| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.9 LAccepted-AOC | ₹10.9 L | L1 | Accepted-AOC as per term condition |
| 2 | L2₹11.2 LRejected-AOC | ₹11.2 L | L2 | Rejected-AOC L2 |
| 3 | L3₹11.4 LRejected-AOC | ₹11.4 L | L3 | Rejected-AOC L3 |
Tender Value
Refer Docs
EMD Value
₹24,510
Closing Date
31 Jan 2026, 12:00 pmClosed
DGM WCS
DGM WCS BHEL HEEP HARIDWAR
Misc. Civil and other foundation works in factory and other areas in HEEP
2026_BHEL_57268_1
BHEL/HEEP/WCS/25-26/202503651 Dt 21.01.2026
Limited
Civil Works
304 days
HEEP Haridwar
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹24,510
29 Mar 2026
21 Jan 2026
31 Jan 2026
21 Jan 2026
31 Jan 2026
21 Jan 2026
Carriage of materials by mechanical transport including loading, unloading and stacking: Lime, moorum, building rubbish, earth, manure or sludge and excavated rocks:: Lime, moorum, building rubbish:1 km Unit:cum
Carriage of materials by mechanical transport including loading, unloading and stacking: Lime, moorum, building rubbish, earth, manure or sludge and excavated rocks:: Earth:1 km Unit:cum
Earth work in excavation over areas (exceeding 30cm in depth. 1.5m in width as well as 10 sqm on plan) including disposal of excavated earth, lead upto 50m and lift upto 1.5m; disposed earth to be levelled and neatly dressed:All kinds of soil Unit:cum
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth: consolidating each deposited layer by ramming and:watering, lead up to 50 m and lift upto 1.5 m Unit:cum
Centring and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases of Columns Unit:sqm
Centring and shuttering including strutting, propping etc. and removal of form for:removal of form for: :Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. Unit:sqm
Centring and shuttering including strutting, propping etc. and removal of form for:removal of form for: :Suspended floors, roofs, landings, balconies and access platform. Unit:sqm
Centring and shuttering including strutting, propping etc. and removal of form for:removal of form for: :Lintels, beams, plinth beams, girders, bressumers and cantilevers. Unit:sqm
Centring and shuttering including strutting, propping etc. and removal of form for:removal of form for: :Columns, Pillars, Piers, Abutments, Posts and Struts Unit:sqm
Extra for additional height in centring, shuttering where ever required with adequate bracing, propping etc. including cost of de-shuttering and decentring at all levels, over a height of 3.5 m, for every additional height of 1 metre or part thereof (Plan area to be measured):Suspended floors, roofs, landing, beams and balconies(Plan area to be measured) Unit:sqm
Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete . :Thermo-Mechanically Treated bars. Unit:kilogram
Providing and fixing 18mm thick mirror polished, machine cut for kitchen platforms, vanity counters facias and similar locations of required size of approved shade, colour and texture laid over 20mm thick base cement mortar 1:4 (1 Cement : 4 coarse sand) with joints treated with white cement ,mixed with matching pigment, epoxy touch ups, including rubbing ,curing etc. complete at all levels.:Over 0.5 sqm but upto 1.0 sqm Unit:sqm
Providing and fixing homogeneous Polyvinyl chloride sheet /tile in flooring and skirting in approved pattern on a smooth and damp proof base using rubber based adhesives of approved quality and manufacturer like Dunlop S-758, Fevicol SR 998 or equivalent including rolling with light wooden roller weighing about 5 kg. all complete as directed by Engineer-in-Charge, in approved colour and shade.: 1.5 mm thick:Sheet Unit:sqm
Providing and fixing Ist quality ceramic glazed tiles conforming to IS : 13753 of minimum thickness 5 mm of approved make like NITCO, ORIENT, SOMANY KAJARIA, or equivalent make in all colours, shades, designs and print except begundy, bottle green, black of any size as approved by Eningeer-in-Charge in skirting, risers of steps and dados over 12 mm thick bed of Cement Mortar 1:3 (1 Cement : 3 Coarse sand) and jointing with grey cement slurry @ 3.3kg per sqm including pointing in white cement mixed with pigment of matching shade complete. Unit:sqm
Providing and laying Ceramic glazed floor tiles 300x300 mm (thickness to be specified by the manufacturer) of 1st quality conforming to IS : 13755 of NITCO, ORIENT, SOMANY KAJARIA, or equivalent make in colours such as White, Ivory, Grey, Fume Red Brown, laid on 20 mm thick Cement Mortar 1:4 (1 Cement : 4 Coarse sand) including pointing the joints with white cement and matching pigment etc., complete. Unit:sqm
Providing and laying polished porcelain floor tiles in different sizes (thickness to be specified by the manufacturer) with water absorptions less than 1% and flexural strength not less than 30N/mm2, in all colours and shades, laid on 20 mm thick cement mortar 1:4 (1 cement : 4 coarse sand) including grouting the joints with white cement and matching pigments etc., complete:Size of Tile 60x60 cm Unit:sqm
Providing and fixing on wall face unplasticised - Rigid PVC rain water pipes conforming to IS : 13592 Type A including jointing with seal ring conforming to IS : 5382 leaving 10 mm gap for thermal expansion. (i) Single socketed pipes:75 mm diameter Unit:metre
Providing and fixing on wall face unplasticised - Rigid PVC rain water pipes conforming to IS : 13592 Type A including jointing with seal ring conforming to IS : 5382 leaving 10 mm gap for thermal expansion. (i) Single socketed pipes:110 mm diameter Unit:metre
Providing and fixing on wall face unplasticised - PVC moulded fittings/accessories for unplasticised - Rigid PVC rain water pipes conforming to IS : 13592 Type A including jointing with seal ring conforming to IS : 5382 leaving 10 mm gap for thermal expansion.: Coupler:110 mm Unit:each
Providing and fixing on wall face unplasticised - PVC moulded fittings/accessories for unplasticised - Rigid PVC rain water pipes conforming to IS : 13592 Type A including jointing with seal ring conforming to IS : 5382 leaving 10 mm gap for thermal expansion.: Single tee with door:110x110x110 mm Unit:each
Providing and fixing on wall face unplasticised - PVC moulded fittings/accessories for unplasticised - Rigid PVC rain water pipes conforming to IS : 13592 Type A including jointing with seal ring conforming to IS : 5382 leaving 10 mm gap for thermal expansion.: Bend 87.5°:75 mm bend Unit:each
Providing and fixing on wall face unplasticised - PVC moulded fittings/accessories for unplasticised - Rigid PVC rain water pipes conforming to IS : 13592 Type A including jointing with seal ring conforming to IS : 5382 leaving 10 mm gap for thermal expansion.: Bend 87.5°:110 mm bend Unit:each
Providing and fixing unplasticised -PVC pipe clips of approved design to unplasticised - PVC rain water pipes by means of 50x50x50mm hard wood plugs, screwed with M.S. screws of required length including cutting brick work and fixing in cement mortar 1:4 (1 cement : 4 coarse sand) and making good the wall etc. complete.:75 mm Unit:each
Distempering with oil bound washable distemper of approved brand and manufacture to give an even shade :New work (two or more coats) over and including priming coat with cement primer Unit:sqm
Removing dry or oil bound distemper by scrapping, sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete Unit:sqm
Demolishing cement concrete including disposal of material within 50 metres lead : :1:3:6 or richer mix Unit:cum
Demolishing : R.C.C. work including stacking: of steel" bars and disposal of unserviceable "material within 50 metres lead: Unit:cum
Demolishing brick work including stacking of serviceable material and disposal of unserviceable material within 50 metres lead: :In cement mortar Unit:cum
Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead. :For thickness of tiles 10 mm to 25 mm Unit:sqm
Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead. Unit: Sqm
Percentage BoQ2
BoQ_Ver3.0
Name of the Bidder/ Bidding Firm / Company :
PRICE SCHEDULE (Worked Out Items) (This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only )
NUMBER #
Supplying chemical emulsion in sealed containers including delivery as specified.:Chlorpyriphos/ Lindane emulsifiable concentrate of 20% Unit:litre
Diluting and injecting chemical emulsion for POST-CONSTRUCTIONAL anti-termite treatment (excluding the cost of chemical emulsion) :: Treatment of soil under existing floors using chemical emulsion @ one litre per hole, 300 mm apart including drilling 12 mm diameter holes and plugging with cement mortar 1 :2 (1 cement : 2 Coarse sand) to match the existing floor ::With Chlorpyriphos/Lindane E.C. 20% with 1% concentration Unit:sqm
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering-All work upto plinth level:1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) Unit:cum
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering-All work upto plinth level:1:3:6 (1 Cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) Unit:cum
Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge. (Note :- Cement content considered in this item is @ 330 kg/cum. Excess/less cement used as per design mix is payable/recoverable separately).:All works upto plinth level Unit:cum
Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge. (Note :- Cement content considered in this item is @ 330 kg/cum. Excess/less cement used as per design mix is payable/recoverable separately).:All works above plinth level upto floor V level Unit:cum
Add for using extra cement in the items of design mix over and above the specified cement content therein. Unit:quintal
Providing and laying in position ready mixed M-25 grade concrete for reinforced cement concrete work, using cement content as per approved design mix, manufactured in fully automatic batching plant and transported to site of work in transit mixer for all leads, having continuous agitated mixer, manufactured as per mix design of specified grade for reinforced cement concrete work, including pumping of R.M.C. from transit mixer to site of laying , excluding the cost of centering, shuttering finishing and reinforcement, including cost of admixtures in recommended proportions as per IS : 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability as per direction of the Engineer - in - charge. (Note :- Cement content considered in this item is @ 330 kg/cum. Excess/less cement used as per design mix is payable/recoverable separately).:All works upto plinth level Unit:cum
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in::Cement mortar 1:4 (1 cement : 4 coarse sand) Unit:cum
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in ::Cement mortar 1:4 (1 cement : 4 coarse sand) Unit:cum
Providing gola 75x75 mm in cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 stone aggregate 10 mm and down gauge), including finishing with cement mortar 1:3 (1 cement : 3 fine sand) as per standard design :: In 75x75 mm deep chase Unit:metre
12 mm cement plaster of mix : :1:4 (1 cement: 4 fine sand) Unit:Sqm
15 mm cement plaster on the rough side of single or half brick wall of mix : :1:4 (1 cement: 4 fine sand) Unit:Sqm
Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete. Unit:Sqm
Supplying and stacking at site.:Stone screening 13.2 mm nominal size (Type A) Unit:cum
Supplying and stacking at site.:Stone screening 11.2 mm nominal size (Type B) Unit:cum
Grading roof for water proofing treatment with :Cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) Unit:Cum
PROVIDING AND GROUTING OF ANCHOR BOLT OF FOUNDATION /BED PLATE ,DOWEL TUBES/SHEAR KEY/JOINTS OF PRECAST MEMBERS IN M-60 GRADE OR ABOVE WITH CEMENTIOUS GROUT (NON SHRINK) SUCH AS FOSROC CONBEXTRAGP2/CICIO GROUT GP/SIKA GROUT 214 IN/SHRINKOMP 30/PIDICRETE 10 M OA ANY OTHER EQUAIVALENT BRAND AS APPROVEPROVIDING AND GROUTING OF ANCHOR BOLT OF FOUNDATION /BED PLATE ,DOWEL TUBES/SHEAR KEY/JOINTS OF PRECAST MEMBERS IN M-60 GRADE OR ABOVE WITH CEMENTIOUS GROUT (NON SHRINK) SUCH AS FOSROC CONBEXTRAGP2/CICIO GROUT GP/SIKA GROUT 214 IN/SHRINKOMP 30/PIDICRETE 10 M OA ANY OTHER EQUAIVALENT BRAND AS APPROVED BY ENGINEER-IN-CHARGE WITH SUITABLE MEANS (FREE FLOWING/PUMP) COMPLETE AS INCLUDES FIXING OF BIDDING/SHUTTERING AS REQUIRED,POURING OF WATER IN POCKETS BEFORE GROUTING AND DEWATERING THE SAME AS PER DIRECTION OF ENGINEER-IN-CHARGE WITH PUMP AND CURING OF POCKET WITH GUNNY JUTE BAGS FOR MINIMUM 7 DAYS COMPLETE IN ALL RESPECT(THE PAYMENT SHALL BE MADE ON THE BASIS OF ACTUAL WEIGHT OF APPROVED GROUT INJECTED AS PER ACTUAL POCKET SIZES AND CONSUMPTION BASIS.)
Lettering on the Mild Steel / concrete / wood / flax board surface with synthetic enamel paint of approved brand and manufacture. The board would be painted to give an even and smooth finish of uniform shade. After painting the base coat lettering should be done of uniform size and texture as directed by engineer incharge.
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.37 MB
Tendernotice_2.pdf
PDF • 2.95 MB
BOQ_61892.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid