| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.9 CrAdmitted-Finance | ₹2.9 Cr | L1 | Admitted-Finance |
| 2 | L2₹2.9 Cr+₹1.0 L (0.36%)Admitted-Finance | ₹2.9 Cr+₹1.0 L (0.36%) | L2 | Admitted-Finance |
| 3 | L3₹2.9 Cr+₹1.4 L (0.48%)Admitted-Finance | ₹2.9 Cr+₹1.4 L (0.48%) | L3 | Admitted-Finance |
| 4 | L4₹3.0 Cr+₹16.4 L (5.76%)Admitted-Finance BARZ PATRA KHORCHA | ₹3.0 Cr+₹16.4 L (5.76%) | L4 | Admitted-Finance |
| 5 | Rejected-Technical | - | - | Rejected-Technical DISQUALIFIED |
| Sl No | Description | Qty | Unit | Rabindra Sahu L4 | Tapan Kumar Sahoo L2 | DEBENDRA KUMAR DASH L3 | KAPIL CONSTRUCTION CO. L1 |
|---|---|---|---|---|---|---|---|
| 1.00Supplying Labour, Materials and T&P for . Laying of pipe line construction of vlavechamber, construction of Boundray wall ,Providing 100% FHTC etc. With 5 years operation & maintenance in connection with PWS to Ramachandrapur under Kukudakhandi Block. | |||||||
| 1.01 | Supplying all materials labour T&P for construction of Compound wall .Laying, testing and commissioning of Rising main & Distribution system pipe line such as UPVC,HDPE,ASTM, G.I /CI pipes line etc along with required fittings & specials and construction of valve chamber,display board,individual house hold connection etc.as per detail scope of work & technical specification, quantity of work mention in Schedule-I in DTCN and in ( Annexure-A to B). Materials as required shall be supplied by the Contractor as per terms and condition of DTCN & all dimensions are as per Schedule-I in DTCN and as per direction of Engineer in Charge . All work shall be completed in such a manner that all house hold of entire village will get required quantity of drinking water with residual head of 7m without any likage in the entire PWS system as per direction of Engineer-in-charge. | 1 | Nos | 27,41,515 ₹27,41,515 | 26,01,698 ₹26,01,698 Lowest | 26,04,713 ₹26,04,713 | 27,41,515.85 ₹27,41,515.85 |
| 1.02 | The contractor shall maintain the PWS Project for five ( 5 ) calender years from the completion date concurrent with defect liability period of one year in such a manner that all the house hold of the PWS Scheme covered area will get ( adepuate ) required quantity of supply water taking supply hour as 8 hour / day without facing any problems. The contractor shall repair and replace any types of defect arise within 24 Hrs of receipt of complain either from public or from Department. The contractor shall maintain all structure of the PWS Schemes as per terms and conditions of DTCN & Technical spacification mentioned (As per Annexure) | 1 | Nos | 1,37,075 ₹1,37,075 | 1,30,084 ₹1,30,084 Lowest | 1,30,234 ₹1,30,234 | 1,37,075.79 ₹1,37,075.79 |
| 2.00Supplying Labour, Materials and T&P for . Laying of pipe line , Construction of valve chambers, Standposts, Providing 100% FHTC etc. With 5 years operation & maintenance in connection with PWS to Krupasindhupur under Kukudakhandi Block. | |||||||
| 2.01 | Supplying all materials labour T&P for.Laying, testing and commissioning of Rising main & Distribution system pipe line such as UPVC,HDPE,ASTM, G.I /CI pipes line etc along with required fittings & specials and construction of valve chamber,stand post, bore well platform,recharge pit,individual house hold connection, Drinking Water supply provision to School / AWC / G.P. Office, installation of submersible pump with motor in deep Tube well etc.as per detail scope of work & technical specification, quantity of work mention in Schedule-I in DTCN and in ( Annexure-A ). Materials as required shall be supplied by the Contractor as per terms and condition of DTCN & all dimensions are as per Schedule-I in DTCN and as per direction of Engineer in Charge . All work shall be completed in such a manner that all house hold of entire village will get required quantity of drinking water with residual head of 7m without any likage in the entire PWS system as per direction of Engineer-in-charge. | 1 | Nos | 27,37,985 ₹27,37,985 | 25,98,348 ₹25,98,348 | 26,01,359 ₹26,01,359 | 25,37,000 ₹25,37,000 Lowest |
| 2.02 | The contractor shall maintain the PWS Project for five ( 5 ) calender years from the completion date concurrent with defect liability period of one year in such a manner that all the house hold of the PWS Scheme covered area will get ( adepuate ) required quantity of supply water taking supply hour as 8 hour / day without facing any problems. The contractor shall repair and replace any types of defect arise within 24 Hrs of receipt of complain either from public or from Department. The contractor shall maintain all structure of the PWS Schemes as per terms and conditions of DTCN & Technical spacification mentioned (As per Annexure) | 1 | Nos | 1,36,899 ₹1,36,899 | 1,29,917 ₹1,29,917 Lowest | 1,30,067 ₹1,30,067 | 1,36,899.27 ₹1,36,899.27 |
| 3.00Supplying Labour, Materials and T&P for . Laying of pipe line , Construction of valve chamber, construction of compound wall ,pumping unit instaltion , Standpost, 100kl RCC UGR Providing 100% FHTC etc. With 5 years operation & maintenance in connection with PWS to Khandadeuli under Ganjam Block. | |||||||
| 3.01 | Supplying all materials labour T&P for construction of Compound wall .Laying, testing and commissioning of Rising main & Distribution system pipe line such as UPVC,HDPE,ASTM, G.I /CI pipes line etc along with required fittings & specials and construction of valve chamber,stand post, bore well platform,recharge pit,individual house hold connection, Drinking Water supply provision to School / AWC / G.P. Office, installation of submersible pump with motor in deep Tube well etc.as per detail scope of work & technical specification, quantity of work mention in Schedule-I in DTCN and in ( Annexure-A to C). Materials as required shall be supplied by the Contractor as per terms and condition of DTCN & all dimensions are as per Schedule-I in DTCN and as per direction of Engineer in Charge . All work shall be completed in such a manner that all house hold of entire village will get required quantity of drinking water with residual head of 7m without any likage in the entire PWS system as per direction of Engineer-in-charge. | 1 | Nos | 65,68,450 ₹65,68,450 | 62,33,459 ₹62,33,459 | 62,40,684 ₹62,40,684 | 53,68,000 ₹53,68,000 Lowest |
| 3.02 | Construction of Under Ground RESERVOIR (Construction of 100,000 LTR RCC UGR)
Supplying of all labour,T&P, material including taxes , testing ,supply of design, drawing , construction,errection,testing & commissioning etc. of RCC Under ground reservoir of 100,000 ltrs capacity Cylindrical Container with circular dome, full raft using CC M-25 , with PCC layers as per approved drawing,supplying, fitting & fixing of 100 mm dia medium grade GI pipe Tata/Jindal/Sail/Nezone make confirming to IS specification of required length from PW to UGR & UGR to rising main including in-let,out-let,over flow & washing line of UGR, and use of aluminium ladder inside the OGR,CI puddle collar,0.6 m dia CI manhole cover at dome(2 Nos.) , RCC vent with brass jally,l,water level indicator etc. complete as per direction of the Engineer - in- Charge. (The contractor is to approve all structural design & drawing from State Technical Agency IGIT,Saranga /CET,BBSR/VSS UT,Burla /NIT,Rourkela /IIT,BBSR/PMEC,Berhampur at his own cost) | 1 | Nos | 6,56,590 ₹6,56,590 | 6,23,103 ₹6,23,103 Lowest | 6,23,826 ₹6,23,826 | 6,56,590 ₹6,56,590 |
| 3.03 | The contractor shall maintain the PWS Project for five ( 5 ) calender years from the completion date concurrent with defect liability period of one year in such a manner that all the house hold of the PWS Scheme covered area will get ( adepuate ) required quantity of supply water taking supply hour as 8 hour / day without facing any problems. The contractor shall repair and replace any types of defect arise within 24 Hrs of receipt of complain either from public or from Department. The contractor shall maintain all structure of the PWS Schemes as per terms and conditions of DTCN & Technical spacification mentioned (As per Annexure) | 1 | Nos | 3,61,252 ₹3,61,252 | 3,42,828 ₹3,42,828 | 3,43,225 ₹3,43,225 | 3,21,252.03 ₹3,21,252.03 Lowest |
Tender Value
₹3.0 Cr
Closing Date
16 Apr 2022, 5:00 pmClosed
Superintending Engineer, RWSS Division, Bam
Near Jarada Bunglow, Berhampur
PWS to villages (1) Ramachandrapur (2) Krupasindhupur under Kukudakhandi Block (3) Khandadeuli (4) Poirasi (5)Jhatikhola (6) Kaluabadi under Ganjam Block
2022_RWSS_76469_5
EERWSSBAM- 39 (A) / 2021-22
National Competitive Bid
Civil Works - Water Works
Item Rate
360 days
PWS to villages (1) Ramachandrapur OTH
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
Exempted
27 May 2022
25 Mar 2022
18 Apr 2022
25 Mar 2022
16 Apr 2022
25 Mar 2022
25 Mar 2022 - 11 Apr 2022
Amount
Supplying Labour, Materials and T&P for . Laying of pipe line construction of vlavechamber, construction of Boundray wall ,Providing 100% FHTC etc. With 5 years operation & maintenance in connection with PWS to Ramachandrapur under Kukudakhandi Block.
Supplying all materials labour T&P for construction of Compound wall .Laying, testing and commissioning of Rising main & Distribution system pipe line such as UPVC,HDPE,ASTM, G.I /CI pipes line etc along with required fittings & specials and construction of valve chamber,display board,individual house hold connection etc.as per detail scope of work & technical specification, quantity of work mention in Schedule-I in DTCN and in ( Annexure-A to B). Materials as required shall be supplied by the Contractor as per terms and condition of DTCN & all dimensions are as per Schedule-I in DTCN and as per direction of Engineer in Charge . All work shall be completed in such a manner that all house hold of entire village will get required quantity of drinking water with residual head of 7m without any likage in the entire PWS system as per direction of Engineer-in-charge.
The contractor shall maintain the PWS Project for five ( 5 ) calender years from the completion date concurrent with defect liability period of one year in such a manner that all the house hold of the PWS Scheme covered area will get ( adepuate ) required quantity of supply water taking supply hour as 8 hour / day without facing any problems. The contractor shall repair and replace any types of defect arise within 24 Hrs of receipt of complain either from public or from Department. The contractor shall maintain all structure of the PWS Schemes as per terms and conditions of DTCN & Technical spacification mentioned (As per Annexure)
Supplying Labour, Materials and T&P for . Laying of pipe line , Construction of valve chambers, Standposts, Providing 100% FHTC etc. With 5 years operation & maintenance in connection with PWS to Krupasindhupur under Kukudakhandi Block.
Supplying all materials labour T&P for.Laying, testing and commissioning of Rising main & Distribution system pipe line such as UPVC,HDPE,ASTM, G.I /CI pipes line etc along with required fittings & specials and construction of valve chamber,stand post, bore well platform,recharge pit,individual house hold connection, Drinking Water supply provision to School / AWC / G.P. Office, installation of submersible pump with motor in deep Tube well etc.as per detail scope of work & technical specification, quantity of work mention in Schedule-I in DTCN and in ( Annexure-A ). Materials as required shall be supplied by the Contractor as per terms and condition of DTCN & all dimensions are as per Schedule-I in DTCN and as per direction of Engineer in Charge . All work shall be completed in such a manner that all house hold of entire village will get required quantity of drinking water with residual head of 7m without any likage in the entire PWS system as per direction of Engineer-in-charge.
The contractor shall maintain the PWS Project for five ( 5 ) calender years from the completion date concurrent with defect liability period of one year in such a manner that all the house hold of the PWS Scheme covered area will get ( adepuate ) required quantity of supply water taking supply hour as 8 hour / day without facing any problems. The contractor shall repair and replace any types of defect arise within 24 Hrs of receipt of complain either from public or from Department. The contractor shall maintain all structure of the PWS Schemes as per terms and conditions of DTCN & Technical spacification mentioned (As per Annexure)
Supplying Labour, Materials and T&P for . Laying of pipe line , Construction of valve chamber, construction of compound wall ,pumping unit instaltion , Standpost, 100kl RCC UGR Providing 100% FHTC etc. With 5 years operation & maintenance in connection with PWS to Khandadeuli under Ganjam Block.
Supplying all materials labour T&P for construction of Compound wall .Laying, testing and commissioning of Rising main & Distribution system pipe line such as UPVC,HDPE,ASTM, G.I /CI pipes line etc along with required fittings & specials and construction of valve chamber,stand post, bore well platform,recharge pit,individual house hold connection, Drinking Water supply provision to School / AWC / G.P. Office, installation of submersible pump with motor in deep Tube well etc.as per detail scope of work & technical specification, quantity of work mention in Schedule-I in DTCN and in ( Annexure-A to C). Materials as required shall be supplied by the Contractor as per terms and condition of DTCN & all dimensions are as per Schedule-I in DTCN and as per direction of Engineer in Charge . All work shall be completed in such a manner that all house hold of entire village will get required quantity of drinking water with residual head of 7m without any likage in the entire PWS system as per direction of Engineer-in-charge.
Construction of Under Ground RESERVOIR (Construction of 100,000 LTR RCC UGR) Supplying of all labour,T&P, material including taxes , testing ,supply of design, drawing , construction,errection,testing & commissioning etc. of RCC Under ground reservoir of 100,000 ltrs capacity Cylindrical Container with circular dome, full raft using CC M-25 , with PCC layers as per approved drawing,supplying, fitting & fixing of 100 mm dia medium grade GI pipe Tata/Jindal/Sail/Nezone make confirming to IS specification of required length from PW to UGR & UGR to rising main including in-let,out-let,over flow & washing line of UGR, and use of aluminium ladder inside the OGR,CI puddle collar,0.6 m dia CI manhole cover at dome(2 Nos.) , RCC vent with brass jally,l,water level indicator etc. complete as per direction of the Engineer - in- Charge. (The contractor is to approve all structural design & drawing from State Technical Agency IGIT,Saranga /CET,BBSR/VSS UT,Burla /NIT,Rourkela /IIT,BBSR/PMEC,Berhampur at his own cost)
The contractor shall maintain the PWS Project for five ( 5 ) calender years from the completion date concurrent with defect liability period of one year in such a manner that all the house hold of the PWS Scheme covered area will get ( adepuate ) required quantity of supply water taking supply hour as 8 hour / day without facing any problems. The contractor shall repair and replace any types of defect arise within 24 Hrs of receipt of complain either from public or from Department. The contractor shall maintain all structure of the PWS Schemes as per terms and conditions of DTCN & Technical spacification mentioned (As per Annexure)
Supplying Labour, Materials and T&P for . Laying of pipe line , Construction of valve chamber, construction of compound wall ,pump house,pumping unit instaltion , Standpost ,50 KL Capacity RCC OHT with 12 Mtr Staging, Providing 100% FHTC etc. With 5 years operation & maintenance in connection with PWS to Poirasi under Ganjam Block.
Supplying all materials labour T&P design, drawing ,soil testing etc. complete in all respect for construction of RCC Roof building Pump House and construction of Compound wall for Pump House .Laying, testing and commissioning of Rising main & Distribution system pipe line such as UPVC,HDPE,ASTM, G.I /CI pipes line etc along with required fittings & specials and construction of valve chamber, bore well platform,individual house hold connection, Drinking Water supply provision to School / AWC / G.P. Office, installation of submersible pump with motor in deep Tube well etc.as per detail scope of work & technical specification, quantity of work mention in Schedule-I in DTCN and in ( Annexure-A to D). Materials as required shall be supplied by the Contractor as per terms and condition of DTCN & all dimensions are as per Schedule-I in DTCN and as per direction of Engineer in Charge . All work shall be completed in such a manner that all house hold of entire village will get required quantity of drinking water with residual head of 7m without any likage in the entire PWS system as per direction of Engineer-in-charge.
Construction of 50,000 LTR OHR WITH 12M STAGING Supplying of all labour,T&P,material including taxes for soil testing ,supply of design, drawing, construction,errection,testing & commissioning etc. of RCC elevated storage reservoir of 50,000 ltrs capacity with necessary staging height of 12 mtr consisting of cylindrical container with minimum 6 nos RCC columns and circular dome with full raft using CC M-25 with RCC stair case as per approved drawing,supplying, fitting & fixing of 80 mm medium grade GI pipe Tata/Jindal/Sail make confirming to IS specification of required length from production well to ESR & ESR to rising main including in-let,out-let,over flow & washing line of ESR,use of 32 mm GI pipe for Gallary and vertical post. and Aluminium ladder inside and outside the ESR,CI puddle collar,0.6 m dia CI manhole cover at dome , RCC vent with brass jally, lightening arrestor and water level indicator etc. complete as per direction of the Engineer - in- Charge. (The contractor is to approve all structural design & drawing from State Technical Agency IGIT,Saranga /CET,BBSR /VSSUT,Burla /NIT,Rourkela/IIT,BBSR/PMEC,Berhampur at his own cost)
The contractor shall maintain the PWS Project for five ( 5 ) calender years from the completion date concurrent with defect liability period of one year in such a manner that all the house hold of the PWS Scheme covered area will get ( adepuate ) required quantity of supply water taking supply hour as 8 hour / day without facing any problems. The contractor shall repair and replace any types of defect arise within 24 Hrs of receipt of complain either from public or from Department. The contractor shall maintain all structure of the PWS Schemes as per terms and conditions of DTCN & Technical spacification mentioned (As per Annexure)
Supplying Labour, Materials and T&P for . Laying of pipe line ,Construction of valve chambers, construction of compound wall ,pump house,pumping unit instaltion , Standpost 50 KL Capacity RCC OHR with 12 Mtr Staging, 50 KL Capacity RCC UGR , Providing 100% FHTC etc. With 5 years operation & maintenance in connection with PWS to Jatiakhola under Ganjam Block.
Supplying all materials labour T&P design, drawing ,soil testing etc. complete in all respect for construction of RCC Roof building Pump House and construction of Compound wall for Pump House .Laying, testing and commissioning of Rising main & Distribution system pipe line such as UPVC,HDPE,ASTM, G.I /CI pipes line etc along with required fittings & specials and construction of valve chamber,stand post, bore well platform,recharge pit,individual house hold connection, Drinking Water supply provision to School / AWC / G.P. Office, installation of submersible pump with motor in deep Tube well etc.as per detail scope of work & technical specification, quantity of work mention in Schedule-I in DTCN and in ( Annexure-A to D). Materials as required shall be supplied by the Contractor as per terms and condition of DTCN & all dimensions are as per Schedule-I in DTCN and as per direction of Engineer in Charge . All work shall be completed in such a manner that all house hold of entire village will get required quantity of drinking water with residual head of 7m without any likage in the entire PWS system as per direction of Engineer-in-charge.
Construction of 50,000 LTR OHR WITH 12M STAGING Supplying of all labour,T&P,material including taxes for soil testing ,supply of design, drawing, construction,errection,testing & commissioning etc. of RCC elevated storage reservoir of 50,000 ltrs capacity with necessary staging height of 12 mtr consisting of cylindrical container with minimum 6 nos RCC columns and circular dome with full raft using CC M-25 with RCC stair case as per approved drawing,supplying, fitting & fixing of 80 mm medium grade GI pipe Tata/Jindal/Sail make confirming to IS specification of required length from production well to ESR & ESR to rising main including in-let,out-let,over flow & washing line of ESR,use of 32 mm GI pipe for Gallary and vertical post. and Aluminium ladder inside and outside the ESR,CI puddle collar,0.6 m dia CI manhole cover at dome , RCC vent with brass jally, lightening arrestor and water level indicator etc. complete as per direction of the Engineer - in- Charge. (The contractor is to approve all structural design & drawing from State Technical Agency IGIT,Saranga /CET,BBSR /VSSUT,Burla /NIT,Rourkela/IIT,BBSR/PMEC,Berhampur at his own cost)
Construction of Under Ground RESERVOIR (Construction of 50,000 LTR RCC UGR) Supplying of all labour,T&P, material including taxes , testing ,supply of design, drawing , construction,errection,testing & commissioning etc. of RCC Under ground reservoir of 50,000 ltrs capacity Cylindrical Container with circular dome, full raft using CC M-25 , with PCC layers as per approved drawing,supplying, fitting & fixing of 100 mm dia medium grade GI pipe Tata/Jindal/Sail/Nezone make confirming to IS specification of required length from PW to UGR & UGR to rising main including in-let,out-let,over flow & washing line of UGR, and use of aluminium ladder inside the OGR,CI puddle collar,0.6 m dia CI manhole cover at dome(2 Nos.) , RCC vent with brass jally,l,water level indicator etc. complete as per direction of the Engineer - in- Charge. (The contractor is to approve all structural design & drawing from State Technical Agency IGIT,Saranga /CET,BBSR/VSS UT,Burla /NIT,Rourkela /IIT,BBSR/PMEC,Berhampur at his own cost)
The contractor shall maintain the PWS Project for five ( 5 ) calender years from the completion date concurrent with defect liability period of one year in such a manner that all the house hold of the PWS Scheme covered area will get ( adepuate ) required quantity of supply water taking supply hour as 8 hour / day without facing any problems. The contractor shall repair and replace any types of defect arise within 24 Hrs of receipt of complain either from public or from Department. The contractor shall maintain all structure of the PWS Schemes as per terms and conditions of DTCN & Technical spacification mentioned (As per Annexure)
Supplying Labour, Materials and T&P for . Laying of pipe lines, Construction of valve chamber ,construction of compound wall ,pumping unit instaltion , Standpost, 50 KL Capacity RCC UGR, Providing 100% FHTC etc. With 5 years operation & maintenance in connection with PWS to Kaluabadi under Ganjam Block.
Supplying all materials labour T&P for construction of Compound wall .Laying, testing and commissioning of Rising main & Distribution system pipe line such as UPVC,HDPE,ASTM, G.I /CI pipes line etc along with required fittings & specials and construction of valve chamber,stand post, bore well platform,recharge pit,individual house hold connection, Drinking Water supply provision to School / AWC / G.P. Office, installation of submersible pump with motor in deep Tube well etc.as per detail scope of work & technical specification, quantity of work mention in Schedule-I in DTCN and in ( Annexure-A to C). Materials as required shall be supplied by the Contractor as per terms and condition of DTCN & all dimensions are as per Schedule-I in DTCN and as per direction of Engineer in Charge . All work shall be completed in such a manner that all house hold of entire village will get required quantity of drinking water with residual head of 7m without any likage in the entire PWS system as per direction of Engineer-in-charge.
Construction of Under Ground RESERVOIR (Construction of 50,000 LTR RCC UGR) Supplying of all labour,T&P, material including taxes , testing ,supply of design, drawing , construction,errection,testing & commissioning etc. of RCC Under ground reservoir of 50,000 ltrs capacity Cylindrical Container with circular dome, full raft using CC M-25 , with PCC layers as per approved drawing,supplying, fitting & fixing of 100 mm dia medium grade GI pipe Tata/Jindal/Sail/Nezone make confirming to IS specification of required length from PW to UGR & UGR to rising main including in-let,out-let,over flow & washing line of UGR, and use of aluminium ladder inside the OGR,CI puddle collar,0.6 m dia CI manhole cover at dome(2 Nos.) , RCC vent with brass jally,l,water level indicator etc. complete as per direction of the Engineer - in- Charge. (The contractor is to approve all structural design & drawing from State Technical Agency IGIT,Saranga /CET,BBSR/VSS UT,Burla /NIT,Rourkela /IIT,BBSR/PMEC,Berhampur at his own cost)
The contractor shall maintain the PWS Project for five ( 5 ) calender years from the completion date concurrent with defect liability period of one year in such a manner that all the house hold of the PWS Scheme covered area will get ( adepuate ) required quantity of supply water taking supply hour as 8 hour / day without facing any problems. The contractor shall repair and replace any types of defect arise within 24 Hrs of receipt of complain either from public or from Department. The contractor shall maintain all structure of the PWS Schemes as per terms and conditions of DTCN & Technical spacification mentioned (As per Annexure-G& H)
Tapan Kumar Sahoo
DEBENDRA KUMAR DASH
Rabindra Sahu
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.54 MB
BOQ_394600.xls
BOQ • 0.29 MB
A05DTCNRamachandrapur.pdf
Tender Documents • 1.47 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .