Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.1 LAccepted-AOC K K HOUSE PANMANA | L1 | Accepted-AOC L1 | |
| 2 | L2₹9.9 L+₹87,193.20 (9.61%)Rejected-Finance | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | ALTHAF M L1 | SALIM MOHAMMED KUNJU L2 |
|---|---|---|---|---|---|
| 1.00side wall | |||||
| 1.00 | 15.9.1:Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In Lime Mortar | 28.62 | cum | 1,070 ₹30,623.4 Lowest | 1,172.19 ₹33,548.08 |
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 87.98 | cum | 230 ₹20,235.4 Lowest | 252.22 ₹22,190.32 |
| 1.00 | 50.2.3.1:Pumping or Bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete | 42 | hour | 309 ₹12,978 Lowest | 338.28 ₹14,207.76 |
| 1.00 | OD233809/2025-2026:Dry rubble masonry with hard stone in foundation and plinth (Stone Departmental supply) | 22.62 | cum | 2,963 ₹67,023.06 Lowest | 3,246.25 ₹73,430.18 |
| 1.00 | OD233810/2025-2026:Dry rubble masonry with hard stone in foundation and plinth | 69.6 | cum | 5,211 ₹3,62,685.6 Lowest | 5,709.61 ₹3,97,388.86 |
| 1.01 | 7.1.1:Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand) | 34.98 | cum | 7,455 ₹2,60,775.9 Lowest | 8,168.28 ₹2,85,726.43 |
| 1.01 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | 7.19 | cum | 9,372 ₹67,384.68 Lowest | 10,268.51 ₹73,830.59 |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 689 | kilogram | 100 ₹68,900 Lowest | 110.07 ₹75,838.23 |
| 1.01 | 4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | 33.2 | sqm | 345 ₹11,454 Lowest | 378.05 ₹12,551.26 |
Tender Value
₹10.2 L
EMD Value
₹25,407
Closing Date
6 Oct 2025, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Municipal Engineer
Karunagappally Municipality
SO362/2025-26 SIDE PROTECTION OF METHARANGE THARAYIL THAZHATHODE DIVISION11
2025_LSGD_803673_14
3267685-2025
Open Tender
Civil Works - Roads
Item Rate
180 days
Karunagappally Municipality
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
Yes
₹25,407
Yes
24 Nov 2025
29 Sept 2025
7 Oct 2025
29 Sept 2025
6 Oct 2025
29 Sept 2025
29 Sept 2025 - 6 Oct 2025
Amount
side wall
15.9.1:Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In Lime Mortar
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil
50.2.3.1:Pumping or Bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete
OD233809/2025-2026:Dry rubble masonry with hard stone in foundation and plinth (Stone Departmental supply)
OD233810/2025-2026:Dry rubble masonry with hard stone in foundation and plinth
7.1.1:Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand)
5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources)
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform
SALIM MOHAMMED KUNJU (BID ID -2374919)
Bidder Name
SALIM MOHAMMED KUNJU
ALTHAF M
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .