Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹31.3 LAccepted-AOC WARD NO 1 HIRA NAGAR HAMIRPUR HP | ₹31.3 L Quoted ₹34.4 L | L1 | Accepted-AOC L1 |
| 2 | L2₹36.5 LAccepted-AOC V P O TEHSIL JAWALAMUKHI DISTT KANGARA HP | ₹36.5 L | L2 | Accepted-AOC L2 |
| 3 | L3₹37.8 LAccepted-AOC | ₹37.8 L | L3 | Accepted-AOC L3 |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | Sudhir Kumar L3 | Anirudh Katna L1 | Vijay kumar kushwaha L2 |
|---|---|---|---|---|---|---|
| 1.00 | Excavation in earth work and disposal of all excavated earth upto a lead of 20mtrs.and lift upto 1.50mtrs. Disposed work earth to be levelled and neatly dressed in spade work. (For crate wall with apron ) | 160 | cum | 325 ₹52,000 | 270 ₹43,200 | 300 ₹48,000 |
| 2.00 | Excavation in earth work and disposing of excavated earth upto all leads and lifts disposed earth to be levelled and neatly dressed in pick work as per entire satisfactions of the Engineer - in - charge.(For Toe Wall ) | 26.25 | cum | 375 ₹9,843.75 | 325 ₹8,531.25 | 365 ₹9,581.25 |
| 3.00 | Wire crates 1.25x1.25x1.25 mtr. from all directions of GI wire filled with square cut faces against the wire in Crate wall & aprons (boulders filling to be measured and paid for separately) 15x15 cms mesh GI wire 5.00mm thick within all leads and lifts | 4,097.44 | Sqm | 450 ₹18,43,848 | 425 ₹17,41,412 | 425 ₹17,41,412 |
| 4.00 | Providing & laying stone filling in apron of Wire Crate walls in wire crates made of G.I wire filled with boulders with squate cut faces against the wire in apron (wire crates to be measured and paid for separately) i/c carriage of materials within all leads and lifts. (In Apron and Toe Wall ) | 157 | Cum | 2,400 ₹3,76,800 | 2,100 ₹3,29,700 | 2,250 ₹3,53,250 |
| 5.00 | Providing & laying stone/crates on guide bank of protection work with boulders with square cut faces against the wire(wire crates to be measured and paid for separately).including entire carriage of material within all leads & lifts and as per directions of the Engineer-in-charge. | 625 | Cum | 2,400 ₹15,00,000 | 2,100 ₹13,12,500 | 2,400 ₹15,00,000 |
Tender Value
₹32.6 L
EMD Value
₹65,136
Closing Date
12 Jan 2026, 11:00 amClosed
EE
Jal Shakti Division Nadaun
Providing Flood Protection Works to Beas River from Nadaun Bridge to Kohla to Save Jal Shakti Vibhag and other Private Property in Tehsil Nadaun Distt Hamirpur HP Under State Disaster Mitigation Fund
2026_HPIPH_125004_1
JS-NDN-CB-Misc.Agr/2025-26/-
Open Tender
Civil Works
270 days
Nadaun area
CO Wire Crate Wall ic crated apron to protect the Jal Shakti Vibhag and other Private property and CO Toe Key Wall along the River side of crate wall RD 474.50 TO 514.50 Rmt JOB 14
8 documents required · 8 mandatory
₹1,500
EE Nadaun
₹65,136
17 Feb 2026
3 Jan 2026
12 Jan 2026
3 Jan 2026
12 Jan 2026
3 Jan 2026
3 Jan 2026 - 12 Jan 2026
Excavation in earth work and disposal of all excavated earth upto a lead of 20mtrs.and lift upto 1.50mtrs. Disposed work earth to be levelled and neatly dressed in spade work. (For crate wall with apron )
Excavation in earth work and disposing of excavated earth upto all leads and lifts disposed earth to be levelled and neatly dressed in pick work as per entire satisfactions of the Engineer - in - charge.(For Toe Wall )
Wire crates 1.25x1.25x1.25 mtr. from all directions of GI wire filled with square cut faces against the wire in Crate wall & aprons (boulders filling to be measured and paid for separately) 15x15 cms mesh GI wire 5.00mm thick within all leads and lifts
Providing & laying stone filling in apron of Wire Crate walls in wire crates made of G.I wire filled with boulders with squate cut faces against the wire in apron (wire crates to be measured and paid for separately) i/c carriage of materials within all leads and lifts. (In Apron and Toe Wall )
Providing & laying stone/crates on guide bank of protection work with boulders with square cut faces against the wire(wire crates to be measured and paid for separately).including entire carriage of material within all leads & lifts and as per directions of the Engineer-in-charge.
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.17 MB
form8.pdf
Tender Documents • 1.12 MB
BOQ_183997.xls
BOQ • 0.34 MB
Termss.pdf
Tender Documents • 0.24 MB
form6.pdf
Tender Documents • 0.36 MB
Download all tender documents and submit your bid