Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹28.2 LAccepted-AOC | L1 | Accepted-AOC L1 |
Tender Value
Refer Docs
EMD Value
₹50,000
Closing Date
18 Dec 2020, 3:30 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
O/O The Executive Engineer Iriigation Division TVPM Public Office building compound Palayam
Sdrf works
2020_Irrig_398557_2
37/EE/2020-21
Open Tender
Civil Works - Others
Item Rate
180 days
Neyyar dam
Please refer Tender documents.
5 documents required · 5 mandatory
₹2,760
Yes
₹50,000
Yes
25 Feb 2021
9 Dec 2020
23 Dec 2020
9 Dec 2020
18 Dec 2020
10 Dec 2020
10 Dec 2020 - 18 Dec 2020
60 days
Amount
Scheme: 1 Ch: 17000 m to Ch: 17300 m
2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
60.2.2 : Bailing out water Using 5HP Pump- Bailing out water with 5HP engine and pump set including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete
od33993/2020_2021/IA : Earth work in surface excavation by mechanical (Hydraulic excavator)/ manual means for desilting the canal areas including carrying and conveying the excavated material from the source to the vehicle/ access point. if the soil is in good condition the cost of the same shall be recovered from the contractor as per the direction of departmental officers at site.
Scheme- 2 Ch:17300 m to Ch:17600 m
2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
60.2.2 : Bailing out water Using 5HP Pump- Bailing out water with 5HP engine and pump set including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete
od33994/2020_2021/IA : Earth work in surface excavation by mechanical (Hydraulic excavator)/ manual means for desilting the canal areas including carrying and conveying the excavated material from the source to the vehicle/ access point. if the soil is in good condition the cost of the same shall be recovered from the contractor as per the direction of departmental officers at site.
Scheme-3 Ch: 17600 m to Ch: 17900 m
2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
60.2.2 : Bailing out water Using 5HP Pump- Bailing out water with 5HP engine and pump set including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete
od33994/2020_2021/IA : Earth work in surface excavation by mechanical (Hydraulic excavator)/ manual means for desilting the canal areas including carrying and conveying the excavated material from the source to the vehicle/ access point. if the soil is in good condition the cost of the same shall be recovered from the contractor as per the direction of departmental officers at site.
Scheme-4 Ch: 17900 m to Ch: 18200 m
2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
60.2.2 : Bailing out water Using 5HP Pump- Bailing out water with 5HP engine and pump set including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete
od33994/2020_2021/IA : Earth work in surface excavation by mechanical (Hydraulic excavator)/ manual means for desilting the canal areas including carrying and conveying the excavated material from the source to the vehicle/ access point. if the soil is in good condition the cost of the same shall be recovered from the contractor as per the direction of departmental officers at site.
Scheme: 5 Ch:18200 m to Ch: 18500 m
2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
60.2.2 : Bailing out water Using 5HP Pump- Bailing out water with 5HP engine and pump set including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete
od33994/2020_2021/IA : Earth work in surface excavation by mechanical (Hydraulic excavator)/ manual means for desilting the canal areas including carrying and conveying the excavated material from the source to the vehicle/ access point. if the soil is in good condition the cost of the same shall be recovered from the contractor as per the direction of departmental officers at site.
Scheme: 6 Ch:18500m to Ch: 18800 m
2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
60.2.2 : Bailing out water Using 5HP Pump- Bailing out water with 5HP engine and pump set including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete
od33994/2020_2021/IA : Earth work in surface excavation by mechanical (Hydraulic excavator)/ manual means for desilting the canal areas including carrying and conveying the excavated material from the source to the vehicle/ access point. if the soil is in good condition the cost of the same shall be recovered from the contractor as per the direction of departmental officers at site.
Scheme:7 Ch:18800 m to Ch:19100
2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
60.2.2 : Bailing out water Using 5HP Pump- Bailing out water with 5HP engine and pump set including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete
od33994/2020_2021/IA : Earth work in surface excavation by mechanical (Hydraulic excavator)/ manual means for desilting the canal areas including carrying and conveying the excavated material from the source to the vehicle/ access point. if the soil is in good condition the cost of the same shall be recovered from the contractor as per the direction of departmental officers at site.
Scheme:8 Ch:19100 m to Ch:19400 m
2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
60.2.2 : Bailing out water Using 5HP Pump- Bailing out water with 5HP engine and pump set including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete
od33994/2020_2021/IA : Earth work in surface excavation by mechanical (Hydraulic excavator)/ manual means for desilting the canal areas including carrying and conveying the excavated material from the source to the vehicle/ access point. if the soil is in good condition the cost of the same shall be recovered from the contractor as per the direction of departmental officers at site.
Scheme:9 Ch:19400 m to Ch:19700 m
2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
60.2.2 : Bailing out water Using 5HP Pump- Bailing out water with 5HP engine and pump set including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete
od33994/2020_2021/IA : Earth work in surface excavation by mechanical (Hydraulic excavator)/ manual means for desilting the canal areas including carrying and conveying the excavated material from the source to the vehicle/ access point. if the soil is in good condition the cost of the same shall be recovered from the contractor as per the direction of departmental officers at site.
Scheme:10 Ch:19700 m to Ch:20000 m
2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
60.2.2 : Bailing out water Using 5HP Pump- Bailing out water with 5HP engine and pump set including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete
od33994/2020_2021/IA : Earth work in surface excavation by mechanical (Hydraulic excavator)/ manual means for desilting the canal areas including carrying and conveying the excavated material from the source to the vehicle/ access point. if the soil is in good condition the cost of the same shall be recovered from the contractor as per the direction of departmental officers at site.
Scheme:11 Ch:20000 m to Ch:20300
2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
60.2.2 : Bailing out water Using 5HP Pump- Bailing out water with 5HP engine and pump set including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete
od33994/2020_2021/IA : Earth work in surface excavation by mechanical (Hydraulic excavator)/ manual means for desilting the canal areas including carrying and conveying the excavated material from the source to the vehicle/ access point. if the soil is in good condition the cost of the same shall be recovered from the contractor as per the direction of departmental officers at site.
Scheme:12 Ch:20300 m to Ch:20600 m
2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
60.2.2 : Bailing out water Using 5HP Pump- Bailing out water with 5HP engine and pump set including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete
od33994/2020_2021/IA : Earth work in surface excavation by mechanical (Hydraulic excavator)/ manual means for desilting the canal areas including carrying and conveying the excavated material from the source to the vehicle/ access point. if the soil is in good condition the cost of the same shall be recovered from the contractor as per the direction of departmental officers at site.
Scheme:13 Ch:20600 m to Ch:20900 m
2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
60.2.2 : Bailing out water Using 5HP Pump- Bailing out water with 5HP engine and pump set including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete
od33994/2020_2021/IA : Earth work in surface excavation by mechanical (Hydraulic excavator)/ manual means for desilting the canal areas including carrying and conveying the excavated material from the source to the vehicle/ access point. if the soil is in good condition the cost of the same shall be recovered from the contractor as per the direction of departmental officers at site.
Scheme:14 Ch:20900 m to Ch:21200
2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
60.2.2 : Bailing out water Using 5HP Pump- Bailing out water with 5HP engine and pump set including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete
od33994/2020_2021/IA : Earth work in surface excavation by mechanical (Hydraulic excavator)/ manual means for desilting the canal areas including carrying and conveying the excavated material from the source to the vehicle/ access point. if the soil is in good condition the cost of the same shall be recovered from the contractor as per the direction of departmental officers at site.
Scheme:15 Ch:21200 m to Ch:21500 m
2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
60.2.2 : Bailing out water Using 5HP Pump- Bailing out water with 5HP engine and pump set including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete
od33994/2020_2021/IA : Earth work in surface excavation by mechanical (Hydraulic excavator)/ manual means for desilting the canal areas including carrying and conveying the excavated material from the source to the vehicle/ access point. if the soil is in good condition the cost of the same shall be recovered from the contractor as per the direction of departmental officers at site.
Scheme:16 Ch:21500 m to Ch:21800 m
2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
60.2.2 : Bailing out water Using 5HP Pump- Bailing out water with 5HP engine and pump set including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete
od33994/2020_2021/IA : Earth work in surface excavation by mechanical (Hydraulic excavator)/ manual means for desilting the canal areas including carrying and conveying the excavated material from the source to the vehicle/ access point. if the soil is in good condition the cost of the same shall be recovered from the contractor as per the direction of departmental officers at site.
Scheme:17 Ch:21800 m to Ch:22100 m
2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
60.2.2 : Bailing out water Using 5HP Pump- Bailing out water with 5HP engine and pump set including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete
od33994/2020_2021/IA : Earth work in surface excavation by mechanical (Hydraulic excavator)/ manual means for desilting the canal areas including carrying and conveying the excavated material from the source to the vehicle/ access point. if the soil is in good condition the cost of the same shall be recovered from the contractor as per the direction of departmental officers at site.
Scheme:18 Ch:22100 m to Ch:22400 m
2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
60.2.2 : Bailing out water Using 5HP Pump- Bailing out water with 5HP engine and pump set including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete
od33994/2020_2021/IA : Earth work in surface excavation by mechanical (Hydraulic excavator)/ manual means for desilting the canal areas including carrying and conveying the excavated material from the source to the vehicle/ access point. if the soil is in good condition the cost of the same shall be recovered from the contractor as per the direction of departmental officers at site.
Scheme:19 Ch:22400 m to Ch:22700 m
2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
60.2.2 : Bailing out water Using 5HP Pump- Bailing out water with 5HP engine and pump set including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete
od33994/2020_2021/IA : Earth work in surface excavation by mechanical (Hydraulic excavator)/ manual means for desilting the canal areas including carrying and conveying the excavated material from the source to the vehicle/ access point. if the soil is in good condition the cost of the same shall be recovered from the contractor as per the direction of departmental officers at site.
Scheme:20 Ch:22700 m to Ch:23000 m
2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
60.2.2 : Bailing out water Using 5HP Pump- Bailing out water with 5HP engine and pump set including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete
od33994/2020_2021/IA : Earth work in surface excavation by mechanical (Hydraulic excavator)/ manual means for desilting the canal areas including carrying and conveying the excavated material from the source to the vehicle/ access point. if the soil is in good condition the cost of the same shall be recovered from the contractor as per the direction of departmental officers at site.
Bidder Name
D C DETHY
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_569785.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .