Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.6 LAccepted-AOC | L1 | Accepted-AOC Approved all bidders as per committee resolution number 2(3) dated 12/09/2025 | |
| 2 | L2₹6.8 L+₹13,554 (2.04%)Rejected-Finance | L2 | Rejected-Finance President, secretary and committee members As per committee resolution number 2(3) dated 12/09/2025 |
| Sl No | Description | Qty | Unit | STAR BRICKS AND TILES L1 | SATHEESH KUMAR K K L2 |
|---|---|---|---|---|---|
| 1.00Side protection | |||||
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 57.74 | cum | 252.48 ₹14,577.44 Lowest | 257.63 ₹14,874.78 |
| 1.00 | 50.2.3.1:Pumping or Bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete | 64 | hour | 338.63 ₹21,672.32 Lowest | 345.54 ₹22,114.56 |
| 1.00 | OD212876/2025-2026:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with department rubble including packing to compactness to lines and levels cost and conveyance
of all materials labour charges etc. complete as per direction of Departmental officers at site | 76.73 | cum | 1,681.56 ₹1,29,031.14 Lowest | 1,715.88 ₹1,31,664.62 |
| 1.00 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 47.55 | sqm | 378.44 ₹17,994.82 Lowest | 386.16 ₹18,361.91 |
| 1.00 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 252.45 | kilogram | 110.18 ₹27,814.94 Lowest | 112.43 ₹28,382.95 |
| 1.01 | 5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 2.29 | cum | 9,764.65 ₹22,341.52 Lowest | 9,963.93 ₹22,797.47 |
| 1.01 | 51.2.3:Filling with Quarry Muck <br> Filling up low lying and water logged areas with local material/ quarry muck, spreading in layers, leveling the top at site and consolidation by ramming, etc complete for improving the CBR value of subgrade | 4.28 | cum | 891.38 ₹3,814.22 Lowest | 909.57 ₹3,892.05 |
| 1.01 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 9.73 | cum | 9,051.25 ₹88,050.56 Lowest | 9,235.97 ₹89,847.52 |
| 1.01 | 5.2.2:Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 1.92 | cum | 12,516.74 ₹24,032.14 Lowest | 12,772.18 ₹24,522.59 |
Tender Value
₹6.8 L
EMD Value
₹16,942
Closing Date
29 Aug 2025, 5:00 pmClosed
SHEHANA C A
ASSISTANT ENGINEER OKKAL GRAMA PANCHAYAT OKKAL
108/25-26 Renovation of Karikulam-Renovation of Karimkulam in ward 2
2025_LSGD_788934_1
12/AE/LSGD/OKL/25-26
Open Tender
Civil Works - Others
Item Rate
240 days
OKKAL
108/25-26 Renovation
of Karikulam-Renovation of Karimkulam in ward 2
7 documents required · 7 mandatory
₹1,495
₹16,942
27 Oct 2025
20 Aug 2025
2 Sept 2025
20 Aug 2025
29 Aug 2025
20 Aug 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .