Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 2 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
Tender Value
₹1 Cr
EMD Value
₹1.8 L
Closing Date
1 Dec 2025, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Collector Latur
Collector Office Latur
Providing Vehicle on Rent Basis
2025_COLAT_1251357_1
2025/ZPPS/Election/04
Open Tender
Miscellaneous Services
Item Rate
365 days
Collector Office Latur
Please refer Tender documents.
2 documents required · 2 mandatory
₹21,240
₹1.8 L
Yes
22 Jan 2026
24 Nov 2025
3 Dec 2025
24 Nov 2025
1 Dec 2025
24 Nov 2025
Select, Excess (+), Less (-) Less (-)
Tender Inviting Authority: Collector, Latur
Name of Work: लातूर जिल्हयातील जिल्हा परिषद / पंचायत समिती सार्वत्रिक निवडणूक 2025 च्या संपुर्ण प्रक्रिये दरम्यान वाहन पुरवठा करणे बाबत.
Contract No: 2025/Election/E-Tender/Vehicle
Name of the Bidder/ Bidding Firm / Company :
Sl. No. Item Description Item Code / Make Quantity Units Estimated Rate Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency BASIC RATE In Figures To be entered by the Bidder Rs. P Excise Duty VAT Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category TOTAL AMOUNT Without Taxes TOTAL AMOUNT With Taxes TOTAL AMOUNT In Words
1 टॅक्सी कार(4+1) आसनी अवातानुकुलीत 12 तास/120 किमी (अंदाजीत लागणारी संख्या 48) 1 1 प्रती गाडी दर 0 Excess(+) Full Conversion INR 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
2 टॅक्सी कार(4+1) आसनी अवातानुकुलीत 24 तास/200 किमी (अंदाजीत लागणारी संख्या 48) 2 1 प्रती गाडी दर 0 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
3 टॅक्सी कार(4+1) आसनी अवातानुकुलीत एक महिन्याकरिता/2000 किमी( 12 तास)(अंदाजीत लागणारी संख्या 48) 3 1 प्रती गाडी दर 0 Excess(+) Full Conversion INR 2 Construction of chamber for 100mm sluices valve item3 10 Nos
4 टॅक्सी कार(4+1) आसनी अवातानुकुलीत अतिरीक्त प्रती तास (अंदाजीत लागणारी संख्या 48) 4 1 प्रती तास दर 0 Excess(+) Full Conversion INR 3 Supplying, Conveying and fixing spls. Including ea item4 10 Nos
5 टॅक्सी कार(4+1) आसनी अवातानुकुलीत अतिरीक्त प्रती किमी (अंदाजीत लागणारी संख्या 48) 5 1 प्रती किमी दर 0 Excess(+) Full Conversion INR 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
6 टॅक्सी कार(4+1) आसनी वातानुकुलीत 12 तास/120 किमी (अंदाजीत लागणारी संख्या 48) 6 1 प्रती गाडी दर 0 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
7 टॅक्सी कार(4+1) आसनी वातानुकुलीत 24 तास/200 किमी (अंदाजीत लागणारी संख्या 48) 7 1 प्रती गाडी दर 0 Excess(+) Full Conversion INR 2 Construction of chamber for 100mm sluices valve item3 10 Nos
8 टॅक्सी कार(4+1) आसनी वातानुकुलीत एक महिन्याकरिता/2000 किमी( 12 तास)(अंदाजीत लागणारी संख्या 48) 8 1 प्रती गाडी दर 0 Excess(+) Full Conversion INR 3 Supplying, Conveying and fixing spls. Including ea item4 10 Nos
9 टॅक्सी कार(4+1) आसनी वातानुकुलीत अतिरीक्त प्रती तास (अंदाजीत लागणारी संख्या 48) 9 1 प्रती तास दर 0 Excess(+) Full Conversion INR 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
10 टॅक्सी कार(4+1) आसनी वातानुकुलीत अतिरीक्त प्रती किमी (अंदाजीत लागणारी संख्या 48) 10 1 प्रती किमी दर 0 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
11 इनोव्हा क्रेस्टा वातानुकुलीत 12 तास/120 किमी (अंदाजीत लागणारी संख्या 18) 11 1 प्रती गाडी दर 0 Excess(+) Full Conversion INR 2 Construction of chamber for 100mm sluices valve item3 10 Nos
12 इनोव्हा क्रेस्टा वातानुकुलीत 24 तास/200 किमी (अंदाजीत लागणारी संख्या 18) 12 1 प्रती गाडी दर 0 Excess(+) Full Conversion INR 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
13 इनोव्हा क्रेस्टा वातानुकुलीत एक महिन्याकरिता / 2000 किमी( 12 तास) (अंदाजीत लागणारी संख्या 18) 13 1 प्रती गाडी दर 0 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
14 इनोव्हा क्रेस्टा वातानुकुलीत अतिरीक्त प्रती तास (अंदाजीत लागणारी संख्या 18) 14 1 प्रती तास दर 0 Excess(+) Full Conversion INR 2 Construction of chamber for 100mm sluices valve item3 10 Nos
15 इनोव्हा क्रेस्टा वातानुकुलीत अतिरीक्त प्रती किमी (अंदाजीत लागणारी संख्या 18) 15 1 प्रती किमी दर 0 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
16 जीप(सुमो,टेम्पो,टवेरा,टॅक्स,इको,टॅक्सी) (6+1) आसनी वातानुकुलीत 12 तास/120 किमी (अंदाजीत लागणारी संख्या 240) 16 1 प्रती गाडी दर 0 Excess(+) Full Conversion INR 2 Construction of chamber for 100mm sluices valve item3 10 Nos
17 जीप(सुमो,टेम्पो,टवेरा,टॅक्स,इको,टॅक्सी) (6+1) आसनी वातानुकुलीत 24 तास/200 किमी (अंदाजीत लागणारी संख्या 240) 17 1 प्रती गाडी दर 0 Excess(+) Full Conversion INR 3 Supplying, Conveying and fixing spls. Including ea item4 10 Nos
18 जीप (सुमो,टेम्पो,टवेरा,टॅक्स,इको,टॅक्सी) (6+1) आसनी वातानुकुलीत एक महिन्याकरिता / 2000 किमी (मासिक-2000 किमी) (12 तास प्रतिदिन) (अंदाजीत लागणारी संख्या 180) 18 1 प्रती गाडी दर 0 Excess(+) Full Conversion INR 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
19 जीप(सुमो,टेम्पो,टवेरा,टॅक्स,इको,टॅक्सी) (6+1) आसनी वातानुकुलीत अतिरीक्त प्रती तास (अंदाजीत लागणारी संख्या 180) 19 1 प्रती तास दर 0 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
20 जीप(सुमो,टेम्पो,टवेरा,टॅक्स,इको,टॅक्सी) (5+1) व (6+1) आसनी वातानुकुलीत अतिरीक्त प्रती किमी (अंदाजीत लागणारी संख्या 180) 20 1 प्रती किमी दर 0 Excess(+) Full Conversion INR 2 Construction of chamber for 100mm sluices valve item3 10 Nos
21 जीप(सुमो,टेम्पो,टवेरा,टॅक्स,इको,टॅक्सी) (6+1) आसनी अवातानुकुलीत 12 तास/120 किमी (अंदाजीत लागणारी संख्या 240) 21 1 प्रती गाडी दर 0 Excess(+) Full Conversion INR 3 Supplying, Conveying and fixing spls. Including ea item4 10 Nos
22 जीप(सुमो,टेम्पो,टवेरा,टॅक्स,इको,टॅक्सी) (6+1) आसनी अवातानुकुलीत 24 तास/200 किमी (अंदाजीत लागणारी संख्या 240) 22 1 प्रती गाडी दर 0 Excess(+) Full Conversion INR 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
23 जीप(सुमो,टेम्पो,टवेरा,टॅक्स,इको,टॅक्सी) (6+1) आसनी अवातानुकुलीत एक महिन्याकरिता/2000 किमी(मासिक-2000 किमी)(12 तास प्रतिदिन)(अंदाजीत लागणारी संख्या 180) 23 1 प्रती गाडी दर 0 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
24 जीप(सुमो,टेम्पो,टवेरा,टॅक्स,इको,टॅक्सी) (6+1) आसनी अवातानुकुलीत अतिरीक्त प्रती तास (अंदाजीत लागणारी संख्या 180) 24 1 प्रती तास दर 0 Excess(+) Full Conversion INR 2 Construction of chamber for 100mm sluices valve item3 10 Nos
25 जीप(सुमो,टेम्पो,टवेरा,टॅक्स,इको,टॅक्सी) (6+1) आसनी अवातानुकुलीत अतिरीक्त प्रती किमी (अंदाजीत लागणारी संख्या 180) 25 1 प्रती किमी दर 0 Excess(+) Full Conversion INR 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
26 प्रवासी बस 20 ते 25 आसनी अवातानुकुलीत 24 तास/200 किमी (अंदाजीत लागणारी संख्या 180) 26 1 प्रती गाडी दर 0 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
27 प्रवासी बस 20 ते 25 आसनी अवातानुकुलीत अतिरीक्त प्रती तास (अंदाजीत लागणारी संख्या 180) 27 1 प्रती तास दर 0 Excess(+) Full Conversion INR 2 Construction of chamber for 100mm sluices valve item3 10 Nos
28 प्रवासी बस 20 ते 25 आसनी अवातानुकुलीत अतिरीक्त प्रती किमी (अंदाजीत लागणारी संख्या 180) 28 1 प्रती किमी दर 0 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
29 प्रवासी बस 30 ते 35 आसनी अवातानुकुलीत 24 तास/200 किमी (अंदाजीत लागणारी संख्या 180) 29 1 प्रती गाडी दर 0 Excess(+) Full Conversion INR 2 Construction of chamber for 100mm sluices valve item3 10 Nos
30 प्रवासी बस 30 ते 35 आसनी अवातानुकुलीत अतिरीक्त प्रती तास (अंदाजीत लागणारी संख्या 180) 30 1 प्रती तास दर 0 Excess(+) Full Conversion INR 3 Supplying, Conveying and fixing spls. Including ea item4 10 Nos
31 प्रवासी बस 30 ते 35 आसनी अवातानुकुलीत अतिरीक्त प्रती किमी (अंदाजीत लागणारी संख्या 180) 31 1 प्रती किमी दर 0 Excess(+) Full Conversion INR 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
32 प्रवासी बस 44 ते 50 आसनी अवातानुकुलीत 24 तास/200 किमी (अंदाजीत लागणारी संख्या 240) 32 1 प्रती गाडी दर 0 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
33 प्रवासी बस 44 ते 50 आसनी अवातानुकुलीत अतिरीक्त प्रती तास (अंदाजीत लागणारी संख्या 240) 33 1 प्रती तास दर 0 Excess(+) Full Conversion INR 2 Construction of chamber for 100mm sluices valve item3 10 Nos
34 प्रवासी बस 44 ते 50 आसनी अवातानुकुलीत अतिरीक्त प्रती किमी (अंदाजीत लागणारी संख्या 240) 34 1 प्रती किमी दर 0 Excess(+) Full Conversion INR 3 Supplying, Conveying and fixing spls. Including ea item4 10 Nos
35 700 ते 800 किलो क्षमता असलेली छोटी मालवाहतुक करणारी वाहने(छोटा टेम्पो)12 तास/120 किमी (अंदाजीत लागणारी संख्या 24) 35 1 प्रती गाडी दर 0 Excess(+) Full Conversion INR 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
36 700 ते 800 किलो क्षमता असलेली छोटी मालवाहतुक करणारी वाहने(छोटा टेम्पो)24 तास/200 किमी(अंदाजीत लागणारी संख्या 24) 36 1 प्रती गाडी दर 0 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
