Loading…
Loading…
Tender Value
₹12.6 Cr
EMD Value
₹25.3 L
Closing Date
18 Sept 2026, 3:00 pm6d left
GM Civil BRIDCUL
BRIDCUL Opp Govt ITI Niranjanpur Saharanpur Road Dehradun
Construction of Hindu Study Center at Doon University, Dehradun (Civil Work).
2026_BRID3_99725_1
1357/BRIDCUL/1091/26 Dated 27.08.2026
Open Tender
Civil Works - Buildings
Item Rate
540 days
Dehradun
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,900
MD - BRIDCUL
₹25.3 L
BRIDCUL Dehradun
3 Sept 2026
3 Sept 2026
18 Sept 2026
3 Sept 2026
18 Sept 2026
11 Sept 2026
10 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | CIVIL WORK | - | - | - | - |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator)/
manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge. ll
ALL kinds of soil | 2,455.9 | Cum | - | - |
| 3 | Extra for every additional lift of 1.5 m or part thereof in excavation / banking excavated or stacked materials. All kinds of soil | 819.83 | Cum | - | - |
| 4 | Treatment of soil under floors using chemical emulsion @ one litre per hole, 300 mm apart including drilling 12 mm diameter holes and plugging with cement mortar 1 :2 (1 cement : 2 Coarse sand) to match the existing floor : With Chlorpyriphos/ Lindane E.C. 20% with 1% concentration(The treatment is to be carried out in three layers; excavation,plinth and appron.) | 760.34 | Sqm | - | - |
| 5 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 5km m and lift upto 2.5 m. | 689.21 | Cum | - | - |
| 6 | Supplying and filling in plinth with Local sand under floors, including watering, ramming, consolidating and dressing complete. | 27.63 | Cum | - | - |
| 7 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size). | 190.04 | Cum | - | - |
| 8 | Providing and laying damp-proof course 40 mm thick with cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 12.5 mm nominal size). | 26.23 | Sqm | - | - |
| 9 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 23.25 | Cum | - | - |
| 10 | RENFORCED CEMENT CONCRETE WORK | - | - | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.31 MB
BOQ_117588.xls
BOQ • 0.48 MB
sbdhindustudydoonuniversityf.pdf
Tender Documents • 11.76 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .