Loading…
Loading…
Tender Value
₹12.4 L
EMD Value
₹13,000
Closing Date
9 Apr 2026, 6:00 pmClosed
Similar tender results from the same govt authority in the past 3 years.
EXECUTIVE ENGINEER SALINITY CONTROL DIVISION Jam-Khambhalia
Desilting of Gojinesh Minor-4 spreading for the year 2026-27
291411
short term Tender Notice No. 27 of 2025-26
Open
Civil - All
Devbhumi Dwarka
4 documents required · 4 mandatory
₹900
Yes
Executive engineer, salinity control division jam-khambhaliya
₹13,000
Yes
30 Mar 2026
30 Mar 2026
30 Mar 2026
9 Apr 2026
30 Mar 2026
BILL OF QUANTITIES
(A) Percentage rate tender (Upto INR 50 Cr.)
Name of work :- Desilting of Gojinesh Minor -4 Spreading Canal for the Year 2026-27.
m Description of Item Quantity Unit Amount
1 Jungle Clearance of Specified category and bushes for 50000.00 Sqmt 5.90
canal/dam work as directed with depositing material etc
complete(Excluding tree of grith above 0.5 mt)(B) More than
year old (c) For Heavy Dence
2 Clearing the silt from canal/drain bed by digging the same to the 3575.00 Cum. 260.00
required bed level and gradient including depositing the
excavated earth regularly on spoil bank for utilizing the same for
preepairing the bund after bracking the clods as and where
directed for lead upto 30 mt and lift as under. (Excluding weed
cutting ) (A) Depth 3.0 to 6.0 mt.
3 De-silting of various structures of canal and distribution 50 Cum. 296
system including depositing the same as directed with all lifts
and lead for canal syphone,airvent,T.O. Kundies etc. complete.
Total Rs. 1239300.00/-
Amount Put to BID 12,39,300.00/-
I/We am/are willing to carry out the work at… ..................... % above/below percent (Should be written in figures and
words) of the estimated rate mentioned above. Amount of my /our tender works out as under :
Estimated amount put to tender Estimated amount put to tender
Deduct………% below Add………% Above
In words In words
1 The Contractor shall exhibit a board with detailed specification and details of work asdirected by the Engineer-In-Charge for which no extra
payment shall be made.
2 The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
3 GST and Income tax TDS will be deducted at a source while making payments of bills
4 In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as perGovt. G.R.: PRC-10/2017 Cement Consumption/16/C
Date:11/05/2017 as stated in
S.O.R. therefore in R.C.C. items where there is a change as per actual mix design the cost of difference of cement consumption have been
deducted from the rate of original itemat the rate of input rate mentioned in all the tender.
Contractor Deputy Executive Engineer
Salinity Control Sub Division
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
SBD Gojinesh Minor-4 Canal 26-27.pdf
Tech. Spec.Gojinesh Minor-4 Canal 26-27.pdf
3.BOQ Gojinesh Minor-4 Canal 26-27.pdf
Tender Notice No. 27 of 2025-26.pdf
Download all tender documents and submit your bid