37 700 ते 800 किलो क्षमता असलेली छोटी मालवाहतुक करणारी वाहने(छोटा टेम्पो)अतिरीक्त प्रती तास (अंदाजीत लागणारी संख्या 24) 37 1 प्रती तास दर 0 Excess(+) Full Conversion INR 2 Construction of chamber for 100mm sluices valve item3 10 Nos
38 700 ते 800 किलो क्षमता असलेली छोटी मालवाहतुक करणारी वाहने(छोटा टेम्पो)अतिरीक्त प्रती किमी (अंदाजीत लागणारी संख्या 24) 38 1 प्रती किमी दर 0 Excess(+) Full Conversion INR 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
39 टेम्पो(एल.एम.व्ही.)12 तास/120 किमी (अंदाजीत लागणारी संख्या 24) 39 1 प्रती गाडी दर 0 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
40 टेम्पो(एल.एम.व्ही.)24 तास/200 किमी (अंदाजीत लागणारी संख्या 24) 40 1 प्रती गाडी दर 0 Excess(+) Full Conversion INR 2 Construction of chamber for 100mm sluices valve item3 10 Nos
41 टेम्पो(एल.एम.व्ही.)अतिरीक्त प्रती तास (अंदाजीत लागणारी संख्या 24) 41 1 प्रती तास दर 0 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
42 टेम्पो(एल.एम.व्ही.)अतिरीक्त प्रती किमी (अंदाजीत लागणारी संख्या 24) 42 1 प्रती किमी दर 0 Excess(+) Full Conversion INR 2 Construction of chamber for 100mm sluices valve item3 10 Nos
43 ट्रक (एम.जी.व्ही.)12 तास/120 किमी (अंदाजीत लागणारी संख्या 24) 43 1 प्रती गाडी दर 0 Excess(+) Full Conversion INR 3 Supplying, Conveying and fixing spls. Including ea item4 10 Nos
44 ट्रक ((एम.जी.व्ही.)24 तास/200 किमी (अंदाजीत लागणारी संख्या 24) 44 1 प्रती गाडी दर 0 Excess(+) Full Conversion INR 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
45 ट्रक (एम.जी.व्ही.)अतिरीक्त प्रती तास (अंदाजीत लागणारी संख्या 24) 45 1 प्रती तास दर 0 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
46 ट्रक (एम.जी.व्ही.)अतिरीक्त प्रती किमी(अंदाजीत लागणारी संख्या 24) 46 1 प्रती किमी दर 0 Excess(+) Full Conversion INR 2 Construction of chamber for 100mm sluices valve item3 10 Nos
47 ट्रक (एच.जी.व्ही.)12 तास/120 किमी (अंदाजीत लागणारी संख्या 06) 47 1 प्रती गाडी दर 0 Excess(+) Full Conversion INR 3 Supplying, Conveying and fixing spls. Including ea item4 10 Nos
48 ट्रक ((एच.जी.व्ही.)24 तास/200 किमी (अंदाजीत लागणारी संख्या 06) 48 1 प्रती गाडी दर 0 Excess(+) Full Conversion INR 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
49 ट्रक (एच.जी.व्ही.)अतिरीक्त प्रती तास (अंदाजीत लागणारी संख्या 06) 49 1 प्रती तास दर 0 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
50 ट्रक (एच.जी.व्ही.)अतिरीक्त प्रती किमी (अंदाजीत लागणारी संख्या 06) 50 1 प्रती किमी दर 0 Excess(+) Full Conversion INR 2 Construction of chamber for 100mm sluices valve item3 10 Nos
Total in Figures 4 Construction of chamber for 100mm sluice plates item5 10 Nos
Quoted Rate in Figures Select
Quoted Rate in Words
stage.html
html • 0.02 MB
cancelled_1.pdf
pdf • 0.69 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 12.12 MB
BOQ_2157598.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .