Loading…
Loading…
Tender Value
₹81.3 L
EMD Value
₹81,300
Closing Date
5 Mar 2026, 6:00 pmClosed
Similar tender results from the same govt authority in the past 3 years.
The Chief Officer, Umreth Municipality, Umreth
BID DOCUMENTS FOR PROPOSED ASPHALT ROAD IN VARIOUS AREA (TOTAL WORK-4) OF UMRETH NAGARPALIKA UNDER: SWARNIM JAYANTI MUKHYA MANTRI SHAHERI VIKAS YOJANA- (YEAR: 2024-25).
280629
SJMMSVY/2024-25
Open
Civil Works - Roads
Anand
14 documents required · 14 mandatory
₹2,832
The Chief Officer, Umreth Municipality, Umreth
₹81,300
25 Feb 2026
25 Feb 2026
25 Feb 2026
5 Mar 2026
25 Feb 2026
Total Amount Rs.
Note : 4 In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt. G.R.: PRC-10/2017
Cement Consumption/16/C Date:11/05/2017 as stated in S.O.R. therefore in R.C.C. items where there is a change as
per actual mix design the cost of difference of cement consumption have been deducted from the rate of original item at
the rate of input rate mentioned in all the tender.
Signature of Contractor President Chief Officer
Umreth Nagarpalika Umreth Nagarpalika
SBD SECTION-7 BILL OF QUANTITIES-155
UMRETH MUNICIPALITY, UMRETH
NAME OF WORK :- ESTIMATE FOR CONSTRUCTION WORK OF ASPHALT ROAD
AT FRONT OF JAY AMBE SOCIETY AT UMRETH
Qty. Description Unit Amount
1 210.00 Preparing surface by Brushing with wire brushes for removing
Smt. caked mud etc. Air compressor / sweeping with brooms and
finally fanning the cleaned surface with gunney bags to remove
all loose dirt etc.(2) Black top/ CC surface.
2 31.50 Providing and Laying Bituminous Grout 75 mm thick compacted
M.T. with B.T. aggregates as M.O.R.T.&H. specification and asphalt
Grade: 60/70 (VG-30) for Tack Coat @ 2.50 Kg./10 Smt. with
Mechanical Sprayer and asphalt for Mixing @ 19.90 Kg./M.T.
i.e., 1.99% of totala weight mix including heating and mixing
asphalt and aggregate by continuous batching drum mix plant
and laying with paver finisher and consolidation with vibratory
roller, including cost of labour, material and plant, fuel, oil,
kerosene, labour charges etc. complete using contractor's
machinery drum mix plant and paver finisher etc. complete.
3 23.50 Providing and laying 50 mm thick Bituminous Macadam with
M.T. B.T. aggregate as per M.O.R.T. & H. specification and asphalt
Grade: V.G.-30 (60/70) for tack coat @ 2.50 KG. / 10 Sq.m. with
mechanical sprayer and asphalt Grade: V.G.-30 (60/70) for
mixing @ 34.00 KG. / M.T. i.e. 3.40 % of total weight of mix
including heating and mixing the aggregate and asphalt in Drum
mix plant and spreading the same by paver finisher and
consolidation with vibratory roller, including providing all
materials equipments, tools and plants, fire wood, oil, kerosene,
labour charges etc. complete using contractor's own machinery
Drum mix plant and paver finisher etc. complete.
4 12.50 Providing and laying 25 mm thick Semi Dense Bituminous
M.T. Concrete with B.T. aggregate as per M.O.R.T. & H. gradation,
asphalt Grade: VG-30 (60/70) for mixing @ 50.00 KG. / M.T. i.e.
5.0% by weight of total mix including heating and mixing the
aggregate and asphalt by continuous batching of drum mix plant
and spreading the same by paver finisher and consolidation with
vibratory roller, including providing all materials equipments,
tools and plants, oil, kerosene, firewood, labour charges etc.
SBD SECTION-7 BILL OF QUANTITIES-156
complete using contractor's own machineries drum mix plant
and paver finisher etc. complete.
5 210.00 Providing and laying Bituminous Painting on B.T. Surface with
Smt. bitumen VG-30 at the rate of 5.00 Kg./10.00 Smt. by Mechanical
Sprayer and spreading flushing sand or stone dust on painting
surface of the road at the rate of 0.03 Cmt./10 Smt. with
brooming and rolling with PTR Roller. Rates including all cost of
sand/stone dust, equipment T & P firewood, oil, kerosene,
labour charges etc. complete by using contractor's own
6 2.00 Renovation of manhole by increasing the height at top including
Nos. cost of excavation, refitting of C. I. manhole frame and cover
curing etc. complete incl. all carting and providing of materials
which is required for the purpose (except manhole frame and
cover) For all type manhole by providing RCC 1:2:4 Partition
walls with required reinforcement 25 cm thick and circular
opening with 500mm clear dia and 0.40 mt. av. ht.
Add :- 18% of GST, Rs.
Add :- 1% of Quality Controll, Rs.
Add :- 2% of Contingency Charges, Rs.
SBD SECTION-7 BILL OF QUANTITIES-157
UMRETH MUNICIPALITY, UMRETH
NAME OF WORK :- ESTIMATE FOR CONSTRUCTION WORK OF ASPHALT ROAD
UMRETH RAILWAY STATION TO JUBILEE GIRLS HIGH SCHOOL AT UMRETH
Qty. Description Unit Amount
1 2887.50 Preparing surface by Brushing with wire brushes for removing
Smt. caked mud etc. Air compressor / sweeping with brooms and
finally fanning the cleaned surface with gunney bags to remove
all loose dirt etc.(2) Black top/ CC surface.
2 433.50 Providing and Laying Bituminous Grout 75 mm thick compacted
M.T. with B.T. aggregates as M.O.R.T.&H. specification and asphalt
Grade: 60/70 (VG-30) for Tack Coat @ 2.50 Kg./10 Smt. with
Mechanical Sprayer and asphalt for Mixing @ 19.90 Kg./M.T.
i.e., 1.99% of totala weight mix including heating and mixing
asphalt and aggregate by continuous batching drum mix plant
and laying with paver finisher and consolidation with vibratory
roller, including cost of labour, material and plant, fuel, oil,
kerosene, labour charges etc. complete using contractor's
machinery drum mix plant and paver finisher etc. complete.
3 318.00 Providing and laying 50 mm thick Bituminous Macadam with
M.T. B.T. aggregate as per M.O.R.T. & H. specification and asphalt
Grade: V.G.-30 (60/70) for tack coat @ 2.50 KG. / 10 Sq.m. with
mechanical sprayer and asphalt Grade: V.G.-30 (60/70) for
mixing @ 34.00 KG. / M.T. i.e. 3.40 % of total weight of mix
including heating and mixing the aggregate and asphalt in Drum
mix plant and spreading the same by paver finisher and
consolidation with vibratory roller, including providing all
materials equipments, tools and plants, fire wood, oil, kerosene,
labour charges etc. complete using contractor's own machinery
Drum mix plant and paver finisher etc. complete. 2796.23 M.T.
4 166.50 Providing and laying 25 mm thick Semi Dense Bituminous
M.T. Concrete with B.T. aggregate as per M.O.R.T. & H. gradation,
asphalt Grade: VG-30 (60/70) for mixing @ 50.00 KG. / M.T. i.e.
5.0% by weight of total mix including heating and mixing the
aggregate and asphalt by continuous batching of drum mix plant
and spreading the same by paver finisher and consolidation with
vibratory roller, including providing all materials equipments,
tools and plants, oil, kerosene, firewood, labour charges etc.
complete using contractor's own machineries drum mix plant
SBD SECTION-7 BILL OF QUANTITIES-158
and paver finisher etc. complete.
5 2887.50 Providing and laying Bituminous Painting on B.T. Surface with
Smt. bitumen VG-30 at the rate of 5.00 Kg./10.00 Smt. by Mechanical
Sprayer and spreading flushing sand or stone dust on painting
surface of the road at the rate of 0.03 Cmt./10 Smt. with
brooming and rolling with PTR Roller. Rates including all cost of
sand/stone dust, equipment T & P firewood, oil, kerosene,
labour charges etc. complete by using contractor's own
machineries. 34.48 Smt.
6 13.00 Renovation of manhole by increasing the height at top including
Nos. cost of excavation, refitting of C. I. manhole frame and cover
curing etc. complete incl. all carting and providing of materials
which is required for the purpose (except manhole frame and
cover) For all type manhole by providing RCC 1:2:4 Partition
walls with required reinforcement 25 cm thick and circular
opening with 500mm clear dia and 0.40 mt. av. ht. 3880.10 No.
Add :- 18% of GST, Rs.
Add :- 1% of Quality Controll, Rs.
Add :- 2% of Contingency Charges, Rs.
SBD SECTION-7 BILL OF QUANTITIES-159
UMRETH MUNICIPALITY, UMRETH
NAME OF WORK :- ESTIMATE FOR CONSTRUCTION WORK OF ASPHALT ROAD
FROM GIRIRAJ DHAM TO OLD ITI AT UMRETH
Qty. Description Unit Amount
1 2730.00 Preparing surface by Brushing with wire brushes for removing
Smt. caked mud etc. Air compressor / sweeping with brooms and
finally fanning the cleaned surface with gunney bags to remove
all loose dirt etc.(2) Black top/ CC surface.
2 409.50 Providing and Laying Bituminous Grout 75 mm thick compacted
M.T. with B.T. aggregates as M.O.R.T.&H. specification and asphalt
Grade: 60/70 (VG-30) for Tack Coat @ 2.50 Kg./10 Smt. with
Mechanical Sprayer and asphalt for Mixing @ 19.90 Kg./M.T.
i.e., 1.99% of totala weight mix including heating and mixing
asphalt and aggregate by continuous batching drum mix plant
and laying with paver finisher and consolidation with vibratory
roller, including cost of labour, material and plant, fuel, oil,
kerosene, labour charges etc. complete using contractor's
machinery drum mix plant and paver finisher etc. complete.
3 300.50 Providing and laying 50 mm thick Bituminous Macadam with
M.T. B.T. aggregate as per M.O.R.T. & H. specification and asphalt
Grade: V.G.-30 (60/70) for tack coat @ 2.50 KG. / 10 Sq.m.
with mechanical sprayer and asphalt Grade: V.G.-30 (60/70) for
mixing @ 34.00 KG. / M.T. i.e. 3.40 % of total weight of mix
including heating and mixing the aggregate and asphalt in Drum
mix plant and spreading the same by paver finisher and
consolidation with vibratory roller, including providing all
materials equipments, tools and plants, fire wood, oil, kerosene,
labour charges etc. complete using contractor's own machinery
Drum mix plant and paver finisher etc. complete.
4 157.00 Providing and laying 25 mm thick Semi Dense Bituminous
M.T. Concrete with B.T. aggregate as per M.O.R.T. & H. gradation,
asphalt Grade: VG-30 (60/70) for mixing @ 50.00 KG. / M.T.
i.e. 5.0% by weight of total mix including heating and mixing the
aggregate and asphalt by continuous batching of drum mix
plant and spreading the same by paver finisher and
consolidation with vibratory roller, including providing all
materials equipments, tools and plants, oil, kerosene, firewood,
SBD SECTION-7 BILL OF QUANTITIES-160
labour charges etc. complete using contractor's own
machineries drum mix plant and paver finisher etc. complete.
5 2730.00 Providing and laying Bituminous Painting on B.T. Surface with
Smt. bitumen VG-30 at the rate of 5.00 Kg./10.00 Smt. by
Mechanical Sprayer and spreading flushing sand or stone dust
on painting surface of the road at the rate of 0.03 Cmt./10 Smt.
with brooming and rolling with PTR Roller. Rates including all
cost of sand/stone dust, equipment T & P firewood, oil,
kerosene, labour charges etc. complete by using contractor's
own machineries.
6 13.00 Renovation of manhole by increasing the height at top including
Nos. cost of excavation, refitting of C. I. manhole frame and cover
curing etc. complete incl. all carting and providing of materials
which is required for the purpose (except manhole frame and
cover) For all type manhole by providing RCC 1:2:4 Partition
walls with required reinforcement 25 cm thick and circular
opening with 500mm clear dia and 0.40 mt. av. ht.
Add :- 18% of GST, Rs.
Add :- 1% of Quality Controll, Rs.
Add :- 2% of Contingency Charges, Rs.
SBD SECTION-7 BILL OF QUANTITIES-161
UMRETH MUNICIPALITY, UMRETH
NAME OF WORK :- ESTIMATE FOR CONSTRUCTION WORK OF ASPHALT ROAD
FROM BABU PAN GALLA TO VATA DHARAMSHALA VIA MATA NI LIMDI TO RAVAL CHAKLA AT UMRETH
Qty. Description Unit Amount
1 2550.00 Preparing surface by Brushing with wire brushes for removing
Smt. caked mud etc. Air compressor / sweeping with brooms and
finally fanning the cleaned surface with gunney bags to remove
all loose dirt etc.(2) Black top/ CC surface. 17.03 Smt.
2 280.50 Providing and laying 50 mm thick Bituminous Macadam with B.T.
M.T. aggregate as per M.O.R.T. & H. specification and asphalt Grade:
V.G.-30 (60/70) for tack coat @ 2.50 KG. / 10 Sq.m. with
mechanical sprayer and asphalt Grade: V.G.-30 (60/70) for
mixing @ 34.00 KG. / M.T. i.e. 3.40 % of total weight of mix
including heating and mixing the aggregate and asphalt in Drum
mix plant and spreading the same by paver finisher and
consolidation with vibratory roller, including providing all
materials equipments, tools and plants, fire wood, oil, kerosene,
labour charges etc. complete using contractor's own machinery
Drum mix plant and paver finisher etc. complete.
3 147.00 Providing and laying 25 mm thick Semi Dense Bituminous
M.T. Concrete with B.T. aggregate as per M.O.R.T. & H. gradation,
asphalt Grade: VG-30 (60/70) for mixing @ 50.00 KG. / M.T. i.e.
5.0% by weight of total mix including heating and mixing the
aggregate and asphalt by continuous batching of drum mix plant
and spreading the same by paver finisher and consolidation with
vibratory roller, including providing all materials equipments,
tools and plants, oil, kerosene, firewood, labour charges etc.
complete using contractor's own machineries drum mix plant
and paver finisher etc. complete.
4 2550.00 Providing and laying Bituminous Painting on B.T. Surface with
Smt. bitumen VG-30 at the rate of 5.00 Kg./10.00 Smt. by Mechanical
Sprayer and spreading flushing sand or stone dust on painting
surface of the road at the rate of 0.03 Cmt./10 Smt. with
brooming and rolling with PTR Roller. Rates including all cost of
sand/stone dust, equipment T & P firewood, oil, kerosene, labour
charges etc. complete by using contractor's own machineries.
SBD SECTION-7 BILL OF QUANTITIES-162
5 15.00 Renovation of manhole by increasing the height at top including
Nos. cost of excavation, refitting of C. I. manhole frame and cover
curing etc. complete incl. all carting and providing of materials
which is required for the purpose (except manhole frame and
cover) For all type manhole by providing RCC 1:2:4 Partition
walls with required reinforcement 25 cm thick and circular
opening with 500mm clear dia and 0.40 mt. av. ht. 3880.10 No.
Add :- 18% of GST, Rs.
Add :- 1% of Quality Controll, Rs.
Add :- 2% of Contingency Charges, Rs.
SBD SECTION-7 BILL OF QUANTITIES-163
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
SBD.pdf
Notes.pdf
BOQ.pdf
OTHER IMPORTANT-1.pdf
OTHER IMPORTANT-2.pdf
OTHER IMPORTANT-3.pdf
Bid Evaluation Criteria.pdf
Download all tender documents and submit your bid