Construction of left-over work (2-lane with PS) of the road stretch of Pkg-III at Kandni Village from design Ch. 0.000 to Ch. 4.037 (Ch. 70.900 to Ch. 74.650 of NH-244) in 4.037 km length on Khellani-Chhatroo section of NH-244 in UT of JK on EPC Mode
Loading…