Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.8 LAccepted-AOC AMRUTHA BHAVAN ANAPETTAKONGAL P O EDAMON KOLLAM | EDAMON | KOLLAM | KERALA | L1 | Accepted-AOC Being L1 | |
| 2 | L2₹15.2 L+₹35,597.03 (2.39%)Rejected-AOC | L2 | Rejected-AOC Being L2 |
| Sl No | Description | Qty | Unit | AKHIL CHANDRAN L1 | HAREESH G L2 |
|---|---|---|---|---|---|
| 1.00Boat jetty | |||||
| 1.00 | 15.3:Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge. | 1.29 | cum | 3,580 ₹4,603.88 Lowest | 3,670 ₹4,719.62 |
| 1.00 | 15.7.4:Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In cement mortar | 0.72 | cum | 2,077 ₹1,495.44 Lowest | 2,130 ₹1,533.6 |
| 1.00 | 15.23.1:Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead.For thickness of tiles 10 mm to 25 mm | 78.3 | sqm | 74 ₹5,794.2 Lowest | 74 ₹5,794.2 Lowest |
| 1.00 | OD21689/2024-2025:Earth work excavation in under water by mechanical means(Hydraulic excavator with pontoon)over areas in front of boat jetty (exceeding 30cm depth up to 2.5m depth)including disposal of excavated earth /clay sufficiently away from the boat route channel and spreading uniformly in low lying area in the back water not exceeding 15cm thickness as directed by the departmental officers at site Detailes of cost for 10cum | 297.85 | cum | 150 ₹44,677.5 Lowest | 150 ₹44,677.5 Lowest |
| 1.00 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 11.26 | sqm | 743 ₹8,364.69 Lowest | 760 ₹8,556.08 |
| 1.01 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | 0.83 | cum | 10,226 ₹8,538.71 Lowest | 10,480 ₹8,750.8 |
| 1.01 | 50.6.1.8:Solid block masonry using pre cast solid blocks (Factory made) of size 40x20x15cm or nearest available size confirming to IS 2185 part I of 1979 for super structure up to floor two level with thickness 15cm in: CM 1:6 ( 1 cement : 6 coarse sand etc complete | 0.43 | cum | 7,499 ₹3,262.07 Lowest | 7,690 ₹3,345.15 |
| 1.01 | 5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform | 3.03 | sqm | 937 ₹2,840.98 Lowest | 960 ₹2,910.72 |
| 1.01 | 5.6:Reinforced cement concrete work in chimneys, shafts, up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 ( 1 cement : 1.5 coarse sand(Zone III) derived from natural
sources: 3 graded stone aggregate 20 mm nominal size derived from natural
sources) | 0.3 | cum | 12,727 ₹3,818.1 Lowest | 13,050 ₹3,915 |
Tender Value
₹15.3 L
EMD Value
₹50,000
Closing Date
30 Oct 2025, 5:00 pmClosed
Executive Engineer
Executive Engineer Inland Navigation Division Kollam
GENERAL CSIND Edava GP Renovation of Kappil HS Boat Jetty in Edava Grama Panchayath at Varkala Constituency General Civil Work
2025_Irrig_810832_1
IRR/KP/TR/6898/2024_5_1_1/1
Open Tender
Civil Works - Others
Item Rate
240 days
Edava Kappil
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
Yes
₹50,000
Yes
17 Nov 2025
17 Oct 2025
3 Nov 2025
17 Oct 2025
30 Oct 2025
17 Oct 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1353615.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
BIDDOC.pdf
Tender Documents • 2.00 MB
BOQ_1353615.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .