastered) including cornices, pillasters etc by brooming down or wire brushing removing dust, dirt etc scrapping smoke, soot, moulds, moss and efflorecent salts, removing oil and greasy spots and applying one coat of fire resisting paint surface with brush/roller complete all as specified.
Note : (i) Quantity of material shall be calculated based on constants given in Joglekar book and requisite quantity will be deposited by contractor immediately after approval of sample for safe custody in terms of Note on CA.
(ii) The colour shall be machine mixed of approved shade prior to start the work at site, no mixing of colour shall be allowed at site. | 2,500 | Sqm | 99 ₹2,47,500 | 140 ₹3,50,000 | 92 ₹2,30,000 | 90 ₹2,25,000 | 80 ₹2,00,000 Lowest |
| 6.00 | M&L for Preparation of old decorated surfaces of walls including chajja, facia, roof projection on roof and and wall etc (plastered or unplastered) including cornices, pillasters etc removing dust, dirt etc scrapping smoke, soot, moulds, moss and efflorecent salts, removing oil and greasy spots and applying one coat of cement base paint on external wall surface camouflaging pattern including 2 kg of fevicol per 30 kg of cement base paint should be mixed by using brush upto the 10 Mtr height complete all as specified.
Note : (i) Quantity of material shall be calculated based on constants given in Joglekar book and requisite quantity will be deposited by contractor immediately after approval of sample for safe custody in terms of Note on CA.
(ii) The colour shall be machine mixed of approved shade prior to start the work at site, no mixing of colour shall be allowed at site. | 46,000 | Sqm | 33 ₹15,18,000 | 38 ₹17,48,000 | 28 ₹12,88,000 Lowest | 33.9 ₹15,59,400 | 40 ₹18,40,000 |
| 7.00 | M&L for Preparation of old decorated surfaces of walls (plastered or unplastered) including cornices, pillasters etc by brooming down or wire brushing removing dust, dirt etc scrapping smoke, soot, moulds, moss and efflorecent salts, removing oil and greasy spots and finishing walls with Acrylic Smooth exterior paint in camouglaging pattern of required shade : old work (one coat applied @ 1.00 ltr/5-6 sqm approx complete all as specified.
Note : (i) Quantity of material shall be calculated based on constants given in Joglekar book and requisite quantity will be deposited by contractor immediately after approval of sample for safe custody in terms of Note on CA.
(ii) The colour shall be machine mixed of approved shade prior to start the work at site, no mixing of colour shall be allowed at site. | 1,700 | Sqm | 60 ₹1,02,000 | 150 ₹2,55,000 | 92 ₹1,56,400 | 90 ₹1,53,000 | 50 ₹85,000 Lowest |
| 8.00 | Preparation of old painted steel surfaces of any description not otherwise described over 10cm width or girth and applying one coat of synthetic enamel paint of ordinary tint etc complete all as specified. | 500 | Sqm | 50 ₹25,000 | 55 ₹27,500 | 47 ₹23,500 | 59 ₹29,500 | 45 ₹22,500 Lowest |
| 9.00 | Taking down cement plaster on walls of any description including racking out joints, hacking for key scrubbing down with water etc upto the height 10 Mtr complete all as specified. | 1,500 | Sqm | 49 ₹73,500 | 40 ₹60,000 | 50 ₹75,000 | 39 ₹58,500 | 30 ₹45,000 Lowest |
| 10.00 | M&L for rendering 15mm thick on other than fair faces of stone/brick surface of wall in CM 1:6 and finished even and smooth (without using extra cement) upto the height 10 Mtr complete all as specified. | 300 | Sqm | 390 ₹1,17,000 | 300 ₹90,000 | 310 ₹93,000 | 305 ₹91,500 | 250 ₹75,000 Lowest |
Tender Value
₹40 L
EMD Value
₹80,000
Closing Date
1 Jul 2026, 6:00 pmClosed
Garrison Engineer, Banar
Garrison Engineer Banar, Jodhpur-342027
PERIODICAL SERVICES TO CERTAIN OTM AND SHEDS INSIDE DEPOT AREA AT A A BANAR UDNER GE BANAR
2026_MES_771723_1
8826/32/E8
Open Tender
Civil Works
Item Rate
180 days
BANAR
As per nit and tender documents
8 documents required · 8 mandatory
₹500
Garrison Engineer Banar
₹80,000
Yes
3 Sept 2026
12 Jun 2026
3 Jul 2026
12 Jun 2026
1 Jul 2026
26 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | M&L for Preparation of old decorated surfaces of walls (plastered or unplastered) including cornices, pillasters etc by brooming down or wire brushing removing dust, dirt etc scrapping smoke, soot, moulds, moss and efflorecent salts, removing oil and greasy spots and applying one coat of white wash on wall with brush leaving permises clean etc complete all as specified. | 4,000 | Sqm | - | - |
| 2 | M&L for Preparation of old decorated surfaces of ceiling (plastered or unplastered) including cornices, pillasters etc by brooming down or wire brushing removing dust, dirt etc scrapping smoke, soot, moulds, moss and efflorecent salts, removing oil and greasy spots and applying one coat of white wash on ceiling with brush leaving permises clean etc complete all as specified. | 3,600 | Sqm | - | - |
| 3 | M&L for Preparation of old decorated surfaces of walls (plastered or unplastered) including cornices, pillasters etc by brooming down or wire brushing removing dust, dirt etc scrapping smoke, soot, moulds, moss and efflorecent salts, removing oil and greasy spots and applying one coat of distemper oil emulsion (white or tint as directed) on walls with brush leaving permises clean etc complete all as specified.
Note : (i) Quantity of material shall be calculated based on constants given in Joglekar book and requisite quantity will be deposited by contractor immediately after approval of sample for safe custody in terms of Note on CA.
(ii) The colour shall be machine mixed of approved shade prior to start the work at site, no mixing of colour shall be allowed at site. | 18,000 | Sqm | - | - |
| 4 | M&L for Preparation of old decorated surfaces of Ceiling (plastered or unplastered) including cornices, pillasters etc by brooming down or wire brushing removing dust, dirt etc scrapping smoke, soot, moulds, moss and efflorecent salts, removing oil and greasy spots and applying one coat of distemper oil emulsion (white or tint as directed) on walls with brush leaving permises clean etc complete all as specified.
Note : (i) Quantity of material shall be calculated based on constants given in Joglekar book and requisite quantity will be deposited by contractor immediately after approval of sample for safe custody in terms of Note on CA.
(ii) The colour shall be machine mixed of approved shade prior to start the work at site, no mixing of colour shall be allowed at site. | 5,000 | Sqm | - | - |
| 5 | M&L for Preparation of old painted surfaces of (wall/ceiling) any description wood, steel, iron , concrete, brick, stone etc. (Plastered or unplastered) including cornices, pillasters etc by brooming down or wire brushing removing dust, dirt etc scrapping smoke, soot, moulds, moss and efflorecent salts, removing oil and greasy spots and applying one coat of fire resisting paint surface with brush/roller complete all as specified.
Note : (i) Quantity of material shall be calculated based on constants given in Joglekar book and requisite quantity will be deposited by contractor immediately after approval of sample for safe custody in terms of Note on CA.
(ii) The colour shall be machine mixed of approved shade prior to start the work at site, no mixing of colour shall be allowed at site. | 2,500 | Sqm | - | - |
| 6 | M&L for Preparation of old decorated surfaces of walls including chajja, facia, roof projection on roof and and wall etc (plastered or unplastered) including cornices, pillasters etc removing dust, dirt etc scrapping smoke, soot, moulds, moss and efflorecent salts, removing oil and greasy spots and applying one coat of cement base paint on external wall surface camouflaging pattern including 2 kg of fevicol per 30 kg of cement base paint should be mixed by using brush upto the 10 Mtr height complete all as specified.
Note : (i) Quantity of material shall be calculated based on constants given in Joglekar book and requisite quantity will be deposited by contractor immediately after approval of sample for safe custody in terms of Note on CA.
(ii) The colour shall be machine mixed of approved shade prior to start the work at site, no mixing of colour shall be allowed at site. | 46,000 | Sqm | - | - |
| 7 | M&L for Preparation of old decorated surfaces of walls (plastered or unplastered) including cornices, pillasters etc by brooming down or wire brushing removing dust, dirt etc scrapping smoke, soot, moulds, moss and efflorecent salts, removing oil and greasy spots and finishing walls with Acrylic Smooth exterior paint in camouglaging pattern of required shade : old work (one coat applied @ 1.00 ltr/5-6 sqm approx complete all as specified.
Note : (i) Quantity of material shall be calculated based on constants given in Joglekar book and requisite quantity will be deposited by contractor immediately after approval of sample for safe custody in terms of Note on CA.
(ii) The colour shall be machine mixed of approved shade prior to start the work at site, no mixing of colour shall be allowed at site. | 1,700 | Sqm | - | - |
| 8 | Preparation of old painted steel surfaces of any description not otherwise described over 10cm width or girth and applying one coat of synthetic enamel paint of ordinary tint etc complete all as specified. | 500 | Sqm | - | - |
| 9 | Taking down cement plaster on walls of any description including racking out joints, hacking for key scrubbing down with water etc upto the height 10 Mtr complete all as specified. | 1,500 | Sqm | - | - |
| 10 | M&L for rendering 15mm thick on other than fair faces of stone/brick surface of wall in CM 1:6 and finished even and smooth (without using extra cement) upto the height 10 Mtr complete all as specified. | 300 | Sqm | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.32 MB
BOQ_864174.xls
BOQ • 11.85 MB
TenderPage.pdf
Tender Documents • 0.57 MB
TenderPage1.pdf
Tender Documents • 0.21 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .