Loading…
New: tenders and results on WhatsApp
New: Find tenders, results and companies on WhatsApp, by text or voice note
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹8.1 LAccepted-AOC THACHAVALLATH H KAYANTIKKARA MUPPATHADAM PO PIN 683110 | ERNAKULAM | KERALA | 683110 | 1 | Accepted-AOC 1 | |
| 2 | 2₹9.2 L+₹1.0 L (12.9%)Rejected-AOC | 2 | Rejected-AOC 2 | |
| 3 | Rejected-Technical | - | Rejected-Technical 3 | |
| 4 | Rejected-Technical | - | Rejected-Technical 4 |
Tender Value
₹10.2 L
EMD Value
₹25,414
Closing Date
4 Mar 2025, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Assistant Engineer
Office of the Assistant Engineer, LIDEW Section, Kalamassery Municipality
GENERAL-661/25-Completion of velathikulam balance- 17
2025_LSGD_742314_8
LIDEW/AEE/ET/11/2025
Open Tender
Civil Works - Roads
Item Rate
180 days
Kalamassery
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
Yes
₹25,414
Yes
23 Jun 2025
27 Feb 2025
6 Mar 2025
27 Feb 2025
4 Mar 2025
27 Feb 2025
Amount
Completion velathikulam
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
16.78.3:Construction of granular sub- base by Providing close graded Material conforming to specifications, mixing in a mechanical mix plant at OMC, Carriage of mixed material by tippers to work site, for all leads & lifts, spreading in uniform layers of specified thickness with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per specifications and directions of Engineer-in- Charge.With material conforming to Grade - III ( size range 26.5 mm to 0.075 mm) having CBR Value - 20
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
4.1.4:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 )1 cement : 2 coarse sand : 4 graded stone aggregate 40 mm nominal size)
OD468857/2024-2025:Random Rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12(1 cement:6 coarse sand :12 graded stone aggregate 20mm nominal size ) up to plinth level with cement mirtar 1:6(1 cement:6 coarse sand)
2.25:Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.
ASHRAF P V (BID ID -2138285)
A.M.ABDUL SALAM (BID ID -2138267)
T.K.SUNEESH MOHAMMED (BID ID -2137909)
Bidder Name
T.K.SUNEESH MOHAMMED
ASHRAF P V
A.M.ABDUL SALAM
JINISH MOHAMMED
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1195133.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .