| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.5 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | Rejected-Technical NEAR BHARTIYA VIDYA MADIR CHURCHA DISTT KOREA CHHATTISGARH 497339 | CHURCHA | KOREA | CHHATTISGARH | 497339 | - | Rejected-Technical L5 | |
| 3 | Rejected-Technical | - | Rejected-Technical L2 | |
| 4 | Rejected-Technical AT KANDSAR P O BAHIMAR P S KATKAMSANDI DIST HAZARIBAG JHARKHAND | NA | NA | 835201 | - | Rejected-Technical L3 | |
| 5 | Rejected-Technical HOUSE NO 397VTIPPLER DAFAI SHIVPUR SHIVPUR CHURCHA TIPPLER DAFAI KORIYA CHHATTISGARH 497339 UDYAM CG 11 0001978 | KOREA | CHHATTISGARH | 497339 | - | Rejected-Technical L4 |
Tender Value
Refer Docs
EMD Value
₹17,200
Closing Date
12 Aug 2022, 5:00 pmClosed
SO(Mining) Baikunthpur Area.
Office of the General Manager, Baikunthpur Area, Distt - Korea (C.G) 497335
(I) Dismantling, transportation and installation of 1000mm wide belt conveyor along 87L West gallery. (II) Dismantling, transportation and installation of haulage system, laying and packing of haulage track line along 89L West gallery of 87L West de
2022_SECL_251524_1
SECL/BKP/GM(O)/22-23/CE/eT/22 Dt.27.07.2022
Open Tender
Civil Works - Others
Item Rate
135 days
East Block of Churcha Mine (RO)
Please refer Tender document
3 documents required · 3 mandatory
₹17,200
17 Nov 2022
28 Jul 2022
13 Aug 2022
29 Jul 2022
12 Aug 2022
29 Jul 2022
29 Jul 2022 - 5 Aug 2022
Amount
Item Description/ Heading (I) Dismantling, transportation and installation of 1000mm wide belt conveyor along 87L West Gallery. (Sl No. 1 to 12) (II) Dismantling, transportation and installation of endless haulage system, laying and packing of haulage track line along 89L West gallery of 87L West depillaring panel at East Block of Churcha Mine (RO). (Sl. No. 13 to 17). (Average 7 unskilled manpower involved in this work on daily basis for 120 days) (Total - 840 manpower) (Work period - 135 days).
Dismantling and transportation of 1000mm size double drive drum with loop take-up to the track end with a lead of 100m. Scope of work: - a) Dismantling of motor, gear box, drum, loop take-up & b) Transportation of the same at a lead of 100m. (Dismantling site - 108L / C1 dip - C2 dip)
Installation of 1000mm size double drive drum with loop take-up. (Installation site - 87L / 12 dip).
Transportation / carriage of steel structure by manual labour including loading, unloading & stacking the same for lead up to 50m in underground.
Installation of belt structure of 1000mm belt in UG gallery. Scope of work:-( a) Laying of the belt structure along with the proposed gallery. (b) Fixing of nuts and bolts, stool and strangers. (c) Fixing of brackets on the strangers at the interval of 1.2m. (d) Fixing of bottom and top rollers. (e) Levelling of structure. (f) Preparation of loading point and discharge point. (Installation location - Along 87L West in between 12 dip to 1 dip).
Transportation of PVC belting of length 200m from surface to UG / from one district to another district up to end of the track line for lead of 1 Km. Scope of work:- (a) Pushing the trolley up to the site of unreeling. (b) Unreeling of belting on surface. (c) Loading into trolley with folding & tightening with trolley. (d) Pushing the loaded trolley up to incline mouth / haulage facility. (e) Transportation through haulage up to end of the haulage track. (Transportation site - From 104L in between C1 dip & C2 dip).
Change of PVC belt on conveyor structure.
Dismantling and transportation & Installation of 1000mm size tail end drum, drum base, tail end guard, side plate / loading brackets (chute) decking plates in UG within a lead of 100m. Scope of work :- (a) Dismantling of tail end drum, decking plate, tail end guard, roller, scrapper etc. (b) Transportation of the same at a lead of 100m. (c) Drilling in floor and grouting / jamming with rod in tail end base. (d) Installation / fitting of side plate, tail end guard, decking plate, drum. (e) Alignment of the belt structure and successful running of belt conveyor with loaded material. (Dismantling site - 108L / C1 dip - 13 dip, Installation site - 87L / 1 dip).
Mulma cleaning / removal of debris from UG galleries and cleaning of belt roadway and stacking / loading within 50m.
Groove cutting / floor cutting for stopping / Manhole by chisel & hammer. (For plate form fixing) (a) Hard Stone.
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level: 1:2:4 (1 Cement : 2 Coarse Sand : 4 Graded Stone aggregate 20mm normal size)
Loading of materials into tub in surface.
Un-loading the materials at destination point in UG.
Transportation of 100m track line (i.e. 100m x 2 = 200m rail of 30 lbs) from surface / old working to site of installation in UG for a lead of 2 Km. Scope of work: - (a) Pushing the trolley up to the storage site of rail. (b) Loading the rail in to the trolley. (c) Tightening the rail with the trolley. (d) Pushing the loaded trolley up to the incline mouth / haulage facility at a lead of 100m. (e) Transportation of rail through haulage to negotiate the curve as & when required. (f) Transportation of rail up to end of track line of the district. (Transportation of track line from 102L / C1 dip - 1 dip).
Laying of haulage track line of 100m length with 30 lbs rail on both side of the track (i.e. 100m x 2 = 200m) and installation of crossing on track line in underground. Scope of work:- (a) Transportaion of nut, bolt, fish plate, and dog nail from surface / old working. (b) Cutting and levelling as and when required. (c) Laying of sleeper at the site. (d) Placing the sleeper in position. (e) Laying of rail on both side of track. (f) Positing the rail over the sleeper. (g) Fixing of rail with sleeper by dog nail. (Laying of haulage track line along 89L from 12 dip to 1 dip).
Dismantling, transportation and laying / installation of endless haulage considering at a lead of 2 Km. max from old site to new site in UG or from surface to UG. (Dismantling site - 102L / C1 dip to C2 dip, Installation site - 89L / 12 dip).
Line packing including packing with materials as per direction of site incharge.
Mulma cleaning / removal of debris from UG galleries and cleaning of belt roadway and stacking / loading within 50m.
Total impact of GST for the purpose of CTC
ranvijay singh
satish kumar singh
VISHWAKARMA AND SONS
M/S D P LAHIRI
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_260096.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .