Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹28.9 LAccepted-AOC | L1 | Accepted-AOC Work awarded | |
| 2 | L2₹30.5 L+₹1.6 L (5.56%)Rejected-AOC | L2 | Rejected-AOC L2 bidder | |
| 3 | L3₹30.6 L+₹1.7 L (5.95%)Rejected-Finance | L3 | Rejected-Finance L3 bidder | |
| 4 | L4₹35.6 L+₹6.7 L (23.1%)Rejected-Finance | L4 | Rejected-Finance L4 bidder |
Tender Value
₹37.4 L
EMD Value
₹50,000
Closing Date
21 Jan 2023, 4:00 pmClosed
DeputyDirectorofSoilConservation
Officeof theDirectorofSoilSurveyandSoilConservation
Retaining wall Check Dam Cross Check
2023_DSSC_548874_1
SSSC/85/2023/PG2/RIDF25
Open Tender
Civil Works - Others
Item Rate
365 days
Keezhattoor Panchayat
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,755
₹50,000
9 Feb 2023
12 Jan 2023
23 Jan 2023
12 Jan 2023
21 Jan 2023
12 Jan 2023
Amount
RETAINING WALL 1.50M HT
2.6.1 -Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
60.7.1-DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
4.3.1-Centering and shuttering including strutting, propping etc. and removal of form work for:Foundation, footing,bases for columns
4.1.5 - Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
CHECK DAM USING JUNGLE STONE
2.6.1- Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
od 105/2018-2019-Stone MASONRY _ Jungle Stone without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
CROSS CHECK-2.6.1
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
60.7.1-DRY RUBBLE MASONRY _Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
4.3.1-Centering and shuttering including strutting, propping etc. and removal of form work for:Foundation, footing,bases for columns
4.1.5-Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
SAIDALI M
CHANDRAN M C
NOUNAISE.P
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_804020.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .