| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.2 LAccepted-AOC | ₹2.2 L | 1 | Accepted-AOC L1 |
| 2 | 2₹2.4 LRejected-AOC | ₹2.4 L | 2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | VARKEY ITTVIARAN KOMBATHAN L2 | SUNEESH P S L1 |
|---|---|---|---|---|---|
| 1.00App A | |||||
| 1.00 | OD5145/2025-2026:Providing and placing empty cement bags filled with available earth/clay including all labour charges | 10 | each | 34.73 ₹347.30 | 32.06 ₹320.60 |
| 1.00 | 2.28.1:Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m.All kinds of soil | 66.7 | sqm | 33.31 ₹2,221.78 | 30.74 ₹2,050.36 |
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 8.7 | cum | 243.2 ₹2,115.84 | 224.42 ₹1,952.45 |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 5.8 | cum | 7,488.64 ₹43,434.11 | 6,910.34 ₹40,079.97 |
| 1.00 | 4.3.2:Centering and shuttering including strutting, propping etc. and removal of form work for:Retaining walls, return walls, (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc. | 48.78 | sqm | 792.58 ₹38,662.05 | 731.38 ₹35,676.72 |
| 1.01 | 50.13.1:9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete | 118 | sqm | 324.53 ₹38,294.54 | 299.89 ₹35,387.02 |
| 1.01 | 4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | 5 | cum | 8,089.26 ₹40,470.57 | 7,464.45 ₹37,344.64 |
| 1.01 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 7.47 | cum | 8,718.75 ₹65,129.06 | 8,044.6 ₹60,093.16 |
| 1.01 | OD30564/2025-2026:supplying wire mesh ( 50mmx50mm ) | 45.9 | per sqm | 278.79 ₹12,796.46 | 257.23 ₹11,806.86 |
Tender Value
₹2.6 L
EMD Value
₹6,448
Closing Date
14 Nov 2025, 1:00 pmClosed
Geordie VG
Assistant Executive Engineer, P.V.I.P Sub. Division No.1, Bhoothathankettu, Kothamangalam
PVIP-Urgent rectification work for preventing the leakage of Mathirappilly MD
2025_Irrig_819602_1
IRR/PII/TR/2966/2025
Open Tender
Civil Works - Canal
180 days
Kothamangalam
Please refer Tender documents.
8 documents required · 8 mandatory
₹570
Yes
₹6,448
Yes
31 Dec 2025
6 Nov 2025
15 Nov 2025
6 Nov 2025
14 Nov 2025
6 Nov 2025
Amount
OD5145/2025-2026:Providing and placing empty cement bags filled with available earth/clay including all labour charges
2.28.1:Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m.All kinds of soil
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources)
4.3.2:Centering and shuttering including strutting, propping etc. and removal of form work for:Retaining walls, return walls, (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc.
50.13.1:9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete
4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources)
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
OD30564/2025-2026:supplying wire mesh ( 50mmx50mm )
VARKEY ITTVIARAN KOMBATHAN (BID ID -2438718)
Bidder Name
VARKEY ITTVIARAN KOMBATHAN
SUNEESH P S
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1373938.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
BOQ_1373938.xls
BOQ • 0.30 MB
viewsbd2966.pdf
Tender Documents • 2.16 MB
Download all tender documents and submit your bid