Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
Tender Value
₹21.3 L
EMD Value
₹42,560
Closing Date
30 Nov 2022, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
General Manager
Heavy Water Plant, Manuguru
Dismantling of One number of Rack and Pinion gate assembly supply of 2.2x2.0 metre Rack and Pinion Gate assembly and Erection and Commissioning at Loading station Kondapuram of HWP Manuguru for Bi-cable Aerial ropeway system
2022_HWB_720914_1
HWPM/MU/EC/RPG/2022/01
Open Tender
Machineries/ Mechanical Engg Items
Item Rate
365 days
ECHP, Mechanical Utilities, HWP (M)
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹42,560
2 Jan 2023
5 Nov 2022
2 Dec 2022
5 Nov 2022
30 Nov 2022
5 Nov 2022
5 Nov 2022 - 15 Nov 2022
Amount
Dismantling of existing one (1) number of Rack & Pinion gate assembly from location in the under ground tunnel of Loading station, Kondapuram and re-sizing scrap material to transportable size and shifting scrap material to DPS scrap yard at HWPM site which is 15 KM from loading station
Fabrication of 2.0 M X 1.4 M one (1) number of Rack & Pinion gate assembliy as per drawing enclosed. The scope of work includes "Supply of material, Fabrication/ Machining of equipment as per QAP, Transport of sub assemblies to the site and submission of document.
Erection and Commissioning of the equipments at loading station, Kondapuram. The scope of the work includes erection of scaffolding, Chain pulley blocks, positioning of equipment in the place, cutting and welding operations as per requirement, RCC / PCC patch works, alignment of the equipment, lubrication, checking operation of the equipment and Six (06) months guarantee of the equipment. The area shall be cleared from all debris and scrap material before releasing the equipment for operation.
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .