Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 3 | Not Admitted-Fee/PreQual/Technical 90 A 2ND FLOOR MAIN ROAD AMRIT PURI B REGD EAST OF KAILASH SOUTH DELHI 110065 | DELHI | SOUTH DELHI | DELHI | 110065 | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 4 | Not Admitted-Fee/PreQual/Technical 104 105 KINGSTONE TOWER OPP VIVA COLLEGE BYPASS ROAD VIRAR WEST MAHARASHTRA 401303 | PALGHAR | MAHARASHTRA | 401303 | Not Admitted-Fee/PreQual/Technical Others-MD RISL Fess |
Tender Value
₹22.0 L
EMD Value
₹44,060
Closing Date
19 Dec 2022, 6:00 pmClosed
Executive Officer
Office Municipal Fatehpur
Supply installation and Maintenance of Online Continuous Effluent Monitoring System OCEMS I e pH BOD COD TSS and Flow along with data transfer to CPCB and RSPCB server for running STP for Outlet
2022_DLB_309044_1
MBF//2022-23/7798
Open Tender
Miscellaneous Services
Item Rate
60 days
Fatehpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
Executive Officer, MD RISL
₹44,060
Yes
21 Feb 2023
7 Dec 2022
20 Dec 2022
7 Dec 2022
19 Dec 2022
7 Dec 2022
Amount
Laying and Jointing PVC Pipe. Heading
Supply & Installation of On Line BOD/COD/TSS/PH in-situ based Analyzer with panel for S.T.P effluent Measurement items UV- VIS Spectrometry Double beam with entire spectrum scanning 200 – 720 nm / 190- 750nm wave lengths along with 256 unique pixel diode. •MOC of BOD/COD/TSS sensor -Titanium 3.7 / SS316L or better • Cleaning facility.-ultrasonic cleaning or Air pressure Cleaning • Accuracy of BOD/COD/TSS sensor- +/-3% of the measured value • Light Source: Xenon Flash Lamp Following measuring ranges are required :• COD: 0-700 mg/lBOD: 0-400 mg/l TSS: 0-600 mg/l Ph range - 0 to 14 • MOC of ph sensor-Stainless Steel 316 or better •Ph Accuracy +/- 0.2% •protection type : IP 68 for both the Sensor and Cable (Cable lengthas per site requirement) • Controller/Display- Housing Material – Non corrosive e.g.Acrylonitrile-Styrene- Acryloester polymer or better • Protection Rating IP 67 Controller/display cabin box should be IP66 Grade with lock & key SS304 Grade MOC
Ultrasonic open channel flow meter with shall comprise of Flow sensor / transducer, flow transmitter, digital level indicator / remote indicator, control unit • Operating Temperature: 0 to 50°C. • Safety: Explosion Proof or Intrinsically Safe. • Measuring Principal: Ultrasonic. • Communication Protocol: Open Protocol like MODBUS, PROFIBUS, HART, etc. • Analog Output: Isolated 4-20mA. • Relay Contacts: Minimum of 3 SPDT contacts. • Accuracy: ± 0.25% of measured value or better. • Output-. 4 - 20 mA •Protection a.) Sensor: IP-68. b.) Transmitter / Controller: IP-66 (NEMA 4X). • Display: LCD with LED backlighting 130.
1kva UPS • Capacity -1000VA/600W • Input Voltage Range- 140 V ~ 300 V AC Frequency - 50 Hz ± 10% • Operating Temperature- 0°C-40°C; • Charging Time -6~8 Hours recover to 90% capacity Battery Rating -SMF 12V /7AHx2 Batteries. • Output Voltage - 230 V AC Nominal Transfer Time- Typical 4~8ms • Type- Sealed Maintenance Free
Comprehensive Operation & Maintenance Cost for whole system for 1st year including data transmission to CPCB, RSPCB & MCB website, four service visits, two times Calibration of system in a year, repairable Cost, replacement cost, Consumables etc.
Comprehensive Operation & Maintenance Cost for whole system for 2nd year including data transmission to CPCB, RSPCB & MCB website, four service visits, two times Calibration of system in a year, repairable Cost, replacement cost, Consumables etc
Comprehensive Operation & Maintenance Cost for whole system for 3rd year including data transmission to CPCB, RSPCB & MCB website, four service visits, two times Calibration of system in a year, repairable Cost, replacement cost, Consumables etc.
Comprehensive Operation & Maintenance Cost for whole system for 4th year including data transmission to CPCB, RSPCB & MCB website, four service visits, two times Calibration of system in a year, repairable Cost, replacement cost, Consumables etc.
Comprehensive Operation & Maintenance Cost for whole system for 5th year including data transmission to CPCB, RSPCB & MCB website, four service visits, two times Calibration of system in a year, repairable Cost, replacement cost, Consumables etc
Installation Charges
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .