Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹3.1 LAccepted-AOC | 1 | Accepted-AOC Lowest rate quoted bidder | |
| 2 | 2₹3.2 L+₹8,238 (2.65%)Rejected-Finance KUMARAKOM VAIKOM | KOTTAYAM | KERALA | 686001 | 2 | Rejected-Finance Quoted rate is higher than that of lowest rate quoted bidder |
Tender Value
₹4.7 L
EMD Value
₹12,000
Closing Date
19 Jan 2022, 5:00 pmClosed
Assistant Executive engineer
Kuttanad Development Sub Division (MI Sub division) 1st Floor Mini Civil Station Cherthala 688524
SDRF Mitigation of flood damages desilting of Vadakkekadu colony thodu upto pozhichal in ward no 17 and Thoppuvinte thodu in ward No18 of Thuravoor panchayath
2022_Irrig_466991_1
31/AEE/KDSNC/2021-22
Open Tender
Civil Works - Others
Item Rate
120 days
THURAVOOR
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,050
₹12,000
10 Mar 2022
11 Jan 2022
21 Jan 2022
11 Jan 2022
19 Jan 2022
11 Jan 2022
11 Jan 2022 - 15 Jan 2022
Amount
Scheme 1
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
Scheme 2
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
Scheme 3
2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
Scheme 4
2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
Joji Joseph
Bidder Name
Joji Joseph
SAHAJ SAJEEV
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .