| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.8 LAccepted-AOC | L1 | Accepted-AOC Workorder issued to M/s Thirupathy Industries(PAVITHRAN J ) on 09.11.18.But they didnot start the work.Hence, M/s Thirupathy Industries has been blacklisted for 5 years | |
| 2 | L2₹14.2 L+₹4.2 L (42.3%)Rejected-Finance | L2 | Rejected-Finance BEING L2,REJECTED | |
| 3 | Not Admitted-Fee/PreQual/Technical PLOT NO B 24 H BLOCK LAL TOPI NAGAR COURT TOAD MORWADI MIDC PIMPRI PUNE PUNE MAHARASHTRA 411018 | PUNE | MAHARASHTRA | 411018 | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification | |
| 4 | Not Admitted-Fee/PreQual/Technical A 402 SUPER STEAM BOILER ENGINEERS PVT LTD TTC INDUSTRIAL AREA MIDC MAHAPE THANE MAHARASHTRA 400710 | THANE | MAHARASHTRA | 400710 | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
Refer Docs
EMD Value
₹17,500
Closing Date
17 Sept 2018, 3:00 pmClosed
MANAGING DIRECTOR
KSDPLTD,KALAVOOR P.O,ALAPPUZHA
SUPPLY, ERECTION, COMMISSIONING AND VALIDATION OF BOILER CHIMNEY for Non Betalactam Project as per the tender schedule and BOQ/drawing attached herein.
2018_ksdp_230814_1
KSDP/PRJ/NONBETA/BOILERCHIMNEY /08/18-19/43
Open Tender
Electrical and Maintenance Works
Item Rate
30 days
KSDPLTD, KALAVOOR P.O
Original Manufacturers/contractors having a place of business in any of the States of India with at least 5 years consistent standing in the field.
11 documents required · 11 mandatory
₹1,652
Yes
online
₹17,500
Yes
3 Feb 2020
4 Sept 2018
19 Sept 2018
4 Sept 2018
17 Sept 2018
4 Sept 2018
4 Sept 2018 - 17 Sept 2018
Amount
SUPPLY,ERECTION, COMMISSIONING AND VALIDATION OF BOILER CHIMNEY
Civil work for the Foundation of Chimney as per BoQ2
Supply,Fabrication and erection of 450mm dia chimney ht of 25 m (guy rope supported 2 sets)made of 6mm MS sheet for first 10m section and 5mm thick for second 10m and 4mm thick for third 5m section including support etc provided with flue gas opening on the chimney at required height and suitable ducting for 2 boilers as per the URS attached.
Description of Work / Item(s)
Civil work for the Foundation of Chimney
Earth work in excavation by mechanical means /manual means in foundation trenches including dressing of sides and ramming of bottoms, lift up to 2.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed within a lead of 150m. The work including shoring,dewatering etc
Cement concrete 1:4:8 using 40mm hard granite broken stone in lines and levels including cost & conveyance of all materials, all labour charges, hire charges of all tools & plants and hire charges of form work, charges for curing etc. complete as directed by the officers concerned.
Centering and shuttering including strutting,propping etc. and removal of form work for foundation,footings,bases of columns etc. for mass concrete. complete as directed by the officers concerned.
Providing and laying in position specified grade of RCC excluding the cost of centering, shuttering,finishing,reinforcement All work upto plinth level:complete as directed by the officers concerned.1:1.5:3(1 cement : 1.5 coarse sand(Zone-III) : 3 graded stone aggregate 20 mm nominal size).
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete.Thermo Mechanically treated bars of grade Fe 500 D or more and complete as directed by the officers concerned.
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 150 m and lift up to 1.5 m.
Plastering work in cement motar12 mm thick finished with a floating coat of neat cement of mix 1:4 (1 cement: 4 fine sand)
Fixing company free issued bolts including nuts and washers,including all labour charges, hire charges of all tools and plants etc. complete as directed by the officers concerned.
Devi Engineering Works
Devi Engineering Works
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .