| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.3 LAccepted-AOC KUDLU PO KASARAGOD | KASARAGOD | KASARAGOD | KERALA | 671124 | L1 | Accepted-AOC Agreement executed | |
| 2 | L2₹8.7 L+₹36,419.01 (4.39%)Rejected-AOC | L2 | Rejected-AOC Rejected | |
| 3 | L3₹9.0 L+₹68,340.99 (8.24%)Rejected-Finance | L3 | Rejected-Finance Higher amount quoted | |
| 4 | L4₹9.2 L+₹90,210.10 (10.9%)Rejected-Finance | L4 | Rejected-Finance Higher amount quoted |
| Sl No | Description | Qty | Unit | SANEESH SD L4 | ABDUL KHADER SHEHEEM L2 | Santhosh Kumar K.V. L3 | ABDUL RAHIMAN MASHOOD B I L1 |
|---|---|---|---|---|---|---|---|
| 1.00Compound wall | |||||||
| 1.00 | 2.7.1:Earth work in excavation by mechanical means (Hydraulic excavator )/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.Ordinary rock | 53.13 | cum | 413.4 ₹21,963.94 | 389.15 ₹20,675.54 | 430 ₹22,845.9 | 372.78 ₹19,805.8 Lowest |
| 1.00 | 7.1.1:Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand) | 18.23 | cum | 6,659.7 ₹1,21,373.03 | 6,269.63 ₹1,14,264.01 | 6,100 ₹1,11,172.5 | 6,006 ₹1,09,459.35 Lowest |
| 1.00 | 7.2.1:Random rubble masonry with hard stone in superstructure above plinth level and upto floor five level, including leveling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) at window sills, ceiling level and the like.Cement mortar 1:6 (1 cement : 6 coarse sand) | 13.5 | cum | 8,283.5 ₹1,11,827.25 | 7,798.28 ₹1,05,276.78 | 8,100 ₹1,09,350 | 7,470.37 ₹1,00,850 Lowest |
| 1.00 | 50.6.7.2:Laterate masonry with neatly dressed laterate stone of size 40x20x15cm or nearest size in cement mortar 1:6 for super structure above plinth level up to floor two level including all cost of materials, labour charges etc. | 21.6 | cum | 7,212.5 ₹1,55,790 | 6,790.04 ₹1,46,664.86 | 6,500 ₹1,40,400 Lowest | 6,504.53 ₹1,40,497.85 |
| 1.00 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | 0.82 | cum | 8,372 ₹6,831.55 | 7,881.68 ₹6,431.45 | 9,300 ₹7,588.8 | 7,550.27 ₹6,161.02 Lowest |
| 1.01 | 5.2.2:Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 0.64 | cum | 10,194.6 ₹6,524.54 | 9,597.53 ₹6,142.42 | 9,900 ₹6,336 | 9,193.97 ₹5,884.14 Lowest |
| 1.01 | 5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts | 9.52 | sqm | 805 ₹7,663.6 | 757.86 ₹7,214.83 | 850 ₹8,092 | 726 ₹6,911.52 Lowest |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 81.6 | kilogram | 89.7 ₹7,319.52 | 84.48 ₹6,893.57 | 81 ₹6,609.6 | 80.92 ₹6,603.07 Lowest |
| 1.01 | 5.22A.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete above plinth level.Thermo - Mechanically Treated bars of grade Fe-500D or more | 64 | kg | 89.7 ₹5,740.8 | 84.48 ₹5,406.72 | 81 ₹5,184 | 80.92 ₹5,178.88 Lowest |
Tender Value
₹10.6 L
EMD Value
₹26,463
Closing Date
7 Aug 2025, 6:00 pmClosed
Assistant Executive Engineer
Office of the Assistant Executive Engineer, PWD Building Subdiv ision, Koyilandy
Construction of Compound wall-- Renovation work
2025_PWD_782026_1
PWD/2025-26/D1/BSDKYL/12
Open Tender
Civil Works - Buildings
Item Rate
90 days
Vadakara
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
Yes
₹26,463
Yes
17 Oct 2025
2 Aug 2025
11 Aug 2025
2 Aug 2025
7 Aug 2025
2 Aug 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1282717.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .