Loading…
Loading…
Tender Value
₹5.8 Cr
EMD Value
₹7.2 L
Closing Date
11 Jul 2026, 5:00 pm5d left
GM (Civil)/HOD, ECL HQ
Civil Engineering Department, Office of the Chairman-cum-Managing Director Sanctoria, P.O. Dishergarh, Dist. Burdwan, West Bengal-713333
Comprehensive Annual Maintenance and Upkeeping of ECL HQ Campus including Administrative Building, Technical Building, Sheetalpur Guest House, CVO Office and Environment Office at Barachak for 730 days under ECL HQ.
2026_ECL_360450_1
ECL/HQ/GM(C)/e-tender/26-27/11 date 20.06.2026
Open Tender
Miscellaneous Services
730 days
Sanctoria
As per Tender Documents
5 documents required · 5 mandatory
₹7.2 L
25 Jun 2026
25 Jun 2026
13 Jul 2026
25 Jun 2026
11 Jul 2026
26 Jun 2026
25 Jun 2026 - 4 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.000 | CIVIL WORKS | - | - | - | - |
| 0.999 | Carriage of Materials By Mechanical Transport including loading,unloading and stacking: Lime, moorum, building rubbish Lead - 5 km | 3,200 | cum | 199.9 | ₹6,39,680 |
| 0.000 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. | 30 | cum | 190.35 | ₹5,710.5 |
| 0.999 | P/L in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 Cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 40 mm nominal size derived from natural sources) | 10 | cum | 6,253.9 | ₹62,539 |
| 0.000 | P/L in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | 10 | cum | 5,816.85 | ₹58,168.5 |
| 0.999 | P/L in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 10 | cum | 6,389.45 | ₹63,894.5 |
| 0.000 | Extra for providing and mixing water proofing material in cement concrete work in doses by weight of cement as per manufacturer's specification. | 30 | per bag of cement of 50 kg | 49.1 | ₹1,473 |
| 0.999 | Reinforced cement concrete work in beams, suspended foors, roofs having slope up to 15* landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to foor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources). | 5 | cum | 9,272 | ₹46,360 |
| 0.000 | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete. | 10 | sqm | 305 | ₹3,050 |
| 0.999 | Centering and shuttering including strutting, propping etc. and removal of form for Suspended floors, roofs, landings, balconies and access platform | 30 | sqm | 725.25 | ₹21,757.5 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 1.32 MB
Tendernotice_2.pdf
PDF • 0.70 MB
BOQ_373317.xls
BOQ • 0.46 MB
Download all tender documents and submit your bid