Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹1.3 LAccepted-Finance | ₹1.3 L | L-1 | Accepted-Finance Lowest-1 |
| 2 | L-2₹1.3 L+₹5,800 (4.57%)Rejected-Finance VILLAGE DOGHARI PO MOVISERI TEHSIL CHACHIOT DISTT MANDI HP | ₹1.3 L+₹5,800 (4.57%) | L-2 | Rejected-Finance Lowest-2 |
| 3 | L-3₹1.4 L+₹9,600 (7.57%)Rejected-Finance HIMACHAL PRADESH | SHIMLA | HIMACHAL PRADESH | 171002 | ₹1.4 L+₹9,600 (7.57%) | L-3 | Rejected-Finance Lowest-3 |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | DALEEP KUMAR L1 | HET RAM L3 | AMAR NATH L2 |
|---|---|---|---|---|---|---|
| 1.00 | Excavation in foundation, trenches (for pipes & pits) up to all depths in all classification of earth work such as pick work, jumper work, saturated soil including blasting soft/hard rock or chiseling soft/hard rock where blasting is prohibited in all lifts including trimming & dressing of sides, levelling of beds to correct grade i/c shoring/ strutting, planking, timbering wherever required, stacking the useable or unuseable material/ soil separately & after excavated soil clear from the edge of excavation returning the excavated soil after laying jointing testing of pipes in trenches in 15 Cm layers including consolidating of each deposited layer by ramming, watering & then disposing of all surplus excavated soil/unusable material as directed with in all leads & lifts including restoration of unmetalled surfaces to its original condition & including cost of diversion for traffic, night signals, fixing caution boards, crossing over trenches for access to houses, fencing etc. complete in all respect with in all leads & lifts as per the entire satisfaction & directions of Engineer-in-Charge. | 180 | Cum | 460 ₹82,800 Lowest | 480 ₹86,400 | 470 ₹84,600 |
| 2.00Laying, jointing, testing and Carriage of GMS tubes (Light Grade) in trenches including tube fitting such as bends, tees, air valves, unions and collars etc complete (Earth work to be measured and paid for separately) complete in all respect with in all leads & lifts as per the entire satisfaction & directions of Engineer- in- Charge. | ||||||
| 2.01 | 40 mm dia (LG) | 1,000 | Sqm | 44 ₹44,000 Lowest | 50 ₹50,000 | 48 ₹48,000 |
Tender Value
₹1.5 L
EMD Value
₹3,100
Closing Date
21 Apr 2026, 10:00 amClosed
EE
Executive Engineer JS Division Baggi Distt. Mandi H.P.
as per BOQ
2026_HPIPH_134196_1
EE-JSD-BGI/2026- 729-78 dt. 10/04/2026
Open Tender
Civil Works
Item Rate
90 days
Baggi
as per NIT
6 documents required · 6 mandatory
₹350
Yes
₹3,100
Yes
25 Apr 2026
14 Apr 2026
21 Apr 2026
14 Apr 2026
21 Apr 2026
14 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Excavation in foundation, trenches (for pipes & pits) up to all depths in all classification of earth work such as pick work, jumper work, saturated soil including blasting soft/hard rock or chiseling soft/hard rock where blasting is prohibited in all lifts including trimming & dressing of sides, levelling of beds to correct grade i/c shoring/ strutting, planking, timbering wherever required, stacking the useable or unuseable material/ soil separately & after excavated soil clear from the edge of excavation returning the excavated soil after laying jointing testing of pipes in trenches in 15 Cm layers including consolidating of each deposited layer by ramming, watering & then disposing of all surplus excavated soil/unusable material as directed with in all leads & lifts including restoration of unmetalled surfaces to its original condition & including cost of diversion for traffic, night signals, fixing caution boards, crossing over trenches for access to houses, fencing etc. complete in all respect with in all leads & lifts as per the entire satisfaction & directions of Engineer-in-Charge. | |||||
| 2Laying, jointing, testing and Carriage of GMS tubes (Light Grade) in trenches including tube fitting such as bends, tees, air valves, unions and collars etc complete (Earth work to be measured and paid for separately) complete in all respect with in all leads & lifts as per the entire satisfaction & directions of Engineer- in- Charge. | |||||
| 2.01 | 40 mm dia (LG) | - | Sqm | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.46 MB
FORM6_10.pdf
Tender Documents • 0.43 MB
TC.pdf
Tender Documents • 0.16 MB
BOQ_198452.xls
BOQ • 2.11 MB
CORRIGENDUM_21_4.pdf
PDF • 0.42 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .