| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.9 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹15.9 L+₹1,747.15 (0.11%)Rejected-AOC | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | JOJY JOEPH L1 | LOVELY CONSTRUCTION L2 |
|---|---|---|---|---|---|
| 1.00Construction of Anganwadi | |||||
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil | 15.96 | cum | 222 ₹3,543.12 Lowest | 223 ₹3,559.08 |
| 1.00 | 51.2.3:Filling with Quarry Muck Filling up low lying and water logged areas with local material/ quarry muck, spreading in layers, leveling the top at site and consolidation by ramming, etc complete for improving the CBR value of subgrade | 10.96 | cum | 903 ₹9,900.49 Lowest | 905 ₹9,922.42 |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size) | 13.7 | cum | 7,110 ₹97,421.22 Lowest | 7,115 ₹97,489.73 |
| 1.00 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 90.67 | sqm | 678 ₹61,477.65 Lowest | 679 ₹61,568.33 |
| 1.00 | 5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform | 37.99 | sqm | 850 ₹32,295.75 Lowest | 855 ₹32,485.73 |
| 1.01 | 5.2.2:Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) | 17.08 | cum | 11,430 ₹1,95,224.4 Lowest | 11,430 ₹1,95,224.4 Lowest |
| 1.01 | 5.3:Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 150 landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) : 3 graded stone aggregate 20 mm nominal size). | 11.52 | cum | 11,990 ₹1,38,160.77 Lowest | 11,990 ₹1,38,160.77 Lowest |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 2,451 | kilogram | 100 ₹2,45,100 Lowest | 100 ₹2,45,100 Lowest |
| 1.01 | 50.6.1.5:Solid block masonry using pre cast solid blocks ( Factory made) of size 30x20x20cm or nearest available size confirming to IS 2185 Part I of 1979 for super structure up to floor two level thickness 20cm and above in: CM 1:6 ( 1 cement : 6 coarse sand) etc complete | 18.41 | cum | 6,792 ₹1,25,033.93 Lowest | 6,792 ₹1,25,033.93 Lowest |
Tender Value
₹15.9 L
EMD Value
₹39,874
Closing Date
25 Nov 2023, 6:00 pmClosed
Assistant engineer
LID and EW Section RAmnkary
Annual Plan-102/24 Ramankary GP Toilet complex at Ramankari NSS School.-Toilet complex.
2023_LSGD_622682_1
03(1) AE LID EW RMKY 2023 24 phase 3
Open Tender
Civil Works - Buildings
Item Rate
270 days
Ramankary
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
Yes
₹39,874
Yes
5 Jun 2026
18 Nov 2023
29 Nov 2023
18 Nov 2023
25 Nov 2023
18 Nov 2023
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .