Loading…
Loading…
Tender Value
₹7.2 L
EMD Value
₹8,000
Closing Date
10 Sept 2026, 6:00 pm
Executive Engineer, Und Irrigation Division, Jamnagar
Third Party Inspection / Project Management Agency for the services of Project Management, Construction, Supervision and design review insite / offsite inspection & testing of materials, machinery, equipments, review of QAP etc. for Connecting of Mota Itala & Bijalka Reservoir from Existing Pipeline / Scour Valve of Main Pipe Line of Sauni Yojana Link-1 Package-3 with all allied works etc. complete.
339041
09 of 2026-27
Open
Miscellaneous Services
Works
Jamnagar
8 documents required · 8 mandatory
₹900
EXECUTIVE ENGINEER UND IRRIGATION DIVISION JAMNAGAR
₹8,000
26 Aug 2026
26 Aug 2026
26 Aug 2026
10 Sept 2026
26 Aug 2026
BILL OF QUANTITIES
(A) Percentage Rate Tender (Up to INR 10 Cr.)
Name of work : Third Party Inspection / Project Management Agency for the services of
Project Management, Construction, Supervision and design review insite /
offsite inspection & testing of materials, machinery, equipments, review of
QAP etc. for Connecting of Mota Itala & Bijalka Reservoir from Existing
Pipeline / Scour Valve of Main Pipe Line of Sauni Yojana Link-1 Package-3
with all allied works etc. complete.
Item Description of Item (with brief Quantity Unit Rate In Amount
No. specification and reference to book of figures
specifications)
1 Third Party Inspection / Project Management 1.00 Job 721000.00
Agency for the services of Project Management,
Construction, Supervision and design review
insite / offsite inspection & testing of materials,
machinery, equipments, review of QAP etc. for
Connecting of Mota Itala & Bijalka Reservoir
from Existing Pipeline / Scour Valve of Main
Pipe Line of Sauni Yojana Link-1 Package-3
with all allied works etc. complete.
I am/we are willing to carry out the work at ____________________ % below/above percent
(Should be written in figures and words) of the estimated rates mentioned above. Amount of
My/Our tender works out as under :-
Estimated Amount Rs. 7,21,000=00 Estimated Amount Rs. 7,21,000=00
Put to Tender Rs. Put to Tender Rs.
Deduct _______% Below Rs. __________ Add _______% Above Rs. __________
Net Rs. Net Rs.
(Rupees in words) ________________________ (Rupees in words) ________________________
1. The Contractor shall exhibit a board with detailed specification and details of work as
directed by the Engineer-In-Charge for which no extra payment shall be made.
2. The labour cess will be deducted as per prevailing rules i.e.1% of the work done.
3. GST and Income tax TDS will be deducted at a source while making payments of bills
4. In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per
Govt.G.R.:PRC-10/2017CementConsumption/16/CDate:11/05/2017as stated in S.O.R.
therefore in R.C.C. items where there is a change as per actual mix design the cost of
difference of cement consumption have been deducted from the rate of original item at the
rate of input rate mentioned in all the tender. DELETED
5. The rates to be quoted by the contractor must be inclusive of all duties, taxes, and other
levies except GST payable by the contractor under the contract.
Signature of Contractor Deputy Executive Engineer
Irrigation Project Sub Division No.5/1
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
SBD TPI Bijalka and Mota itala.pdf
BOQ.pdf
Tender Notice No.9.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].