Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.7 LAdmitted-Fee/PreQual/Technical/Finance | ₹3.7 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹3.8 LAdmitted-Fee/PreQual/Technical/Finance | ₹3.8 L | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹6.5 LAdmitted-Fee/PreQual/Technical/Finance | ₹6.5 L | L3 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | BABY B L1 | BASHEER V P L2 | AYYAPPANKUTTY M M L3 |
|---|---|---|---|---|---|---|
| 1.00Replacement of Damaged Structural in NP Plant, FACT CD. | ||||||
| 1.01 | REPLACEMENT OF DAMAGED STRUCTURAL IN NP PLANT, FACT CD
Work involves: Collection of required materials from FACT -CD stores / plant area and transport to the work site at NP area. All types of structural items like platforms, ladders, stair cases, handrails, roofs, pipe bridges, Equipment support, pipe & duct supports, columns, walkways, etc. shall be fabricated as per the instruction of the Officer - in -Charge to meet site requirement. Existing damaged structure in various locations in NP Plant shall be dismantled / removed and replaced with newly fabricated one / modified structure to meet the site requirement. Damaged structurals shall be transported to scrap yard/area earmarked as per the instruction from site in charge. Erected structurals shall be painted with two (02) coats of zinc chromate yellow primer of approved make/quality and two (02) coats of synthetic enamel paint of distinct colours of approved make/quality. The surfaces to be painted are to be cleaned manually using wire brush to the extent that entire surface is free from dirt, dust, oil, grease or any foreign material.
The structural steel after transporting from store to worksite shall be immediately be cleaned and first coat primer shall be applied. The structurals after fabrication and erection shall be applied with second coat of zinc chromate yellow primer after necessary cleaning at all heights and elevations .Two coats of synthetic enamel paint of distinct colours shall be applied one after the other after giving sufficient curing time after each coat applied at all elevations. Any area inaccessible after erection shall be painted beforehand.All costs incurred in painting including cost of paints,primers,painting equipments,cleaning equipments,handling charges,scaffolding and any other incidental expenses will be under contractor's scope. | 15 | MT | 1,80,000 ₹1,80,000 Lowest | 2,10,000 ₹2,10,000 | 3,45,000 ₹3,45,000 |
| 1.02 | "REPLACEMENT OF ENCLOSURES AND PROTECTIVE ELEMENTS OF VARIOUS EQUIPMENTS LIKE ELEVATORS,CONVEYORS, FANS ETC. IN NP PLANT" Work involves: fabrication and replacement of damaged enclosures and protective elements like dummies, door, casing, stiffeners, covers, guards, shrouds etc. of various static and rotating equipment like Vessels, Ducts, elevators, conveyors, fans, etc. situated at different locations and elevations in the both streams of NP plant.
The activity includes Collection of required materials from FACT -CD stores / plant area and transport to the work site at NP area. All types of enclosures and protective elements of the various equipment shall be fabricated as per the instruction of the Officer - in -Charge to meet site requirement. Existing damaged items in various locations in NP Plant shall be dismantled / removed and replaced with newly fabricated one to meet the site requirement. Damaged enclosures and protective elements shall be transported to scrap yard/area earmarked as per the instruction from site in charge. Erected enclosures and protective elements shall be painted with two (02) coats of zinc chromate yellow primer of approved make/quality and two (02) coats of synthetic enamel paint of distinct colours of approved make/quality. The surfaces to be painted are to be cleaned manually using wire brush to the extent that entire surface is free from dirt, dust, oil, grease or any foreign material. All costs incurred in painting including cost of paints, primers, painting equipment, cleaning equipment, handling charges, scaffolding and any other incidental expenses will be under contractor's scope. | 4 | MT | 80,000 ₹80,000 | 56,000 ₹56,000 Lowest | 1,19,000 ₹1,19,000 |
| 1.03 | FABRICATION & ERECTION OF NEW STRUCTURAL IN NP PLANT, FACT CD
Work involves: Collection of required materials from FACT-CD stores / plant area and transport to the work site at NP area. All types of structural items like platforms, ladders, staircases, handrails, roofs, pipe bridges, equipment supports, pipe & duct supports, columns, walkways, etc. shall be fabricated and erected as per the instruction of the Officer-in-Charge to meet the site requirement. Erected structural elements shall be painted with two (02) coats of zinc chromate primer of approved make / quality and two (02) coats of synthetic enamel paint of distinct colours of approved make / quality. The surfaces to be painted are to be cleaned manually using a wire brush to the extent that the entire surface is free from dirt, dust, oil, grease, or any foreign material.
The structural steel, after transporting from the store to the worksite, shall immediately be cleaned and the first coat of primer shall be applied. The structural elements, after fabrication and erection, shall be applied with a second coat of zinc chromate primer after necessary cleaning at all heights and elevations. Two coats of synthetic enamel paint of distinct colours shall be applied one after the other, allowing sufficient curing time after each coat is applied at all elevations. Any area inaccessible after erection shall be painted beforehand. All costs incurred in painting, including the cost of paints, primers, painting equipment, cleaning equipment, handling charges, scaffolding, and any other incidental expenses, will be within the contractor's scope. | 8 | MT | 1,12,000 ₹1,12,000 Lowest | 1,12,000 ₹1,12,000 Lowest | 1,84,000 ₹1,84,000 |
Tender Value
Refer Docs
EMD Value
₹5,000
Closing Date
23 Jul 2026, 2:00 pmClosed
NITHIN C S
SM (P and P)-CD
REPLACEMENT OF DAMAGED STRUCTURAL IN NP PLANT, FACT CD
2026_FACT_916386_1
4096/2026-2027/E33804
Limited
Miscellaneous Works
Item Rate
365 days
AMBALAMEDU
This tender is issued on limited tender basis from the registered bidders of FACT (CD)
4 documents required · 4 mandatory
₹0
₹5,000
Yes
25 Jul 2026
8 Jul 2026
24 Jul 2026
8 Jul 2026
23 Jul 2026
8 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Replacement of Damaged Structural in NP Plant, FACT CD. | |||||
| 1.01 | REPLACEMENT OF DAMAGED STRUCTURAL IN NP PLANT, FACT CD
Work involves: Collection of required materials from FACT -CD stores / plant area and transport to the work site at NP area. All types of structural items like platforms, ladders, stair cases, handrails, roofs, pipe bridges, Equipment support, pipe & duct supports, columns, walkways, etc. shall be fabricated as per the instruction of the Officer - in -Charge to meet site requirement. Existing damaged structure in various locations in NP Plant shall be dismantled / removed and replaced with newly fabricated one / modified structure to meet the site requirement. Damaged structurals shall be transported to scrap yard/area earmarked as per the instruction from site in charge. Erected structurals shall be painted with two (02) coats of zinc chromate yellow primer of approved make/quality and two (02) coats of synthetic enamel paint of distinct colours of approved make/quality. The surfaces to be painted are to be cleaned manually using wire brush to the extent that entire surface is free from dirt, dust, oil, grease or any foreign material.
The structural steel after transporting from store to worksite shall be immediately be cleaned and first coat primer shall be applied. The structurals after fabrication and erection shall be applied with second coat of zinc chromate yellow primer after necessary cleaning at all heights and elevations .Two coats of synthetic enamel paint of distinct colours shall be applied one after the other after giving sufficient curing time after each coat applied at all elevations. Any area inaccessible after erection shall be painted beforehand.All costs incurred in painting including cost of paints,primers,painting equipments,cleaning equipments,handling charges,scaffolding and any other incidental expenses will be under contractor's scope. | 15 | MT | - | - |
| 1.02 | "REPLACEMENT OF ENCLOSURES AND PROTECTIVE ELEMENTS OF VARIOUS EQUIPMENTS LIKE ELEVATORS,CONVEYORS, FANS ETC. IN NP PLANT" Work involves: fabrication and replacement of damaged enclosures and protective elements like dummies, door, casing, stiffeners, covers, guards, shrouds etc. of various static and rotating equipment like Vessels, Ducts, elevators, conveyors, fans, etc. situated at different locations and elevations in the both streams of NP plant.
The activity includes Collection of required materials from FACT -CD stores / plant area and transport to the work site at NP area. All types of enclosures and protective elements of the various equipment shall be fabricated as per the instruction of the Officer - in -Charge to meet site requirement. Existing damaged items in various locations in NP Plant shall be dismantled / removed and replaced with newly fabricated one to meet the site requirement. Damaged enclosures and protective elements shall be transported to scrap yard/area earmarked as per the instruction from site in charge. Erected enclosures and protective elements shall be painted with two (02) coats of zinc chromate yellow primer of approved make/quality and two (02) coats of synthetic enamel paint of distinct colours of approved make/quality. The surfaces to be painted are to be cleaned manually using wire brush to the extent that entire surface is free from dirt, dust, oil, grease or any foreign material. All costs incurred in painting including cost of paints, primers, painting equipment, cleaning equipment, handling charges, scaffolding and any other incidental expenses will be under contractor's scope. | 4 | MT | - | - |
| 1.03 | FABRICATION & ERECTION OF NEW STRUCTURAL IN NP PLANT, FACT CD
Work involves: Collection of required materials from FACT-CD stores / plant area and transport to the work site at NP area. All types of structural items like platforms, ladders, staircases, handrails, roofs, pipe bridges, equipment supports, pipe & duct supports, columns, walkways, etc. shall be fabricated and erected as per the instruction of the Officer-in-Charge to meet the site requirement. Erected structural elements shall be painted with two (02) coats of zinc chromate primer of approved make / quality and two (02) coats of synthetic enamel paint of distinct colours of approved make / quality. The surfaces to be painted are to be cleaned manually using a wire brush to the extent that the entire surface is free from dirt, dust, oil, grease, or any foreign material.
The structural steel, after transporting from the store to the worksite, shall immediately be cleaned and the first coat of primer shall be applied. The structural elements, after fabrication and erection, shall be applied with a second coat of zinc chromate primer after necessary cleaning at all heights and elevations. Two coats of synthetic enamel paint of distinct colours shall be applied one after the other, allowing sufficient curing time after each coat is applied at all elevations. Any area inaccessible after erection shall be painted beforehand. All costs incurred in painting, including the cost of paints, primers, painting equipment, cleaning equipment, handling charges, scaffolding, and any other incidental expenses, will be within the contractor's scope. | 8 | MT | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.12 MB
BOQ_963049.xls
BOQ • 0.23 MB
SpecialConditions.pdf
Tender Documents • 0.08 MB
Tenderdocuments.pdf
Tender Documents • 1.34 MB
Compliance.pdf
Tender Documents • 0.09 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].