| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.7 CrAccepted-AOC | ₹2.7 Cr | L1 | Accepted-AOC Stood L1 |
| 2 | L2₹2.8 Cr+₹8.5 L (3.11%)Rejected-Finance | ₹2.8 Cr+₹8.5 L (3.11%) | L2 | Rejected-Finance Not Lowest Tender |
| 3 | L3₹2.8 Cr+₹8.8 L (3.21%)Rejected-Finance D NO 39 9 99 56 FLAT NO 501 SRI SAMPATH RESIDENCY MURALINAGAR VISAKHAPATNAM 530 007 | VISAKHAPATANAM | ANDHRA PRADESH | 530007 | ₹2.8 Cr+₹8.8 L (3.21%) | L3 | Rejected-Finance Not Lowest Tender |
| 4 | L4₹2.9 Cr+₹13.3 L (4.86%)Rejected-Finance | ₹2.9 Cr+₹13.3 L (4.86%) | L4 | Rejected-Finance Not Lowest Tender |
| 5 | L5₹2.9 Cr+₹18.5 L (6.73%)Rejected-Finance | ₹2.9 Cr+₹18.5 L (6.73%) | L5 | Rejected-Finance Not Lowest Tender |
Tender Value
Refer Docs
EMD Value
₹7.4 L
Closing Date
2 Jan 2021, 6:00 pmClosed
Asst. Gen. Manager (E-C) - I
Airports Authority of India, Tirupati Airport, Renigunta
Construction of Perimeter Wall at Tirupati Airport. SH Construction of Boundary Wall at Left out Portions along the Periphery of Newly Acquired Land
2020_AAI_61378_1
AAI/ TPT/AGM(E-C)/Boundary Wall /2020-21
Open Tender
Civil Works - Buildings
Item Rate
270 days
AAI, Tirupati Airport
Please refer Tender documents.
12 documents required · 12 mandatory
₹1,180
₹7.4 L
1 Feb 2021
17 Dec 2020
8 Jan 2021
17 Dec 2020
2 Jan 2021
17 Dec 2020
17 Dec 2020 - 28 Dec 2020
Amount
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil.
Boring, with hydraulic piling rigs with power units, providing and installing cast in situ single under reamed piles of specified diameter and length below pile cap in M-25 cement concrete, to carry a safe working load not less than specified, excluding the cost of steel reinforcement but including the cost of boring with bentonite solution and the length of the pile to be embedded in pile cap etc. all complete (Length of pile for payment shall be measured upto to the bottom of pile cap) Boring, providing and installing cast in situ single under reamed piles of specified diameter and length below pile cap in M-25 cement concrete, to carry a safe working load not less than specified, excluding the cost of steel reinforcement but including the cost of boring with bentonite solution and the length of the pile to be embedded in pile cap etc. all complete. (Length of pile for payment shall be measured upto to the bottom of pile cap) 300 mm dia piles.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:5:10 (1 Cement : 5 coarse sand :10 graded stone aggregate 40 mm nominal size).
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m.
Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge. All works upto plinth level
Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge. All works above plinth level upto floor V level
Centering and shuttering including strutting, propping etc. and removal of form for :Foundations, footings, bases of columns, etc. for mass concrete
Centering and shuttering including strutting, propping etc. and removal of form for : Lintels, beams, plinth beams, girders, bressumers and cantilevers
Centering and shuttering including strutting, propping etc. and removal of form for : Columns, Pillars, Piers, Abutments, Posts and Struts
Steel reinforcement for R.C.C. work including straightening, cutting,bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars
Steel reinforcement for R.C.C. work including straightening, cutting,bending, placing in position and binding all complete above plinth level. Thermo-Mechanically Treated bars
Brick work with non modular fly ash blocks conforming to IS:12894, class designation 10 average compressive strength in foundations upto plinth level : Cement mortar 1:6 (1 cement : 6 coarse sand)
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in : Cement mortar 1:6 (1 cement : 6 coarse sand)
12 mm cement plaster of mix 1:6 (1 cement : 6 coarse sand)
15 mm cement plaster on the rough side of single or half brick wall of mix : 1:6 (1 cement : 6 coarse sand)
6 mm cement plaster of mix : 1:3 (1 cement : 3 fine sand)
Finishing walls with Acrylic Smooth exterior paint of required shade New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm)
Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.
Steel work welded in built up sections/ framed work, including cutting,hoisting, fixing in position and applying a priming coat of approved steelprimer using structural steel etc. as required In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works
Providing and fixing concertina coil fencing with punched tape concertina coil 600 mm dia 10 metre openable length ( total length 90 m), having 50 nos rounds per 6 metre length, upto 3 m height of wall with existing angle iron 'Y' shaped placed 2.4 m or 3.00 m apart and with 9 horizontal R.B.T. reinforced barbed wire, stud tied with G.I. staples and G.I. clips to retain horizontal, including necessary bolts or G.I. barbed wire tied to angle iron, all complete as per direction of Engineer-in-charge, with reinforced barbed tape(R.B.T.) / Spring core (2.5mm thick) wire of high tensile strength of 165 kg/ sq.mm with tape (0.52 mm thick) and weight 43.478 gm/ metre (cost of M.S. angle, C.C. blocks shall be paid separately)
Painting with synthetic enamel paint of approved brand and manufacture to give an even shade : -Two or more coats on new work
Providing and fixing PVC pipe of 110 mm dia in brickwork of compound wall for reducing the wind pressure all complete
Providing and fixing in position 12 mm thick bitumen impregnated fibre board conforming to IS: 1838, including cost of primer, sealing compound in expansion joints.
Providing and fixing AAI logo embossed on compound wall in cement mortar 1:4 , including cost of stencil , cement mortar and finishing all complete
Fixing available gate at required location in operational boundary wall i/c shifting of gate weighing of 800 Kg which is available at department store to Construction Site and erecting, keep in position including necessary concreting as directed by Engineer - in - Charge (Cost of concrete will be paid separately)
Garrison Constructions
ARP ENTERPRISES
Sri Pada Constructions
SUBRAMANYAM CONSTRUCTIONS
B Subhagiri
NSC Projects Pvt. Ltd.
Obul Consultancy and Contracts Pvt Ltd
M/S SAI VISHNU CONSTRUCTIONS
M/s NSPR Constructions India Private Limited
Monaarc Corporation Pvt Ltd
stage.html
html • 0.07 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .