Tender Value
₹8.5 L
EMD Value
₹16,949
Closing Date
3 Feb 2026, 6:00 pmClosed
A.M.A.
ZILA PANCHAYAT BALLIA
Construction of drain with Hume pipe chamber for water drainage from village Chaura culvert
2026_UPPRD_1108449_9
673/ZPBALLIA/25-26/DT-09.01.26
Open Tender
Civil Works
Percentage
90 days
BALLIA
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
A.M.A.
₹16,949
Yes
25 Feb 2026
24 Jan 2026
4 Feb 2026
24 Jan 2026
3 Feb 2026
24 Jan 2026
Earth work in excavation Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. S.I No-251
Providing concrete for plain/reinforced concrete1:3:6 in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203
Sand filling in foundation trenches as per drawing and technical specification Clause 305.3.9
Providing and laying 350 mm dia NP-3 RCC hume pipe medium duty confirm to IS458:2003 including collors/spigot jointed with stiff mixture of cement in the proportion of 1:2(1 cement and 2 fine sand ) including testing of joint,all taxes,transportation charges & contractore's profit etc.complete.
M-150 brick work in 1:4 cement & C sand in foundation and plinth including supply of all materials, labour and T&P etc. as per Analysis
12mm thick plaster on plain surface of wall with cement mortar consising of I part cement and 4 part of approved coarse sand . As per Analysis
RCC Grade M25 RCC Grade M25 (Using Concrete Mixer)
HYSD Bar Supplying, fitting and placing HYSD bar reinforecement in super-structure complete as per drawing and technical specifications
constructionof embankment with approved material obtained from barrow pits with a lift up to 1.5m transporting to site spreading to required slope and compacting to meet requirement of tables 300.1and 300.2 with a lead 1000m as per technical specification clause 301.5
S/F of signboard with photography
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.08 MB
BOQ_2046405.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .