| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.9 CrAccepted-AOC | ₹3.9 Cr Quoted ₹4.0 Cr | L1 | Accepted-AOC Lowest Bidder |
| 2 | L2₹4.3 Cr+₹23.0 L (5.69%)Rejected-Finance | ₹4.3 Cr+₹23.0 L (5.69%) | L2 | Rejected-Finance Second Lowest Bidder |
| Sl No | Description | Qty | Unit | Prathiba Developers (P) Ltd. L1 | K.V ANIL KUMAR L2 |
|---|---|---|---|---|---|
| 1.00SH : EARTHWORK | |||||
| 1.01 | Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared. | 1,455 | sqm | 20 ₹29,100 | 10 ₹14,550 Lowest |
| 1.02 | Earth work in excavation by means (Hydraulic excavator)/ manual means over areas (exceeding 30cm in depth 1.5m in width as well as 10 sqm on plan) including disposal of excavated earth, dewatering, lift upto 1.5m and all leads; disposal of earth outside the periphery of the area, disposed earth to be levelled and neatly dressed as directed by the Engineer-in-Charge-All kinds of soil. | 276 | cum | 500 ₹1,38,000 | 250 ₹69,000 Lowest |
| 1.03 | Providing and applying Antitermite treatment by injecting chemical emulsion Imidacloprid emulsiable concentrate 0.075 percentage for pre-constructional treatment and creating a chemical barrier as per IS 6313 (Part II) 2001 for wall trenches, foundation, top surface of plinth filling, foundation of wall and floor, along the external perimeter of the building, etc. complete conforming to manufacturers specification and as directed by the Engineer-in-Charge. (Plinth area only to be measured for the payment ) | 254 | sqm | 150 ₹38,100 | 101 ₹25,654 Lowest |
| 1.04 | Filling in plinth or trenches, under floors, foundations, in areas etc with contractors own red earth including watering, ramming consolidating and dressing, cost and conveyance of all materials,labour charges,lead,lift etc complete at all levels as directed by the Engineer-in-Charge | 25 | cum | 800 ₹20,000 Lowest | 1,100 ₹27,500 |
| 1.05 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. | 215 | cum | 300 ₹64,500 Lowest | 450 ₹96,750 |
| 2.00SH : PILE WORK | |||||
| 2.01 | Boring, providing and installation bored cast-in-situ reinforced cement concrete piles of garde M-35 of specified diameter and length below pile cap, to carry a safe working load not less than specified, excluding the cost of steel reinforcement but including the cost of boring with bentonite solution and temporary casing of appropriate length for setting out and removal of same and the length of the pile to be embedded in the pile cap,pile chipping etc. by Crawler mounted, telescopic boom hydraulic pilling Rig all complete, including removal of excavated earth with all its lifts and leads (length of pile for payment shall be measured up to bottom of pile cap). Note : Minimum Cement content considered in M-35 is @420kg/ cum): 500 diameter pile | 247 | metre | 6,500 ₹16,05,500 Lowest | 6,500 ₹16,05,500 Lowest |
| 2.02 | Boring, providing and installation bored cast-in-situ reinforced cement concrete piles of garde M-35 of specified diameter and length below pile cap, to carry a safe working load not less than specified, excluding the cost of steel reinforcement but including the cost of boring with bentonite solution and temporary casing of appropriate length for setting out and removal of same and the length of the pile to be embedded in the pile cap,pile chipping etc. by Crawler mounted, telescopic boom hydraulic pilling Rig all complete, including removal of excavated earth with all its lifts and leads (length of pile for payment shall be measured up to bottom of pile cap). Note : Minimum Cement content considered in M-35 is @420kg/ cum): 600 mm diameter piles - | 190 | metre | 8,500 ₹16,15,000 | 6,900 ₹13,11,000 Lowest |
| 2.03 | Boring, providing and installation bored cast-in-situ reinforced cement concrete piles of garde M-35 of specified diameter and length below pile cap, to carry a safe working load not less than specified, excluding the cost of steel reinforcement but including the cost of boring with bentonite solution and temporary casing of appropriate length for setting out and removal of same and the length of the pile to be embedded in the pile cap,pile chipping etc. by Crawler mounted, telescopic boom hydraulic pilling Rig all complete, including removal of excavated earth with all its lifts and leads (length of pile for payment shall be measured up to bottom of pile cap). Note : Minimum Cement content considered in M-35 is @420 kg/ cum): 700 mm diameter piles - | 236 | metre | 9,500 ₹22,42,000 | 7,200 ₹16,99,200 Lowest |
Tender Value
₹3.5 Cr
EMD Value
₹7 L
Closing Date
23 Apr 2026, 3:00 pmClosed
EXECUTIVE CHAIRMAN
CIAL Infrastructures Ltd., Cochin International Airport Building, Kochi. Airport P.O., Nedumbassery, Ernakulam, Kerala
Construction of a Deep Water Rescue Training Pool at CIAL, including civil works, pool structure and waterproofing, filtration and treatment systems, pumps, piping, lighting, safety fixtures, and complete MEP services.
2026_CIL_847876_1
CIL/DWRTP/2025-26/08
Open Tender
Civil Works - Others
Item Rate
CIAL, NEDUMBASSERY
Please refer Tender documents.
8 documents required · 8 mandatory
₹1,180
₹7 L
NEDUMBASSERY
10 Sept 2026
17 Mar 2026
24 Apr 2026
17 Mar 2026
23 Apr 2026
1 Apr 2026
18 Mar 2026 - 25 Mar 2026
27 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1SH : EARTHWORK | |||||
| 1.01 | Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared. | 1,455 | sqm | - | - |
| 1.02 | Earth work in excavation by means (Hydraulic excavator)/ manual means over areas (exceeding 30cm in depth 1.5m in width as well as 10 sqm on plan) including disposal of excavated earth, dewatering, lift upto 1.5m and all leads; disposal of earth outside the periphery of the area, disposed earth to be levelled and neatly dressed as directed by the Engineer-in-Charge-All kinds of soil. | 276 | cum | - | - |
| 1.03 | Providing and applying Antitermite treatment by injecting chemical emulsion Imidacloprid emulsiable concentrate 0.075 percentage for pre-constructional treatment and creating a chemical barrier as per IS 6313 (Part II) 2001 for wall trenches, foundation, top surface of plinth filling, foundation of wall and floor, along the external perimeter of the building, etc. complete conforming to manufacturers specification and as directed by the Engineer-in-Charge. (Plinth area only to be measured for the payment ) | 254 | sqm | - | - |
| 1.04 | Filling in plinth or trenches, under floors, foundations, in areas etc with contractors own red earth including watering, ramming consolidating and dressing, cost and conveyance of all materials,labour charges,lead,lift etc complete at all levels as directed by the Engineer-in-Charge | 25 | cum | - | - |
| 1.05 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. | 215 | cum | - | - |
| 2SH : PILE WORK | |||||
| 2.01 | Boring, providing and installation bored cast-in-situ reinforced cement concrete piles of garde M-35 of specified diameter and length below pile cap, to carry a safe working load not less than specified, excluding the cost of steel reinforcement but including the cost of boring with bentonite solution and temporary casing of appropriate length for setting out and removal of same and the length of the pile to be embedded in the pile cap,pile chipping etc. by Crawler mounted, telescopic boom hydraulic pilling Rig all complete, including removal of excavated earth with all its lifts and leads (length of pile for payment shall be measured up to bottom of pile cap). Note : Minimum Cement content considered in M-35 is @420kg/ cum): 500 diameter pile | 247 | metre | - | - |
| 2.02 | Boring, providing and installation bored cast-in-situ reinforced cement concrete piles of garde M-35 of specified diameter and length below pile cap, to carry a safe working load not less than specified, excluding the cost of steel reinforcement but including the cost of boring with bentonite solution and temporary casing of appropriate length for setting out and removal of same and the length of the pile to be embedded in the pile cap,pile chipping etc. by Crawler mounted, telescopic boom hydraulic pilling Rig all complete, including removal of excavated earth with all its lifts and leads (length of pile for payment shall be measured up to bottom of pile cap). Note : Minimum Cement content considered in M-35 is @420kg/ cum): 600 mm diameter piles - | 190 | metre | - | - |
| 2.03 | Boring, providing and installation bored cast-in-situ reinforced cement concrete piles of garde M-35 of specified diameter and length below pile cap, to carry a safe working load not less than specified, excluding the cost of steel reinforcement but including the cost of boring with bentonite solution and temporary casing of appropriate length for setting out and removal of same and the length of the pile to be embedded in the pile cap,pile chipping etc. by Crawler mounted, telescopic boom hydraulic pilling Rig all complete, including removal of excavated earth with all its lifts and leads (length of pile for payment shall be measured up to bottom of pile cap). Note : Minimum Cement content considered in M-35 is @420 kg/ cum): 700 mm diameter piles - | 236 | metre | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.22 MB
BOQ_1433013.xls
BOQ • 0.56 MB
FINAL.pdf
Tender Documents • 6.90 MB
CorrigendumII.pdf
PDF • 0.11 MB
corrigendum1.pdf
PDF • 0.09 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .