Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹61.8 CrAdmitted-Finance B 1 NEELA APARTMENT MANDPESHWAR INDL PREMISES S V P ROAD BORIVALI WEST MUMBAI 400 092 | ₹61.8 Cr | L1 | Admitted-Finance |
| 2 | L2₹62.0 Cr+₹20.6 L (0.33%)Admitted-Finance 1 13 16 G KHAPARADEEH KOTHI CAMPUS CIVIL LINES AYODHYA UTTAR PRADESH 224001 | AYODHYA | AYODHYA | UTTAR PRADESH | 224001 | ₹62.0 Cr+₹20.6 L (0.33%) | L2 | Admitted-Finance |
| 3 | L3₹66.7 Cr+₹4.9 Cr (7.91%)Admitted-Finance SHREE HEERA DHAM BATHAIN ROAD KOSHI KALAN 281403 MATHURA UTTAR PRADESH | MATHURA | UTTAR PRADESH | 281403 | ₹66.7 Cr+₹4.9 Cr (7.91%) | L3 | Admitted-Finance |
| 4 | L4₹68.5 Cr+₹6.7 Cr (10.9%)Admitted-Finance | ₹68.5 Cr+₹6.7 Cr (10.9%) | L4 | Admitted-Finance |
| 5 | L5₹73.2 Cr+₹11.5 Cr (18.6%)Admitted-Finance CHINAR COMMERCIAL COMPLEX THE BUND RESIDENCY ROAD SRINAGAR 190 001 | SRINAGAR | SRINAGAR | JAMMU AND KASHMIR | 190001 | ₹73.2 Cr+₹11.5 Cr (18.6%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | pcguptaco L4 | R and B Infra Project Pvt Ltd L1 | M S INFRAENGINEERS PVT. LTD. L6 | Shree Girrajjee Infra Heights Private Limited L3 | M/S R and C INFRAENGINEERS PVT LTD L2 | M M SHAWL ENGINEERS AND CONTRACTORS PVT LTD L5 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Construction of left-over work (2-lane with paved shoulder) of the road stretch of Pkg-III at Kandni Village from design Ch. 0+000 to Ch. 4+037 (Ch. 70+900 to Ch. 74+650 of NH-244) in 4.037 km length on Khellani-Kishtwar-Chhatroo section of NH-244 in UT of Jammu & Kashmir on EPC Mode | 1 | Lump Sum | 68,47,71,313.13 ₹68,47,71,313.13 | 61,77,15,000 ₹61,77,15,000 Lowest | 88,53,91,500 ₹88,53,91,500 | 66,66,00,000 ₹66,66,00,000 | 61,97,74,050 ₹61,97,74,050 | 73,24,33,000 ₹73,24,33,000 |
Tender Value
Refer Docs
EMD Value
₹99 L
Closing Date
29 Sept 2025, 11:00 amClosed
Ashish Gupta
NHIDCL HQ New Delhi
Construction of left-over work (2-lane with PS) of the road stretch of Pkg-III at Kandni Village from design Ch. 0.000 to Ch. 4.037 (Ch. 70.900 to Ch. 74.650 of NH-244) in 4.037 km length on Khellani-Chhatroo section of NH-244 in UT of JK on EPC Mode
2025_NHIDC_872495_1
NHIDCL/JK/NH-244 /Khellani-Chattroo/ NewAlignment/2024/255968
Open Tender
Civil Works
EPC Contract
730 days
Jammu
Please refer Tender documents.
5 documents required · 5 mandatory
₹11,800
MD NHIDCL
₹99 L
NHIDCL HQ New Delhi
13 Jan 2026
7 Aug 2025
30 Sept 2025
7 Aug 2025
29 Sept 2025
15 Sept 2025
7 Aug 2025 - 1 Sept 2025
1 Sept 2025
Amount
Construction of left-over work (2-lane with paved shoulder) of the road stretch of Pkg-III at Kandni Village from design Ch. 0+000 to Ch. 4+037 (Ch. 70+900 to Ch. 74+650 of NH-244) in 4.037 km length on Khellani-Kishtwar-Chhatroo section of NH-244 in UT of Jammu & Kashmir on EPC Mode
M/S R and C INFRAENGINEERS PVT LTD (BID ID -3286368)
Shree Girrajjee Infra Heights Private Limited (BID ID -3290426)
pcguptaco (BID ID -3285215)
M M SHAWL ENGINEERS AND CONTRACTORS PVT LTD (BID ID -3289991)
M S INFRAENGINEERS PVT. LTD. (BID ID -3285909)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
177790967.xls
BOQ Document • 0.31 MB
177790968.pdf
Tender Document • 0.15 MB
RFP.pdf
Tender Document • 1.84 MB
DCA.pdf
Tender Document • 2.49 MB
TechnicalSchedules.pdf
Tender Document • 3.20 MB
177790970.html
Tender Document • 0.06 MB
181765733.pdf
Tender Document • 0.44 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .