Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.8 LAccepted-AOC BHOWRA NEW QUARTER BHOWRA DHANBAD 828302 JHARKHAND INDIA | DHANBAD | DHANBAD | JHARKHAND | 828302 | ₹1.8 L Quoted ₹2.1 L | L1 | Accepted-AOC NAGENDRA PRASAD SINGH L1 bidder |
| 2 | L2₹2.2 L+₹15,789.60 (7.56%)Rejected-Finance | ₹2.2 L+₹15,789.60 (7.56%) | L2 | Rejected-Finance L2 bidder |
| 3 | L3₹2.3 L+₹17,216.91 (8.25%)Rejected-Finance | ₹2.3 L+₹17,216.91 (8.25%) | L3 | Rejected-Finance L3 bidder |
Tender Value
₹1.8 L
EMD Value
₹2,200
Closing Date
21 Feb 2026, 6:00 pmClosed
ACE, E.J Area
EJ Area Office, Bhowra
Repair and Maintenance of Drain at Gandhi Nagar at Bhowra Under E.J Area
2026_BCCL_353154_1
BCCL/EJA/CIVIL/2025-26/eNIT/82
Open Tender
Civil Works - Buildings
Percentage
28 days
Bhowra
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,200
12 Aug 2026
14 Feb 2026
23 Feb 2026
14 Feb 2026
21 Feb 2026
14 Feb 2026
14 Feb 2026 - 19 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 2 | Cleaning of Drain | 19.8 | M3 | 356 | ₹7,048.8 |
| 3 | Transporting of garbage,debris,rubbish etc up to 1.00 km | 1 | M3 | 149.3 | ₹149.15 |
| 4 | Brick work of class degination 1:6 I foundation and Plinth | 9.11 | M3 | 5,002.04 | ₹45,568.58 |
| 5 | 12 mm cement plaster finished with a floating coat of neat cement of mix :1:4 (1 cement: 4 fine sand) | 1 | M2 | 288.25 | ₹287.96 |
| 6 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, ifnishing and reinforcement- All work up to plinth level :1:1.5:3 (1 cement: 1.5 coarse sand (zone-III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources). | 4.24 | M3 | 6,856.3 | ₹29,070.71 |
| 7 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.Thermo-Mechanically Treated bars of grade Fe-500D or more. | 341.69 | KG | 75.65 | ₹25,848.85 |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete | 16.17 | M2 | 247.95 | ₹4,009.35 |
| 9 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources). | 1.65 | M3 | 5,120.95 | ₹8,449.57 |
| 10 | Total impact of GST for the purpose of CTC | - | Nos | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 2.02 MB
BOQ_365939.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .